Loading...
HomeMy WebLinkAboutGW1-2021-03820_Well Construction - GW1_20210823 YY.biiIL k;U1Nb 111 Uq_Il IgJ1'N Jt-L'4.:4J" For Internal Use ONLY: { This form can be used for single or multiple wells I 1.Well Contractor Information: To n / ' 1 M u�� S l4.WATER ZONES , FROM TO DESCRIPTAAION Well Contractor Name go ft ft. V- � a3� NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells OR LINER tf o Ilcablc , FROM TO DIAMETER THICKNESS MATERIAL o �. s ft d in. , Company Name 16.INNER CASING OR TUBING eothermal closed-loop) U FROM TO DIAMETER THICKNESS MATERIAL. 2.Well Construction Permit#: ' I b b 12 O .7 1 R• n in. List all applicable well construction permits(i.e.County.State,Variance,etc.) M ft in. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROMTO DiADtETER SLOT SiZE THICKNS MATERIAL ft. ft. In. ES ❑Agricultural ❑Municipal/Public ❑Geothermal(Heating/Cooling Coolin Supply) ❑Residential Water Supply(single) ft ft. to ( g) g PP Y) PP Y( � g ) ❑Industrial/Commercial ❑Residential Water Supply(shared) FR GROUT FROM TO ATERiAL_ E3IPLACE,'i1ENTMETHoD&AMOUNT Vrri ation 0ft ft ) G URC Non-Water Supply Well: ft ft. J ! ❑Monitoring ❑Recovery ' Injection Well: ft ft ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if a licable FROM TO MATERIAL EMPLACEMENT METHOD []Aquifer Storage and Recovery ❑Salinity Barrier ft fw ❑Aquifer Test ❑Stormwater Drainage ft ft. ❑Experimental Technology ❑Subsidence Control 20.DRILLi1VG LOG atmch additional sheets it necessa OGeothermal(Closed Loop) OTracer FROM TO DESCRIPTION color,hardness,sorUrock G gmin size,etc) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) Q ft. /5 ft C'1 4.Date Wells Completed: " 30 ." / ft Z 5 ft A 1 e () Pleted: oZ3 ft C) ft RO(ujyS��C 5.Well Location: b ft O tc �a hJ eSTQLt�f'll!Qr 6 rt b rt Facility/Owner Name Facility ID#(ifapplicable) M ft ^1 1s 1621? G e r ft. ft Physical Address,City,and Zip 21.REMARKS our Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (ifwell field,one lat/lon/g is sufficient) / f I S �0. co. tP N F0 y,5, 3 J? (' _W Sigoi&ffe of Certified Well Contractor Date 6.Is(are)the well(s): l7Yermanent or ❑Temporary By signing this form.I hereby certify that the rvell(s)was(were)constructed in accordance with 15,4 NCAC 02C.0100 or•ISA NCAC 02C.0200 iFell Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or M71Vo copy of this record has been provided to the ivell owner. Ijthis is a repair,fill out knomi well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. You Site diagram or additional well details: You may use die back of this page to provide additional well site details or well 8.Number of wells constructed: construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONL 7 with the same construction,you can 24.Submittal Instructions: submit one form. 9.Total well depth below land surface: �4O (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifdifferent(example-3tr�e 200'and 2@1001 construction t0 the following: 10.Static water level below top of casing: PIS (ft.) Division of Water Quality,Information Processing Unit, 1617 Mail Service Center,Raleigh,NC 27699-1617 If water level is above casing.use"+' 11.Borehole diameter: YIP (in.) 24b.For Infection Wells: In addition to sending the form to the address in 24a t above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: Jul construction to the following: (i.e.auger(row able,direct push,etc.) Division of Water Quality,Underground Injection Control Program, 13.FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 I3a.Yield(gpm) .� _� 24c.For Water SunDly&Geothermal Wells: In addition to sending the form to Method of test the address(es) above, also submit one copy of this form within 30 days of /4 7-H Amount completion of well construction to the county health department of the county 13b.Disinfection type: where constructed. F.,.,,,r.w-I Nnrth t'nrnlina rMnarnnent of Fnvimnment and Natural Resources-Division of Water Oualitv Revised Jan.201