Loading...
HomeMy WebLinkAbout20171045 Ver 1_Mitigation Site Visit_20210720w XVIT,1]LAN'1)S MEETING MINUTES MEETING: IRT Credit Release Site Walk (MY1) Key Mill Mitigation Site DMS Project No. 100025 USACE Action ID No. SAW-2017-01504 NCDEQ DWR Certification No. 17-1045 MEETING DATE: July 13, 2021 LOCATION: Key Road Ararat, NC Attendees: • Aaron Earley, Wildlands Project Manager • Casey Haywood, USACE Mitigation Specialist • Erin Davis, NC IRT for DWR • Matthew Reid, NC DMS Project Manager • Paul Wiesner, NC DMS Western Regional Supervisor • Sam Kirk, Wildlands Stewardship Lead • Shawn Wilkerson, Wildlands Principal • Todd Tugwell, USACE Mitigation Project Manager • Travis Wilson, NC WRC Eastern NCDOT Permit Coordinator Attendees met at Key Road. 1. Aaron gave an introduction to the site and explained history of flooding and repairs during and after construction. Multiple large storm events (5-year to 25-year return interval) between February 2020 and October 2020 resulted in damages to the channel and washed away topsoil and seed. 2. Todd asked why repairs were made prior to AMP submittal. Aaron said that the draft guidance was relatively new at the time and Wildlands did the best they could based on contractor availability and timing planting season. Wildlands understands the reason for AMP and will adhere to protocol for future sites. 3. Erin asked about the reasons for low stem density. Aaron responded that it was a combination of planting later in the season and poor soil conditions due to the topsoil being washed away by the numerous floods. w WIL1)LANI7S 4. Todd asked what other measures were considered instead of rock lined toe. Aaron responded that brush toe was previously installed multiple times and kept getting washed away during the multiple out -of -bank storm events. Due to the lack of good soil, Wildlands decided to use rock toe to help hold the banks in place. Attendees walked upstream to look at Bull Creek Reaches 1 & 2 and UT1. 5. It was noted that baseflow was piping under the log sill downstream of the culvert crossing on UT1 (STA 211+40). The log appeared to be installed at the right elevation to back water into the culvert. 6. On Bull Creek (STA 106+35—115+10), rock was added along the toe of multiple riffles and pools. This was not part of the mitigation plan. The size (Class 1) of the rock is too large and it was placed on the banks instead of being incorporated into the bank. 7. Erin noted that the live stakes on some banks had low survival rates. S. The berm along the downstream side of the floodplain outlet at STA 113+00 is too high. It would intercept and direct floodplain flows back into the channel at a discreet location. 9. The brush toe logs in the meander bend at STA 112+25 seemed to be too large, set too high, and lacked smaller brush material. 10. The right floodplain elevation on Bull Creek between STA 109+50 and 112+60 was constructed 0.5' —1.0' too high while the left floodplain is at grade. This section of channel appears to be stable. Attendees walked downstream to look at Bull Creek Reaches 3 & 4. 