HomeMy WebLinkAbout20211508 Ver 1_DF176142044137_Worley Cove 430026_Trout Notification_20211102State of North Carolina
Department of Environmental Quality
Division of Water Resources
15A NCAC 02H .0506(b)(4) Water Quality Certification,
Notification of Work in Trout Watersheds
FORM: TroutWS 11-2017
Water Resources
Environmental Quality
Notification of Work in Trout Watersheds Form
A. Applicant Information
1. Processing
1a. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number:
1b. Has the NWP or GP number been verified by the Corps? Yes x No
1c. Does the project meet all the Conditions of the applicable Water Quality
Certification x Yes No
Please note that your project may be subject to the Sediment and Erosion Control Program and/or Trout Buffers
implemented by the Division of Energy, Mineral, and Land Resources. Find more info at:
https://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control
2. Project Information
2a. Name of project: bridge 430026 on SR 1608 (Worley Cove Road) , DF17614.2044137
2b. County: Haywood
2c. Nearest municipality / town: Canton
3. Owner Information
3a. Name(s) on Recorded Deed: NCDOT
3b. Responsible Party (for LLC if
applicable): Dave McHenry
3c. Street address: 253 Webster Road
3d. City, state, zip: Sylva, NC, 28779
3e. Telephone no.: 828/586-2141
3f. Email address: dgmchenry@ncdot.gov
4. Agent/Consultant Information (if applicable)
4a. Name:
4b. Business name
(if applicable):
4c. Telephone no.:
4d. Email address:
B. Project Information
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): none
1b. Site coordinates (in decimal degrees): Latitude: 35.566797 Longitude: - 82.801006
(DD.DDDDDD) (-DD.DDDDDD)
2. Project Description
2a. Explain the purpose of the proposed project (continue on back):
The bridge was destroyed and isolated many residents in the community. Temporary pipes are now
providing service on SR 1608, however a more durable and reliable permanent structure is needed soon.
Bridge 430026 will be replaced on its approximate pre-existing alignment with a modern cored slab bridge,
but some work will be beyond existing disturbed right-of-way.
2b. Describe the overall project in detail, including the type of equipment to be used:
Heavy equipment will be used including drilling rig, dump trucks and track-hoes to build new bridge
foundation away from the creek and stabilize the creek banks in the vicinity of the abutments with rip rap.
C. Stream Impacts: Please list all proposed impacts to the stream
1a. Stream Name: UT North Hominy Creek (Class C)
1b.
Type of impact
Average stream
width (linear feet)
Impact length
(linear feet)
Bank Stabilization - Sloping and Revegetating
x Bank Stabilization - Sloping and Riprap/Armoring 20 67
Bank Stabilization - Gabion Baskets / Retaining Wall
Culvert Installation Culvert Diameter: ______________
Temporary Impacts for required dewatering activities
Other (describe): ____________________________________________
1c. Comments:
Dave McHenry for NCDOT
Division 14
Owner/Agent's Printed Name
_______________________________
Owner/Agent's Signature
(Agent's signature is valid only if an authorization letter from the owner is
provided.)
Date
For non-transportation projects send one (1) copy of the completed application to DWR:
11/2/2021
If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.):
NC DWR - 401 & Buffer Permitting Branch
1617 Mail Service Center
Raleigh, NC 27699-1617
NC DWR - 401 & Buffer Permitting Branch
512 N. Salisbury Street
Raleigh, NC 27604
For transportation projects send one (1) copy of the completed application to DWR:
If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.):
DWR - Transportation Permitting Branch
1617 Mail Service Center
Raleigh, NC 27699-1617
DWR - Transportation Permitting Branch
512 N. Salisbury Street
Raleigh, NC 27604