HomeMy WebLinkAbout20131141 Ver 1_401 Application_20131013WITHERS & RAVENEL
ENGINEERS 1 PLANNERS I SURVEYORS
1410 COMMONWEALTH DRIVE, SUITE 1o1
WILMINGTON, NORTH CAROLINA, 28403
(910) 256 -9277
FAX (910) 256 -2584
T0: NC Division of Water Resources
512 N. Salisbury Street; 9" Floor
Raleigh, NC 276o4
WE ARE SENDING YOU
❑ Shop Drawings
❑ Copy of Letter
LETTE' OF TRANSMITTAL
DATE 10/23/13
loaNO. 021 008 .00
ATTENTION Ms. Karen Higgins
PHONED
gig-8o7-6363
RE: Villa a at the Park Sewer — NWP 12 PCN Submittal
10/23/13
02130084.00
NWP 12 PCN Submittal
1
-10/23/13
021 oo8 .00
® Attached ❑ Under separate cover via
❑ Prints ❑ Plans ❑ Samples
❑ Change order ❑ Diskette ❑
the following items:
❑ Specifications
COPIES
DATE
NO.
DESCRIPTION
10/23/13
02130084.00
NWP 12 PCN Submittal
1
-10/23/13
021 oo8 .00
Check for $24o Application Fee
1
10/23/13
021 0o8 .00
CD of PCN
THESE ARE TRANSMITTED as checked below:
® For approval ❑ Approved as submitted
❑ For your use ❑ Approved as noted
❑ As requested ❑ Returned for corrections
❑ For review and comment ❑
❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US
❑ Resubmit
❑ Submit
❑ Return
copies for approval
copies for distribution
corrected prints
COPY TO: File
SIGNED: Troy Beasley
Ifenc%sures aie not as noted, k/nd/y notify us at once.
0
20131141
WITHERS &-RAVENEL
October 23, 2013
US Army Corps of Engineers
Regulatory Feld Office
Attn: Mr. James Lastinger
3331 Heritage Trade Drive
Suite 105
Wake Forest, NC 27587
ENGINEERS PLANNERS SURVEYORS
NC- Division of Water Resources
Attn: Ms. Karen Higgins
1650 Mail Service Center
Raleigh, North Carolina 27699
Re: Village at the Park Sewer — NWP 12 PCN Submittal
W &R Project #02130084.00
Dear Mr. Lastinger and Ms. Higgins,
IL��LSU V L5
I
OCT 2 4 2013
D NR . A n,
On behalf of Pulte Homes, we are requesting authorization from the USACE to use NWP 12 for 30 if of
temporary impacts to streams for the construction of a sewer line crossing. Please note that the
project qualifies for a non - notifying NWP 12, so this PCN is being provided to the Corps as a
courtesy. Since the entire 30' utility easement will be mowed /maintained, the crossing is classified
as "Allowable" and therefore requires written authorization from NCDWR. Therefore, we are
requesting a 401 WQC for the proposed impacts.
The project site is located approximately 600 if southwest of the western terminus of Kit Creek Road
at the Alston Ridge Elementary School in Cary, Wake County (Latitude: 35.8597 °N; Longitude: -
78.9oo8 °W). The project is located in the Cape Fear River basin and onsite waters drain to Kitt
Creek. The Water Quality Classification for Kitt Creek is WS -IV; NSW and the Stream Index Number
is:16- 41- 1- 17- 2- (0.7). The cataloging unit for the site is 03030002.
Proposed Project
The proposed project consists of a 1236 if sewer line crossing (8" DIP), which will connect the sewer
within the Village at the Park subdivision to an existing sewer line to the east. The project Please
note that there are no impacts associated with the construction of the Village at the Park
subdivision, and therefore, the proposed project consists only of the stream crossing necessary to
install the sewer connection.