11. Travis noted the cattails in the wetland pocket near Bull Creek STA 155+50 left floodplain. 12. On Bull Creek (STA 160+70—165+60), rock was added along the toe of multiple riffles. Similar to item 6, this was not in the mitigation plan and size and placement were concerning. 13. The berm and multiple rock -lined floodplain outlets installed in the left floodplain of Bull Creek (STA 160+60—166+00) is preventing diffuse flow across the vegetated buffer. The length of rock placement in the floodplain outlets was considered too extensive. Travis noted the size of the rock in the floodplain outlet at STA 163+00 was too large for turtles. 14. Erin noted the presence of privet along the Bull Creek woodline (STA 160+50—167+56). Action Items Attendees agreed that the items in Table 1 need to be completed by MY2 to bring the site back into compliance and release credits. If the items are satisfactorily addressed by MY2, then no additional monitoring years will be required. Please refer to the attached plans for locations and stations. Table 1: Action Items Item Description Action Al UT1 STA 211+40 Piping under log sill. Reset log sill to prevent piping. A2 Rock -lined outer meander bends on Remove rock placed on outer meander bends and Bull Creek STA 106+35—115+10. replace with brush toe or proper rock toe with geolift. w WILDLANDS A3 Sections of low live stake survival rate. Ongoing live stake planting where survival rate is low. A4 Raised berm along floodplain outlet at Remove berm to allow floodplain flow to flow down - Bull Creek STA 113+00. valley unimpeded. AS Cattails present in wetland pocket at Treat cattails throughout the site to prevent spread Bull Creek STA 115+50. and colonization. A6 Parallel berm along Bull Creek STA Remove parallel berm to allow diffuse sheet flow 106+60 — 166+00. across vegetated buffer. A7 Extensive length of rock in floodplain Remove rock from upper section of floodplain outlet. outlets along Bull Creek 106+60 — Stabilize with juncus transplants and/or matting. 166+00. A8 Privet along Bull Creek woodline STA Ongoing invasive treatments to include privet. 160+50—167+56.0. A9 Multiple rock -lined riffles banks on The rock toe added to the riffles will be left in place Bull Creek STA 106+35 — 165+60. and jointed planted with juncus and willows. Riffles will be reevaluated in MY3. If the rock does not incorporate into the banks (soil & veg within voids, sink into banks), then Wildlands will address at that time or a discussion will be held regarding a credit adjustment. Attachments Project Component/Asset Map IRT Credit Release Site Walk Action Plan Set I F, lB L- _J Conservation Easement Project Parcel Internal Crossings Existing Wetlands Restoraton Enhancement II = Preservation Not for Credit --- Alignment Deviation Non Project Streams OO Reach Breaks 1 1 I 1 1 I 1 1 I i I 0 250 500 Feet WILDLANDS%�p I I I I ENGINEERING Figure 2 Project Component/Asset Map Key Mill Mitigation Site DMS Project No. 100025 Monitoring Year 1- 2020 Surry County, NC Key Mill Mitigation Site - Record Drawings Surry County, North Carolina