Loading...
HomeMy WebLinkAbout20211508 Ver 1_DF176142044137_Worley Cove 430026_Trout Notification_20211102State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02H .0506(b)(4) Water Quality Certification, Notification of Work in Trout Watersheds FORM: TroutWS 11-2017 Water Resources Environmental Quality Notification of Work in Trout Watersheds Form A. Applicant Information 1. Processing 1a. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1b. Has the NWP or GP number been verified by the Corps? Yes x No 1c. Does the project meet all the Conditions of the applicable Water Quality Certification x Yes No Please note that your project may be subject to the Sediment and Erosion Control Program and/or Trout Buffers implemented by the Division of Energy, Mineral, and Land Resources. Find more info at: https://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control 2. Project Information 2a. Name of project: bridge 430026 on SR 1608 (Worley Cove Road) , DF17614.2044137 2b. County: Haywood 2c. Nearest municipality / town: Canton 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT 3b. Responsible Party (for LLC if applicable): Dave McHenry 3c. Street address: 253 Webster Road 3d. City, state, zip: Sylva, NC, 28779 3e. Telephone no.: 828/586-2141 3f. Email address: dgmchenry@ncdot.gov 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name (if applicable): 4c. Telephone no.: 4d. Email address: B. Project Information 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): none 1b. Site coordinates (in decimal degrees): Latitude: 35.566797 Longitude: - 82.801006 (DD.DDDDDD) (-DD.DDDDDD) 2. Project Description 2a. Explain the purpose of the proposed project (continue on back): The bridge was destroyed and isolated many residents in the community. Temporary pipes are now providing service on SR 1608, however a more durable and reliable permanent structure is needed soon. Bridge 430026 will be replaced on its approximate pre-existing alignment with a modern cored slab bridge, but some work will be beyond existing disturbed right-of-way. 2b. Describe the overall project in detail, including the type of equipment to be used: Heavy equipment will be used including drilling rig, dump trucks and track-hoes to build new bridge foundation away from the creek and stabilize the creek banks in the vicinity of the abutments with rip rap. C. Stream Impacts: Please list all proposed impacts to the stream 1a. Stream Name: UT North Hominy Creek (Class C) 1b. Type of impact Average stream width (linear feet) Impact length (linear feet) Bank Stabilization - Sloping and Revegetating x Bank Stabilization - Sloping and Riprap/Armoring 20 67 Bank Stabilization - Gabion Baskets / Retaining Wall Culvert Installation Culvert Diameter: ______________ Temporary Impacts for required dewatering activities Other (describe): ____________________________________________ 1c. Comments: Dave McHenry for NCDOT Division 14 Owner/Agent's Printed Name _______________________________ Owner/Agent's Signature (Agent's signature is valid only if an authorization letter from the owner is provided.) Date For non-transportation projects send one (1) copy of the completed application to DWR: 11/2/2021 If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): NC DWR - 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 NC DWR - 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 For transportation projects send one (1) copy of the completed application to DWR: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): DWR - Transportation Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 DWR - Transportation Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604