Proiect History
Mr. Dave Shaeffer with the Corps of Engineers field verified the wetland delineation on July 9', 2013
(AID SAW - 2013- 0163o). The wetland survey is being submitted as an Appendix to this application
for verification and signature to facilitate issuance of the final JD.
1410 Commonwealth Drive I Suite 1011 Wilmington, NC 28403 1 tel: 910.256.9277 1 fax: 910.256.2584
www.withersravenel.com I License No. C -0832
WITHERS &RAVENEL
ENGINEERS I PLANNERS SURVEYORS
Proposed Impacts
The proposed impacts consist of 30 if of temporary stream impacts necessary to install the 8" DIP
line to connect the Village at the Park sewer to the existing sewer line to the east.
Avoidance and Minimization
Prior to site plan design, the applicant requested that a detailed wetland delineation be conducted
so that impacts to wetlands and "waters" could be minimized.
Impacts have been minimized to only those stream impacts necessary to construct the sewer
connection. There are no impacts proposed for construction of the Village at the Park subdivision.
Mitigation
Because the proposed stream impacts are temporary, no mitigation is proposed.
The current request is for 30 if of temporary stream impacts (see the attached maps and PCN for
details).
Please feel free to call if you have questions or require additional information.
Sincerely,�
Troy Beasley
Environmental Scientist
Attachments:
• PCN Form
• Agent Authorization Forms
• USGS Quadrangle Map
• Wake County Soil Survey
• Impact Exhibits
WITHERS & RAVENEL Page 2 of 2
ENGINEERS 1 PLANNERS 1 SURVEVORS
`O�ot W 9
AT§OG
>_ y
O <
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre - Construction Notification CN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps
®Section 404 Permit El Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number. NWP 12 or General Permit (GP) number.
1c. Has the NWP or GP number been verged by the Corps? --Fz
Yes
❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
❑ Yes ® No
For the record only for Corps Permit:
® Yes ❑ No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
❑ Yes
® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes
® No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2. Project Information
2a. Name of project:
Village at the Park Sewer
2b. County:
Wake
2c. Nearest municipality / town:
Cary
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no:
3. Owner Information
3a. Name(s) on Recorded Deed:
HAB Properties, LLC
3b. Deed Book and Page No.
Book: 14406; Page: 0481
3c. Responsible Party (for LLC if
applicable):
Roy Mashburn
3d. Street address:
3331 Sherwee Drive
3e. City, state, zip:
Raleigh, NC 27603
3f. Telephone no.:
919 -600 -1097
3g. Fax no.:
3h. Email address:
rovmashburnCc_aerimeterreatty .net
Page 1 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent ® Other, specify: Pulte Homes - Purchaser
4b. Name:
John Dempsey
4c. Business name
(if applicable):
Pulte Homes
4d. Street address:
1225 Crescent Green Drive; Suite 250
4e. City, state, zip:
Cary, NC 27518
4f. Telephone no.:
919 - 369 -4007
4g. Fax no.:
4h. Email address:
John. Dempsey@PuRgorouo.com
S. Agent/Consultant Information (if applicable)
5a. Name:
Troy Beasley
5b. Business name
(if applicable):
Withers and Ravenel
5c. Street address:
1410 Commonwealth Drive, Suite 101
5d. City, state, zip:
Wilmington, NC 28403
5e. Telephone no.:
910 - 256 -9277
5f. Fax no.:
910 - 256 -2584
5g. Email address:
tbeasley @withersravenel.com
Page 2 of 10
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
0726984369
1b. Site coordinates (in decimal degrees):
Latitude: 35.8597 °N; Longitude: - 78.9008 °W
(DD.DDDDDD) (- DD.DDDDDD)
1c. Property size:
N/A — Linear Project
(The Village at the Park subdivision is ±38 acres)
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project:
Kit Creek (Stream Index 16- 41- 1- 17- 2 -(0.7)
2b. Water Quality Classification of nearest receiving water.