Yadkin River Basin HUC 03040101 Surry County, NC 4� N �S 0 as �e Hlack Water SITE Za59 Ararat l?Oad Ash MITI 0 d. Vicinity Map Not to Scale for NCDEQ Division of Mitigation Service Environmental Quality Record Drawings August 27, 2020 CERTIFICATE OF SURVEY AND ACCURACY I, __ PHILLIP B. KEE CERTIFY THAT THE GROUND TOPOGRAPHIC SURVEY PORTION OF THIS PROJECT TXS COMPLETED UNDER MY DIRECT SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY DIRECT SUPERVISION; THAT THE RECORD DRAWINGS WERE PREPARED BY _WILDLANDS_ENGINEERING, INC._ FROM DIGITAL FILES PROVIDED BY KEE MAPPING AND SURVEYING, PA AS SHOWN ON AN AS —BUILT SURVEY FOR KEY MILL MITIGATION SITE AREA A_WEST & AREA B—EAST_", Job #1 Z2@79=A@—, DATED 03f2_0_LAREA_A=WEST1 & 02120 IALEA—B=EAST1; THAT THIS SURVEY WAS PERFORMED AT THE 95% CONFIDENCE LEVEL TO MEET THE FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS AND TO MEET THE REQUIREMENTS OF A TOPOGRAPHIC SURVEY TO THE ACCURACY OF CLASS A HORIZONTAL AND CLASS C VERTICAL WHERE APPLICABLE; THAT THE ORIGINAL DATA WAS OBTAINED BETWEEN THE DATES OF 9R1-�1$119 (AREA A --van_&_ 04 28 20=06f04 20 AREA B=EAST ; THAT THE CONTOURS SHOWN AS BROKEN LINES MAY NOT MEET THE STATED STANDARD AND ALL COORDINATES ARE BASED ON NAD 83 (NSRS 2011) AND ALL ELEVATIONS ARE BASED ON NAVD 88; THAT THIS MAP MEETS THE SPECIFICATIONS FOR TOPOGRAPHIC SURVEYS AS STATED IN TITLE 21, CHAPTER 56, SECTION .1606; THAT THIS MAP WAS NOT PREPARED IN ACCORDANCE WITH G.S. 47-30, AS AMENDED AND DOES NOT REPRESENT AN OFFICIAL BOUNDARY SURVEY. WITNESS MY ORIGINAL SIGNATURE, LICENSE NUMBER, AND SEAL THIS _6TH _ DAY OF 9DT0@ER , -2QZQ-, A.D. ,�uuiuun,� :a SEAL L-4647 �� SU•' PHILLIP B. KEE, PLS L-4647 Pie IRT Credit Release Site Walk Action Plan July 13, 2021 Adaptive Management Plan - As-built/Record Drawings - 2021 Sheet Index Title Sheet General Notes and Legend Project Overview Stream Plan and Profile Planting and Fencing Plan Project Directory Engineering: Wildlands Engineering, Inc License No. F-0831 1430 S. Mint St., Ste. 104 Charlotte, NC 28203 Aaron Earley, PE, CFM 704-332-7754 Surveying: Kee Mapping & Surveying Box P.O.2566 Asheville, NC 28802 Phillip B. Kee, PLS 828-575-9021 0.1 0.2 0.3 1.1-1.23 2.1-2.9 Owner: NCDEQ Division of Mitigation Services 5 Ravenscroft Drive, Ste 102 Asheville, NC 28801 Matthew Reid 919-707-8976 DMS Project no. 100025 Yadkin River Basin HUC 03040101 USACE Action ID: SAW-2017-01504 ``l�pI uulrrr�rp�fJ =off ° cam•. ���rhrrlunv�N� (n t1A C) - O O (13 U O O +� Z cn C: 4-J O co O OD U = cn Q) Y 4- a� a� a� 4- Existing Features Pre -Construction Property Line oHE Pre -Construction Overhead Electric E j Pre -Construction Power Pole Pre -Construction Tree Pre -Construction Pond r r r Notes: 1. Deviations from Design will be shown in Red. 2. Both the As -Built surveyed thalweg alignment and Design Centerline are depicted in this plan set. 3. The Design Centerline stationing is used for the profiles as well as project credit stationing. 4. Pre -construction topography by Kee Mapping and Surveying March 16, 2018. 5. Boundary survey by Kee Mapping and Surveying June 1, 2018. 