Loading...
HomeMy WebLinkAbout20211579 Ver 1_Pre-Construction Notification (PCN) Form_20211102 DW R mvlsloa of Water Besources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver 4.1 Please note:fields marked with a red asterisk*below are required. You will not be able to submit the form until all mandatory questions are answered. Also,if at any point you wish to print a copy of the E-PCN,all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https:Hedoes.deq.nc.gov/WaterResources/0/edoc/624704/PCN%2OHelp/2OFile/202018-1-30.pdf A. Processing Information County(or Counties)where the project is located:` Hertford Is this a NCDMS Project* Yes No Click Yes,only if NCDMS is the applicant or co-applicant. Is this project a public transportation project?* • Yes No This is any publicly funded by municipal,state or federal funds road,rail,airport transportation project. Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: WBS#* 17BPA.R.98 (for NCDOT use only) 1 a.Type(s)of approval sought from the Corps:* Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* Yes • No 1 b.What type(s)of permit(s)do you wish to seek authorization?* Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps?* Yes • No Nationwide Permit(NWP)Number: 03-Maintenance NWP Numbers(for multiple NWPS): List all NW numbers you are applying for not on the drop down list. Id.Type(s)of approval sought from the DWR: check all that apply 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification Pre-Filing Meeting Information Before submitting this form please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step.The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R.Section 121.4(a)"At least 30 days prior to submitting a certification request,the project proponent shall request a pre-filing meeting with the certifying agency"and in accordance with 40 C.F.R.Section 121.5(b)(7),and(c)(5)all certification requests shall include documentation that a pre-Fling meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request.Click here to read more information on when this form is needed prior to application submission or here to view the form. Is this a courtesy copy notification?* Yes No ID# Version Pre-fling Meeting or Request Date* 10/8/2021 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach document Site Visit.pdf 100.32KB File type must be PDF le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?* Yes - No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so,attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No Acceptance Letter Attachment Click the upload button or drag and drop files here to attach document FILE TYPE MUST BE PDF 1 h.Is the project located in any of NC's twenty coastal counties? Yes No 11.Is the project located within a NC DCM Area of Environmental Concern(AEC)?* Yes No Unknown 1j.Is the project located in a designated trout watershed?* Yes - No Link to trout information:http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a.Who is the Primary Contact?* Paul Williams 1c.Primary Contact Phone:* 1 b.Primary Contact Email:* (xxx)xxx-xxxx pcwilliams2@ncdot.gov (252)482-1861 1d.Who is applying for the permit?* Owner Applicant(other than owner) (Check all that apply) 1e.Is there an Agent/Consultant for this project? Yes No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT ROW SR 1311 Boones Bridge Road 2b.Deed book and page no.: 2c.Contact Person: (for Corporations) Paul Williams 2d.Address* Street Address 113 Airport Dr. Address Line 2 City State/Province/Region Edenton NC Postal/Zip Code Country 27932 USA 2e.Telephone Number:* (xxx)xxx-xxxx (252)482-1861 2f.Fax Number: (252)482-8722 (xxx)xxx-xxxx 2g.Email Address:* pcwilliams2@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1a.Name of project:* Hertford Bridge 97 Replacement Project 1 b.Subdivision name: (if appropriate) 1 c.Nearest municipality/town: Como 2.Project Identification l^J 2b.Property size: 2a.Property Identification Number: (In acres) (tax PIN or parcel ID) 3.79 2c.Project Address Street Address Bridge 97 on Boones Bridge Road,0.2 mi.west of Whitley Road and Boone Bridge Road intersection Address Line 2 City State/Province/Region Como NC Postal/Zip Code Country 27818 USA 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees.Use between 4-6 digits(unless you are using a survey-grade GPS device)after the decimal place as appropriate,based on how the location was determined. (For example,most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 36.5237 -77.0751 ex:34,208504 -77.796371 3. Surface Waters 3a.Name of the nearest body of water to proposed project: UT to the Meherrin River 3b.Water Resources Classification of nearest receiving water: QNSW Surface Water Lookup 3c. What river basin(s)is your project located in?* Chowan 3d.Please provide the 12-digit HUC in which the project is located.* 030102040905 River Basin Lookup 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Project area consists of NCDOT Hertford County SR 1311 and Bridge#97.The general land use in the vicinity is rural residential,farmland,and forests. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past? Yes No Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0.75 4g.List the total estimated linear feet of all existing streams on the property: (intermittent and perennial) 729 4h.Explain the purpose of the proposed project: To replace the aging Bridge#97 that has received deficiency ratings,qualifying it for replacement.NCDOT wants to maintain SR 1311 as a safe and reliable travel route for the public. 41.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Replace an existing 2-span 34 ft.long X 25 ft.wide bridge with a new single span bridge structure measuring 50 ft.long X 30 ft.wide.Upon completion of the structure,NCDOT will have to rebuild the roadway approaches on either end of the bridge.This will involve some minor widening of the roadway bridge approaches and some along the roadway shoulders.The project will result in approx.0.01 acres of permanent fill in wetlands,approx.0.08 acres of temporary hand clearing in wetlands,approx.<0.01 acres of permanent surface water impacts, approx.<0.01 acres of temp.surface water impacts,approx.50 linear feet of permanent stream impacts,and approx.55 linear feet of temp.stream impacts. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: Example:SAW-2017-99999 SAW-2019-00783 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Cogdell/Gresham Agency/Consultant Company: Atkins Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR. February 16,2021 by the Corps 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 2.Wetland Impacts If there are wetland impacts proposed on the site,then complete this question for each wetland area impacted. "W."will be used in the table below to represent the word"wetland". 