WS -IV;NSW
2c. River basin:
Cape Fear (HUC 03030002)
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The project site currently consists of undeveloped woodlands. The general land use in the vicinity of the project consists
of a mixture of residential, commercial and institutional land use.
3b. List the total estimated acreage of all existing wetlands on the property:
N/A — there are no wetlands within the project area.
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
30 If of stream within the proposed sewer alignment.
±631 If of stream within the Village at the Park boundary.
3d. Explain the purpose of the proposed project:
The purpose of the proposed project is to construct a gravity sewer line which will service the Village at the Park
residential subdivision. Please note that there are no impacts associated with construction of the Village at the Park
subdivision.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project consists of the construction a ±236 If sewer crossing, consisting of 8° DIP line, which will connect the sewer
within the Village at the Park subdivision to an existing sewer line located east of the project site. The sewer line will be
installed by trench and backfill. Standard commercial construction equipment will be used to install the sewer line.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
® Yes ❑ No ❑ Unknown
Comments: The Corps of Engineers field verged the wetland
delineation on July 8"', 2013. The wetland survey is being
submitted with the PCN for issuance of the final JD.
4b. If the Corps made the jurisdictional determination, what type
®Preliminary El Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas?
Agency /Consultant Company: Withers & Ravenel
Name (if known): Troy Beasley
Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
The Corps of Engineers field verified the wetland delineation on July 8h, 2013. The wetland survey is being submitted
with the PCN for issuance of the final JD (AID SAW- 2013 -01630).
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ® No ❑ Unknown
5b. If yes, explain in detail according to "help file" instructions.
S. Future Project Plans
6a. Is this a phased project?
❑ Yes ® No
6b. If yes, explain.
Page 4 of 10
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ® Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Tem ora
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary m
(INT)?
other)
(feet)
feet)
Impact #4
El ® T
Sewer Crossing
UT to Kit Creek
❑ PER
® INT
® Corps
® DWQ
5'
30 If
3h. Total stream and tributary impacts
30 If
3i. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
4b.
4c.
4d.
4e.
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary
01 ❑P ❑T
02 ❑ PEI T
03 ❑ PEI T
04 ❑P ❑T
4E Total open water impacts
4g. Comments:
Page 5 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
5b.
5c.
5d.
5e.
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
S. Buffer Impacts (for DWO)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar - Pamlico ® Other. Jordan
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b.
6c.
6d.
6e.
6f.
6g.
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary
impact
required?
131 ❑P [IT
El Yes
❑ No
B2 ❑P ❑T
El Yes
❑ No
B3 ❑P [IT
❑Yes
❑ No
6h. Total buffer impacts
6i. Comments: Buffer impacts will be permitted through the Town of Cary.
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The sewer line has been designed to cross the stream at a perpendicular angle. Upon completion of construction of the sewer
line, the stream bed and banks will be restored to pre-construction contours. Please note that there are no impacts proposed
for construction of the Village at the Park subdivision which the sewer line will service.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Silt fencing will be installed around all disturbed areas to prevent sediment from escaping into the adjacent stream.
Page 6 of 10
PCN Form — Version 1.3 December 10, 2008 Version
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ® No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
_T
Type
Quantity
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non - riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a pemtittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ❑ No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
® Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: The project consists of construction of a sewer line crossing which does
not require diffuse flow. The diffuse flow associated with the Village at the Park
❑ Yes ® No
subdivision will be reviewed as part of the Stormwater Management Plan which is
being reviewed by the Town of Cary.
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
N/A — sewer line
2b. Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The project consists of construction of a
sewer line crossing. The stormwater management plan associated with the Village at the Park subdivision is being
reviewed by the Town of Cary.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
® Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
Town of Cary
® Phase II
3b. Which of the following locally - implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other.
3c. Has the approved Stormwater Management Plan with proof of approval been JO
Yes ❑ No
attached?