6. As -built survey west of Key Road November 1, 2019. 7. As -built survey east of Key Road June 9, 2020. Design Features 10+00 — t — Design Thalweg Alignment — — — — — — - 100 - — — — — — — Design Major Contour — — — — — — — — — — — — — — — Design Minor Contour Design Terracell 140 Cattle Crossing Design Road over Culvert Design Various Constructed Riffles Per Plans Design Brush Toe Design Sod Mat vvvvvvv v v v v v v 1 vvvvvvv Design Brush Mattress 0 o Design Boulder Toe Design Log Sill a Design Log J-Hook Design Boulder) -Hook Design Log Vane pOC, Design Rock Sill Design Cover Log Design Rock Vane Design Lunker Log As -Built Features As -Built Thalweg Alignment As -Built Bankfull 0 As -Built Major Contour As -Built Minor Contour goo LOD As -Built Limits of Disturbance As -Built Culvert x x As -Built Fencing CE CE CE Recorded Conservation Easement — CS-XS — CS-XS CS-XS — Recorded Internal Crossing at Conservation Easement As -Built Various Constructed Riffles Per Plans As -Built Brush Toe L�G As -Built Boulder Toe / Riprap ® As -Built Log Sill As -Built Log Vane pOQ As -Built Rock Sill 00 As -Built Log J-Hook W Monitoring Features 0— > > 0 Permanent Cross Section F- VEG VP# m Vegetation Plot VEG PP# Photo Point CG# Crest Gage SG# Stream Gauge BT Barotroll Repair Features Repair areas/items are outlined with a red polygon and the type of repair and when it was conducted is denoted in a call out box. Repair issue ``1�p11tuirrrJrp�fJ z�•. Ldqy U:w W-k Wn ���u+ruunv�N� rn Ca0 fB � r0 o O v U N cr_ _r_ 4J s_ v o z N o � 1p 73 ra o tto U G � s_ C= V) G Y `t STA.200+21 1c' - - START REACH UT1A 1 1------------� Z SMITH �f 'IN _5926-77-7125 DE90PG_890 a �y o Pe 19PG146 STA 450+38 yF�T START UT3 �--'-� O o \ I 11v o 1' STA.210+97 �M --- ^� STA.208+85 l STA450+56 J END UT1A .70g� END REACH UT113 �^ BEGINUTIB 85 `STA.211+36 END UT3 a00x0 �' '. LNDA S. KEY a START REACH UTIC '7 fs, PIN 5926-00-77-7192 2e"`uJ a DB: 302 PG: 610, OR: 385 PG: 465 & T OR 325 PG: 18D O REFERENCES FOR DB 302 PG: 610 & DB: 385 PG: 465 yc� y TRACT I -DB: 124 PAGE 426 STA. 213+93� STA. 400+57 TRACT 2 - DB: 149 PG: PG: 69 T TRACT 3 - DB: 117 PG: 278 END UTIC // START UT3A TRACT 4 - DR: 124 PG: 375, SECOND TRACT w i STA. 404+70 END REACH UT3A STA. 100+95 I 1.4 o START REACH UT313 START BULL CREEK REACH 1A \ 1 SHEET 1I M o OO - SHEET STA. 310+82 ] a •� END UT2C P� �~ �tY1Q \S" 105+00 1.2 SHEET 13 h J STA. 407+77 STA. 116+79 17 Ox0 END REACH UT313 END BULL CREEK REACH 2 �_ STA. 408+12 J ANNDDSSAR ZAHLHARDV \ ARAN SMITH START UT3C PIN sez6 e6 6552 '- 37 a� STA. 150+30 LIN AS. KEY PIN: 5926-00-77-7192 DR : 302 PG: 610, DB: 385 PG: 465 & D6: 325 PG: 180 REFERENCES FOR DE. 302 PG: 610 & DB: 385 PG: 465 TRACT 1- DR : 124 PAGE 426 TRACT 2 - DR : 149 PG: PG: 69 TRACT 3 - DB: 117 PG: 278 TRACT 4 - D13 124 PG: 375, SECOND TRACT Reach Reach Start End Station Type of Mitigation Northing Easting Station Bull Creek R1A 967255.23 1526843.10 100+95 105+39 Restoration Bull Creek R113 966953.15 1527027.89 105+39 112+61 Restoration Bull Creek R2 966864.77 1527613.64 112+61 116+79 Restoration