2a1 Reason*(?) 2b.Impact type*M 2c.Type of W. 2d.W.name* 2e.Forested* 2f.Type of Jurisdicition*2g•Impact area Roadway Fill and Toe P Riverine Swamp Forest WA Yes Corps 0.003 Protection (acres) Hand Clearing T Riverine Swamp Forest WA Yes Corps 0.026 F--� J (acres) Roadway Fill and Toe P E-- Riverine Swamp Forest WB Yes Corps 0.002 Protection (acres) [Hand Clearing T Riverine Swamp Forest WB Yes Corps 0.024 (acres) Roadway Fill and Toe P Riverine Swamp Forest WC Yes Corps 0.009 ProtectionJE�7] (acres) Hand Clearing T Riverine Swamp Forest WC Yes ]Corps 0.032 (acres) 2g.Total Temporary Wetland Impact 0.082 2g.Total Permanent Wetland Impact 0.014 2g.Total Wetland Impact 0.096 2i.Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts(including temporary impacts)proposed on the site,then complete this question for all stream sites impacted. "S."will be used in the table below to represent the word"stream". 3a.Reason for impact"(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name ��3e.Stream Type* 3f.Type of 3g.S.width" 3h.Impact (?) Jurisdiction* length" S1 Bank Stabilization Permanent Bank Stabilization SA Perennial Corps 20 50 Average(feet) Qinear feet) S2 Bank Stabilization Temporary Bank Stabilization J SA Perennial Corps 20 55 Average(feet) Qinear feeQ **All Perennial or Intermittent streams must be verified by DWR or delegated local government. 31.Total jurisdictional ditch impact in square feet: 0 31.Total permanent stream impacts: 50 31.Total temporary stream impacts: 55 31.Total stream and ditch impacts: 105 3j.Comments: 4. Open Water Impacts If there are proposed impacts to lakes,ponds,estuaries,tributaries,sounds,the Atlantic Ocean,or any other open water of the U.S.then individually list all open water impacts below. 4a1.Impact Reason 4b.Impact type*(?) rName of waterbody(1 4d.Activity type* 4e.Waterbody type"::]4f.Impact 7 area 3 Bank Stabilization P UT to Meherrin River Stabilization Tributary 0.01 (acres) 3 Bank Stabilization L UT to Meherrin River Stabilization Tributary 0.01 (acres) 4g.Total temporary open water Impacts: 0.01 4g.Total permanent open water impacts: 0.01 4g.Total open water impacts: 0.02 4h.Comments: Permanent Impact=0.003 acre Temp.Impact=0.008 E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* NCDOT minimized the roadway width by narrowing the shoulders and bridge width to the minimal amount allowable with the design speed and roadway geometry.There are no deck drains located on the bridge.The existing bridge demolition will follow NCDOT BMP's for bridge demolition work.Erosion and Sediment control plans have been designed and will be followed to retain any runoff from construction activities.An offsite detour is being utilized to eliminate any additional wetland and surface water impacts. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Utilizing BMPs for bridge demolition will capture all components of the old structure.Erosion and Control measures will be placed along the entire project area to reduce soil runoff.A turbidity curtain can be utilized along the banks to capture any siltation that may occur during project construction.The utilization of precast concrete materials,reduces the potential for uncured concrete entering the adjacent waters. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Impacts are below thresholds for mitigation. NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) ***Recent changes to the stormwater rules have required updates to this section.'** 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No For a list of options to meet the diffuse flow requirements,click here. If no,explain why: NC Riparian Buffer Rules do not apply to the Chowan River Basin. 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No Comments: NCDOT will follow best management practices for soil and erosion control in compliance with N.C.Sediment and Pollution Control Act and NCDOT NPDES permit.Erosion control devices will be installed and maintained during the project.A grated drop inlet on the SW side will route storm water to vegetated buffers prior to entering surface waters.No deck drains will be located over surface waters. G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?" Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* Yes No Comments:* Activity and impacts covered by Minimum Criteria Checklist or Categorical Exclusion. 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?" Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project(based on past and reasonably anticipated future impacts)result in additional development,which could impact nearby downstream water quality?* Yes No 3b.If you answered"no,"provide a short narrative description. Project replaces an existing bridge with a bridge. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8?* Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* NC Natural Heritage Data Explorer Website 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* National Marine Fisheries Database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map(does not include archaeological data: http_//gis.ncdcr.gov/hpoweb/ 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status(e.g.,National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT Cultural Resources Unit.Reports attached. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b.If yes,explain how project meets FEMA requirements: FEMA Approved through NCDOT Hydraulics Units 8c.What source(s)did you use to make the floodplain determination?* NC DOT Hydraulics Unit,Zone AE Miscellaneous Comments CAMA Major Permit will be not be required for this project.(Email 5/1/2018) A moratorium on in-water construction will be not be required.(Email 4/1/2018) Tribal Notifications submitted 9/27/2021 and 9/29/2021.No responses to date. Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 19-0 1-00 1 8NoSurvey.pdf 3.1 MB NCWRC Email.pdf 291.53KB 450097_Permit Drawings_20211012.pdf 1.71 MB Hertford Bridge 97-Tribal Coordination Letter-Meherrin.pdf 124.07KB Hertford Bridge 97-Tribal Coordination Letter-Tuscarora.pdf 124.07KB Hertford Bridge 97-Tribal Coordination Letter-Catawba.pdf 124.07KB SAW-2019-00783 NCDOT Hertford Bridge 97_PJD.pdf 9.83MB SAW-2019-00783 NCDOT Hertford Bridge 97.pdf 251.44KB PA 19-01-0018 No Archaeological Survey Required Str No 97 on SR 1311 Hertford.pdf 1.31 MB Topo.pdf 1.2MB Soil_Map.pdf 661.89KB File must be PDF or KMZ Signature By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name:* Paul Collins Williams,Jr. Signature* CT. Date 10/22/2021