4. DWQ Stormwater Program Review
❑ Coastal counties
4a. Which of the following state - implemented stormwater management programs apply
❑ HQW
❑ ORW
(check all that apply):
❑ Session Law 2006 -246
❑ Other.
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
S. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? TO
Yes ❑ No
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la. Does the project involve an expenditure of public (federal/state /locaQ funds or the
❑ Yes ® No
use of public (federal/state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after - the -fact permit application?
❑ Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
The proposed sewer line will service only the Village at the Park subdivision, which is located within a heavily developed
area of Cary and is not anticipated to be a catalyst for future development.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Town of Cary
Page 9 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
El Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
W &R requested GIS data from the NC Natural Heritage Program for known occurrences of federally listed species within
2.0 miles of the proposed project. The GIS data did not indicate any known occurrences of federally listed species within
2.0 miles. Furthermore, W &R conducted a threatened and endangered species survey of the project site and did not
identify any occurrences of federally listed species or critical habitat. Therefore, the project will have "No Effect" on
federally listed species.
S. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
There are no waters in Wake County classified as EFH.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
W &R reviewed the NC State Historic Preservation Office's online database, located at: http:ais.ncdcr.00v /hpoweb /, to
determine if there were any known historic or cultural resources within or in the vicinity of the proposed project. The
database review did not identify any known resources within or adjacent to the proposed project. Furthermore, there are
no structures located within the proposed project area.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain?
❑ Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? www.ncfloodmar)s.com
Troy Beasley — Withers & Ravenel
Authorized Agent
10/23/13
Applicant/Agent's Printed Name
Applicant/Agent's Signature
Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 10 of 10
PCN Form — Version 1.3 December 10, 2008 Version
AGENT AUTHORIZATION FORMS
WITHERS &-RAVENEL
ENGINEERS I PLANNERS I SURVEYORS
AUTHORITY FOR APPOINTMENT OF AGENT
The undersigned contract purchaser Pulte Homes (Client) does hereby appoint Troy Beasley /
Withers & Ravenel. Inc. as his, her, or it's agent for the purpose of petitioning the appropriate
local, state and federal environmental regulatory agencies (US Army Corps of Engineers, NC
Division of Water Quality, NC Division of Coastal Management, local municipalities, etc.) for a)
review and approval of the jurisdictional boundaries of onsite jurisdictional areas (wetlands,
streams, riparian buffers, etc.) and/or; b) preparation and submittal of appropriate environmental
permit applications/requests for the Village at the Park Sewer.
The Client does hereby authorize that said agent has the authority to do the following acts on
behalf of the owner:
(1) To submit appropriate requests/applications and the required supplemental
materials;
(2) To attend meetings to give representation on behalf of the Client.
(3) To authorize access to subject property for the purpose of environmental
review by appropriate regulatory agencies.
This authorization shall continue in effect until completion of the contracted task or termination by
the Client.
Date:
Agent's Name, Address & Telephone: Signature of Client:
Troy Beasley / Withers & Ravenel. Inc. .�c�+.�� $2.'%# !9
me - Print) (Title)
1410 Commonwealth Drive, Suite 101
Wilmington. NC 28403 Signature)
Tel. (910) 256 -9277 rZZV,dde %mff 6- avo
Mailing Address
Cda't Abc. o?;�s'Zs
City State Zip
Phone:
Email: .�.�.���twiOSts�r®�� (ya,P -Cain
115 MacKenan Drive I Cary, NC 27511 tel.: 919.469.3340 1 fax: 919.467-60081 www.withersravenel.com I License No. C-0832
1410 Commonwealth Drive I Suite 1011 Wilmington, NC 28403 ( tel: 910.256.9277 1 fax: 910.256.2584
7011 Albert Pick Road I Suite G I Greensboro, NC 274091 tel: 336.605.3009 1 fax: 919.467.6008
WITHERS (k RAVENEL
ENGINEERS PLANNERS I SURVEYORS
AUTHORITY FOR APPOINTMENT OF AGENT
The undersigned contract purchaser HAB Properties, LLC (Client) does hereby appoint ILo_y
Beasley / Withers & Ravenel. Inc. as his, her, or it's agent for the purpose of petitioning the
appropriate local, state and federal environmental regulatory agencies (US Army Corps of
Engineers, NC Division of Water Quality, NC Division of Coastal Management, etc.) for a) review
and approval of the junsdictional boundaries of onsde jurisdictional areas (wetlands, surface
waters, riparian buffers, etc ) and/or, b) preparation and submittal of appropriate environmental
permit applications/requests for the Village at the Park project
The Client does hereby authorize that said agent has the authority to do the following acts on
behalf of the owner.