Bull Creek R3 966807.00 1528127.22 150+30 167+56 Restoration Bull Creek R4 966185.55 1529301.19 167+56 174+39 Preservation UT1A 968069.36 1527267.64 200+21 208+85 Enhancement 11 UT1B 967430.25 1527721.40 208+85 210+97 Restoration UT1C 967245.93 1527800.36 211+36 213+93 Restoration UT2 965906.42 1527791.97 350+00 350+42 Restoration UT2A 965925.08 1527767.27 300+00 303+15 Restoration UT2B 966181.96 1527894.24 303+50 306+13 Restoration UT2C 966402.88 1528032.86 306+13 310+82 Restoration UT3 967436.62 1528615.63 450+38 450+56 Enhancement 11 UT3A 967430.52 1528625.75 400+57 404+70 Enhancement 11 UT313 1 967094.08 1528563.75 404+70 407+77 Restoration UT3C 1 966848.62 1529451.56 408+12 412+24 Restoration to C -0 0 0 (� U C N 0 a_+ Z N _ C: 4-J IDS 1169 PG 387 BEGIN BULL CREEK BULL CREEK REACH 3 10+00' � l " m '� t 1� sHEE 0 +_� C O ,� � � o STA. 105+39 - - __ _ _ STA.112+61 ox ?y N w a 00109126 � 0 U END BULL CREEK REACH lA - - -_ END REACH 18 y��4 „ 160+p0 PINE593 START BULL CREEK REACH 1B START REACH 2 - DB. 1625 DB 282 _.'. PORTION OF DB: 239 PC. 675 155+00 L STA.306+13 END REACH UT26 a BEGIN REACH UT2C T18 305+00 SHEET 1.6 BULL CREEK Y !� STA.412+24 ® A, END UT3C I, oAIN / STA. 303+15 \ ` 168+00 END REACH UT2A STA.303+50 START REACH UT2B c 170+ 0 nW \ cE \ cf ^/ 0 STA. 350+42 -��� \ OF cE �_ - cE - _ - END REACH UT2 ---- f STA. 167+56 SH fEr1.10 SHEET 1.11 - MARv L. HOLVFIELO HEIRS END REACH 3 PIN 5926-00-75-4918 m START REACH 4 DB: 204 PG: 127 REF.: DR: 167 PG: 581 c, STA. 174+39 HOMEPL I NE RECR5936-00-I05-79PARK, INC. O END REACH 4 D13 1025 PG: 756 TRACTS I & 2 N �^/ & DB: 1201 PG: 1206 I�t / PB: 19 PG: 29 & PB: 24 PG: 160 IY e N STA.300+00 START REACH UT2A 1�"� c STA. 350+00 o inwu x START REACH UT2 o a a o^ m o a o 0' E 150' 300' 450' W m A y (HORIZONTAL) u '� 1105 1100 1095 1090 4- 106+00 Rock -lined toe within riffles will be jointed planted with juncus and Pillows. DESIGN GRADE AS -BUILT GRADE 106+50 107+00 107+50 108+00 108+50 1105 1100 1095 I I I I I+ 1090 109+00 109+50 / I _ I I Ind Nov 2020: Regrai and matted bank 0 VP1 I 1: Replaced brush p geo-lift with �� +/, toe. IOC 1ti0o rock lined IN ith brush toe Iz J lift. I=_ 3') IU 3� I� _A0 0' 2' 4' 6' (VERT—) v 0' 20' 40' 60' 3 dryAOx N� X��FoM0 N.a, 4z1M;;LL A v� W �Zou~ £ � LL ``1�p11tulrrr�rp�fJ 'w w LA CO � C) C: .O -0 L � NOTE: O f>3 1. STA. 107+40: THE LOG SILL AND LOG VANE WERE U U OMITTED DUE TO PRESENCE OF BEDROCK. o 4- Z o C: 00 U a Y Sheet Index 1.12 UT1 4] m -1 O L d U v c CC ro a� �a UE 5 `0 m 1.13 1a UT3 0 N 1.15 1.21 1.1 1 1.16 1.5 1.22 1.2 1.3 .23 1' 1.19 O ti Q z V 1.9 N 1.6 1. N c a 1.18 ? c 4 1.20 1.10 1.11 1.17 BULL CREEK UT2 E �y 1100 1095 1090 1085 109+50 Rock -lined toe within riffles will be jointed planted with juncus and Pillows. 110+00 110+50 111+00 i 111+50 112+00 Remove earthen berm from downstream side of floodplain outlet / 1099 `c — E x � CE 1096 Nov 2020: Rebuilt BULL CREEK REACH 1B / \ riffle and reset log sill Nov 2020: Rebuilt and laid back %T point bar and rebuilt riffle PP3� vp1 o i VIG _ — i Ir i Nov 2020: Moved '••'•�••• Nov 2020: Extended / rock -lined floodplain brush toe Outlet that was STA. 110+48: THE LOCATION OF 11 O installed between AB X53 WAS ADJUSTED AFTER THE AS-BUILTO�X / and Oct 2020 COLLECT D SOT WAS / COLLECTED SO THAT IT NO ti LONGER SHARES A LEFT CROSS SECTION PIN WITH XS2. 