Loading...
HomeMy WebLinkAbout20211571 Ver 1_Meeting Request Review_20211028 t i DWR Pre-Filing Meeting Request Form NORTH CAROLINA Envlronm¢ntcl avofiry ID#* 20211571 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 10/28/2021 Contact Name* Jason Dilday Contact Email Address* jldilday@ncdot.gov Project Name* U-6026(Knightdale Town-wide Closed Loop ITS System Project Owner* NCDOT Project County* Wake Owner Address: Street Address 1000 Birch Ridge Drive Address Line 2 City State/Province/Region Raleigh NC Postal/Zip Code Country 27610 USA Is this a transportation project?* - Yes No Type(s)of approval sought from the DWR: 401 Water Quality Certification - 401 Water Quality Certification - Regular Express Individual Permit Modification Shoreline Stabilization Does this project have an existing project ID#?* Yes No Do you know the name of the staff member you would like to request a meeting with? Rob Ridings Please give a brief project description below and include location information.* Installation of ITS equipment(i.e.)fiber optic cable,CCTV cameras)on the Knightdale town-wide loop. Please attach the documentation you would like to have the meeting about. U-6026_CE.pdf 2.63MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an application. Signature Submittal Date 10/28/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* Yes No If more information is needed,please add comments for the email notification below.