3J 3J V / 31) ---------- A-Z��/ 3J 33 ��/ 30 _ 31 3J _ 3� 112+50 113+00 Mar�2021:dedfloolet STA 112+61 END BULL CREEK REACH 1B I RESTORATION START BULL CREEK REACH 2 RESTORATION 1 Nov 2020: Regraded and matted bank 0' 2' 4' 6' 1100 (VERT-) 0' 20' 40' 60' (HORvaNTAI) N 1095 1090 1085 113+50 Nov 2020: Repaired brush toe along left bank Mar 2021: Replaced brush toe with geolift and boulder toe I, Replace rock lined bank with brush toe Nov 2020: and geolift. Regraded Z°9s I matted bank I / 772% Nov 2020: I m Regraded and matted bank G�rl. Q. Between AB and Oct 2020: IN Replaced lunker log with brush IuJ toe Z aJ Nov 2020: Repaired brush toe EJ / 3J and added geolift IU 33 I Q 1.1 rA CO � -0 O O fB c� U 1 i O +� Z to O C: ra O OD U G � _ =3 N T a Y Sheet Index U cc) f} r1 o � a U v c CC ro a� a� a U E 5 (0 ,0 N 1.12 UT1 1.13 1a UT3 0 N 1.15 1.21 1. 1.11.5 1.22 0 0 23 1. 1.3 1.19 1.9 1.6 1. N c a m 1.18 N c 1.20 1.10 1.11 1.17 BULL CREEK UT2 E a o 1095 1090 1085 1080 113+50 Rock -lined toe within riffles will be jointed planted with juncus and willows. 114+00 y Between AB and Oct 2020: n� Replaced boulder toe with = brush toe r� Mar 2021: Replaced brush toe Z1 with geolift and boulder toe m �1 y� STA. 114+32: CREST GAGE W �! WAS MOVED UPSTREAM AFTER THE AS -BUILT OI SURVEY WAS COLLECTED TO AVOID THE POSSIBILITY OF FALSE BANKFULL READINGS IN THE EVENT THAT WATER SHOULD Nov 2020: Scraped �ndBACK UP AT THE rematted bank CONFLUENCE Nov 2020: Repaired riffle 1 I 114+50 115+00 1095 Repaired riffle `ICJ 115+50 le" T', VP2 �o�� PP4A o 0 Nov 2020: Scraped and / rematted bank and repaired BULL CREEK REACH 2 brush toe STA. 115+88: THE LOCATION OF X54 WAS ADJUSTED AFTER THE AS -BUILT SURVEY / WAS COLLECTED BECAUSE THE CROSS SECTION WAS INADVERTANTLY DISTURBED FROM CONSTRUCTION 5} EQUIPMENT DURING CHANNEL REPAIRS FROM A LARGE STORM EVENT. 3, \ 3 116+50 STA 116+79 END BULL CREEK REACH 2 RESTORATION 0' 2' (VERT—) 4' 6' 1095 0' 20' 40' 60' (HORIZO—) N 1090 1085 1080 116+79 NOTES: 1. STA. 113+80: LOG SILL WAS SUBSTITUTED FOR ROCK SILL DUE TO LOCAL MATERIAL AVAILABILITY AND SITE CONDITIONS. 2. STA. 113+85: BRUSH TOE WAS SUBSTITUTED FOR BRUSH MATTRESS DUE TO SUFFICIENT BANK STABILITY FOLLOWING CONSTRUCTION OF THE PROPOSED CHANNEL. 3. STA. 115+45: BRUSH TOE WAS SUBSTITUTED FOR BOULDER TOE DUE TO SUFFICIENT BANK STABILITY FOLLOWING CONSTRUCTION OF THE PROPOSED CHANNEL. 4. STA. 116+00: LOG SILL WAS SUBSTITUTED FOR ROCK SILL DUE TO LOCAL MATERIAL AVAILABILITY AND SIMILAR FUNCTIONALITY. 5. STA. 116+62: PHOTO POINT 4A WAS ADDED AFTER THE SURVEY WAS COMPLETED AT THE REQUEST OF DMS TO CAPTURE THE CONSERVATION EASEMENT BREAK. Sheet Index 1)1.3 12 UT3 1.21 .5 1.22.23 1.1.91.61.8 1.10 1.: BULL CREEK UT2 ��1,,,114I l i I l r 1r1j2fJ �C•� Ldqy U'm -4 •w w I�f�o�rruunu���s` (A rA fO � -0 .O O (a U U 4) 1 L o a_+ Z to O C: B..+ =3 C)A U 4- _ =3 —C Ln G Q� Y 10 10 10 )5 \ 57" x 38" CMP ARCH PIPE 00 \ I � I � \I I i DESIGN GRADE—' 95 I � AS -BUILT GRADE I � I 90 L- 87 0' 2' 4' 6' (VERT—) v 1105 �} 0' 20' 40' 60' Z oN ry o 0 x -�FMLL (HOflIZOMAL) « Z m M no A 62 2 � -.0 � LL 1100 ``1�p11tulur�rp�fJ �U-m 17;CN=„y � 1095 1090 1087 208+85 209+00 209+50 210+00 210+50 211+00 211+50 212+00 212+50 213+00 STA. 208+85 1 \ END REACH UT1A STA. S MOVED : CREST 10 ENHANCEMENT II WAS MOVED UPSTREAM \ START REACH UT16 57" x 38" CMP PIPE AFTER THE AS-BUILTSURVEY Nov 2020: Repaired crossing cr1 ARCH (39LF) WAS COLLECTED TO AVOID TA RESTORATION around downstream side of x STA. 210+97 THE POSSIBILITY OF FALSE U/S INV.:'^�95(1095.24') culvert and added additional rip BANKFULL READINGS IN THE Q D/S INV.: i094.65 (1094.80') rap on downstream face of EVENTTHAT WATER SHOULD 1 �j w C " ROADWAY ELEV.: 1101 Crossing BACK UP AT THE CONFLUENCE. >E _ z \ VP6 UT1B CE 0CE c 1 J �y UT1C v� ti --- 'c 1104 __ Nov 2020: Installed QC - PP14f i --- 1 log sill 1 G -- --- 3300 1095 - ----- - �h� f0 •0 1 o _ PP14B Nov 2020: Regraded jo _ — > _ o Q - and matted bank _' / _ 0 _ 1105- 110s - - PP14A- °; �; --- s �, Reset log sill to 00 �1110 -- Nov 2020: Regraded prevent piping \ ° 1100 and matted bank 109 CG2 s l XS x Mar 2021: Installed 1 �� 1 bouldertoe oo, Mar 2021: Installed 10 oyo STA. 209+24: CROSS SECTION 9J ••e 3J li brush toe 1 IOgC x RELOCATED AFTER THE AS -BUILT • • STA. 210+97 -"'max 1 f SURVEY WAS COLLECTED BECAUSE THE CURRENT RIFFLE END REACH UT1B STA. 211+36 START REACH UT1C' x ' 1 LOCATION BETTER REPRESENTS RESTORATION RESTORATION `jP9 2 \ THE CONDITIONS OF THE REACH. 1 � 1 1 (A f0 � C) C: .O -0 L � 0 f0 c� U a--L i L N 0 a_+ Z NOTE: N 1. STA. 209+65: RIFFLE, ROCK SILL AND POOL WERE OMITTED DUE TO SUFFICIENT STABILITY AND SLOPE ON 0 C: THE REACH. — � 2. STA. 210+83: PHOTO POINT 14A WAS ADDED AFTER THE (�10 0 SURVEY WAS COMPLETED AT THE REQUEST OFDIMS TO 00 U CAPTURE A DOWNSTREAM VIEW OF THE CULVERT CROSSING. 3. STA. 211+57: PHOTO POINT 14B WAS ADDED AFTER THE L SURVEY WAS COMPLETED AT THE REQUEST OF DIMS TO =3 CAPTURE AN UPSTREAM VIEW OF THE CULVERT — to CROSSING. C 4. STA. 212+35: UPSTREAM ROCK AND ROLL RIFFLE G BOULDER SILL WAS OMITTED AND RIFFLE WAS EXTENDED TO CONNECT TO DOWNSTREAM ROCK AND ROLL RIFFLE. UT2 Sheet Index a) 0 i d UT3 0 0 �1.21 e N 23 21. o 1.9 O N. Q zz , V 1 N c a Ln o 1.10 ' BULL CREEKll < v E 3 y CLASS B/1 BACKFILL (Lift Removed for Clarity) NOTES: 1. INSTALL CLASS B/1 RIPRAP MIXTURE IN 1.0' LIFTS. COMPACT EACH LIFT. 2. SET MATTING FOR FIRST LIFT. 3. INSTALLSOIL AND COMPACT WITH PLATE COMPACTER. 4. SEED, MULCH AND INSTALL EROSION CONTROL MATTING AND BANK STABILIZATION PER PLANS. S. REPEAT FOR SUBSEQUENT LIFTS. 6. LIVE CUTTINGS SHALL CONSIST OF BLACK WILLOW, SILKY WILLOW, OR SILKY DOGWOOD. BANKFULLL WIDTH PER TYPICAL POOLSECTION 12" THICK LIFT, STACKED 2 HIGH COMPACTED BACKFILL AND WRAPPED IN COIR MATTING TIE TO EXISTING GROUN 2" LIVE CUTTINGS TOP OF BANK 2" (BANKFULL) ���/ COIR MATTING WRAPPED AROUND SOIL LIFT //��j��j�yjj�� UPHILL i��' < ����A:�A��/�A��A�� 12" 6" ABOVE DOWNSTREAM RIFFLE ELEVATION TYPE 2FILTER FABRIC 12"17 //AAA/� 24" VAR IESv�A�//A TOE OF SLOPE NATIVE SOIL ELEV. 6" BELOW CHANNELBED 3.0' MIN. Typical Stakes CLASS B/1 WITH FINES BACKFILL Section View Rock Toe with Geolift 6. Not to Scale Bull Creek 3' WIDTH PER TYPICAL SECTIONS BACKFILL EROSION CONTROL MATTING 6" TOP OF BANK (BANKFULL) ELEV. V ABOVE �• ,///�/V//\ / //A//�/�/A �A �� DOWNSTREAM '��//��/\\/ DENSELY PACKED BRUSH, WOODY DEBRIS AND SOIL RIFFLE INVERT 17 VAA/ MW "/ BASE LOG TOE OF SLOPE 4"-6" DIAMETER \ VA �A SASE LOG 6-12" DIAMETER ELEV. 6" BELOW T MIN I-� NATIVE SOIL BACKFILL POOL DEPTH Section A -A' DENSELY PACK BRUSH, WOODY DEBRIS AND SOIL IN BETWEEN BASE LOGS P OF Z� NOTES: 1. OVEREXCAVATE T OUTSIDE OF TOP OF BANK (BANKFULL). 2. INSTALL BASE LOGS PARALLEL TO FLOW AT TOE OF SLOPE. .\O DIAMETER 6"42". 3. INSTALL BASE LOGS PERPENDICULAR TO FLOW AT INTERVALS ALONG BANK, RESTING ON TOP OF PARALLEL BASE LOGS. BASE LOGS SHALL BE 6"-12" DIAMETER. 4. INSTALLA DENSE LAYER OF BRUSH/WOODY DEBRIS, WHICH SHALL CONSIST OF SMALL BRANCHES AND ROOTS COLLECTED ON -SITE AND SOIL TO FILL ANY VOID SPACE. LIGHTLYCOMPACT BRUSH/WOODY DEBRIS LAYER. 5. BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL AND IS INSTALLED POINTING SLIGHTLY UPSTREAM. 6. INSTALL MATTING OVER BRUSH/WOODY DEBRIS. 7. INSTALL EARTH BACKFILL OVER BRUSH/WOODY LAYER ACCORDING TO TYPICAL SECTION DIMENSIONS. 8. SEED, MULCH AND INSTALL EROSION CONTROL MATTING AND BANK STABILIZATION PER PLANS. Plan View Brush Toe - Large Streams 6. Not to Scale Bull Cie k EROSION CONTROL MATTING BASE LOGS PERPENDICULAR TO FL —BASE LOGS PARALLEL TO FLOW BRUSH MATERIAL TO BE INSTALLED FLUSH WITH BANK °a�mM6 z m m w ourLLE LL T 4� -F+ w N N v E w From: Davis, Erin B To: Baker, Caroline D Subject: FW: IRT/ DMS/ Wildlands - Key Mill Mitigation Site Meeting Minutes (7-13-2021): Key Mill (DMS# 100025) SAW- 2017-01504; DWR#2017-0145 Date: Monday, November 1, 2021 12:52:28 PM Attachments: Key Mill 100025 Credit Release Meeting Minutes 7-13-2021.pdf Laserfiche Upload: Email & Attachment DWR#: 20171045 v.1 Doc Type: Mitigation Site Visit From: Wiesner, Paul Sent: Tuesday, July 20, 20214:13 PM To: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Kim Browning <Kimberly.D.Brown ing@usace.army.mil> Cc: skirk@wildlandseng.com; Aaron Earley <aearley@wildlandseng.com>; Shawn Wilkerson <swilkerson@wildlandseng.com>; Reid, Matthew <matthew.reid@ncdenr.gov>; Allen, Melonie <melonie.allen@ncdenr.gov> Subject: IRT/ DMS/ Wildlands - Key Mill Mitigation Site Meeting Minutes (7-13-2021): Key Mill (DMS# 100025) SAW-2017-01504; DWR#2017-0145 Casey, Erin, Kim, Travis, and Todd; Please find Wildlands meeting minutes and action items from the July 13, 2021 site visit attached. Let us know if you have any additions, questions, comments or concerns. Wildlands will put the final meeting minutes in the 2021 (MY2) report as an Appendix for documentation and the report will reflect the action items implemented. Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile paul.wiesner@ncdenr.gov Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.