(1) To submit appropriate requests/applications and the required supplemental
materials,
(2) To attend meetings to give representation on behalf of the Client
(3) To authorize access to subject property for the purpose of environmental
review by appropriate regulatory agencies
This authorization shall continue in effect until completion of the contracted task or termination by
the Client.
Agent's Name, Address & Telephone
Troy Beasley / Withers & Ravenel. Inc
1410 Commonwealth Drive, Suite 101
Wilmington, NC 28403
Tel. (910) 256 -9277
Date l/ -? D -/Z
Signature of Client
!° Ik' yz%s /—Z-
(Name - Print) (Title)
(Signature /%'/f/
-333�a k,)Ze
Marling Address �t
City State Tip
Phone
Email
111 MacKenan Drive I Cary, NC 27511 j tel.. 919.469.3340 t fax: 919.467.60081 www.withersravenel.com I License No. C-0832
1410 Commonwealth Drive I Suite 1011 Wilmington, NC 284031 tel. 910.256.9277: fax: 910.256.2584
7011 Albert Pick Road I Suite G j Greensboro, NC 27409 1 tel: 336.605.3009 j fax: 919.467.6008
USGS QUAD MAP
WAKE CO. SOIL SURVEY
IMPACT EXHIBITS
m
I I
I
I I I I
I I II I I j
I I
I I I 1
I I I I
i 1
I I I I
1 I I 1 I
/ / /
/ T/y
L
/I
1
1
I
/ I
BUFFER IMPACT SUMMARY
IMPACT SUMMARY
IMPACT #
PERMANENT PERMANENT
ZONE 1- IMPACT ZONE 2 -IMPACT
#1 (SF) #2 (SF)
PERMANENT
CARY UTB -
IMPACT #3 (SF)
1,2,3
1,188 1,842
3,224
TOTALS
1,188 1 1,842
3,224
TOTAL BUFFER IMPACT 11
6,254
1
I
1 \ I /p ✓Q� / / / 'l j /� / / /I/ I I �I I I I I II
I I� / ry l•1 / f I I I I I I I I
/''�� // I -'N l � y1•' f I 1 i I I I I j 1 I I _�
�L //
��/
I I I I
ti�
Al
it
IT I
30' TOC UTILITY
EASEMENT/ S�TREAM IMPACT �I
1 I I I
PROP. N ml
MH-21 11EX. MH
` I
/ // // \/ /��•.� I 111 I i I I I I I I 7 y 1 I
++ �+
r +� ++ �t ++ ++
/ + + +/
/+ + + +
�( + +/
/ ++ +/+ + / I I I I I II I I I/ I I I I 1
+ l+ + +/ PRQ I t o I I I fI// I
P SANII I I o f l I I o I ( j rn I I
�ySRl� ✓ I I I I I N I I I
*I+ +
+I + + I I I
#3- CARYUTB 1 +� +I+
/IMPACT= 1,722 SF ( t, ! 1 1 I I I + I * I *
� 1 `I + I PROP. DOG
I HOUSE MH -29
#2- ZONE 2BUFFER /// J'LI
/I � / J• I 1 0 l I �I I I —
I I I IMPACT = 941 SF
I I/ I I I 11 I #3 - CARY UTB I I 1
IMPACT =1,502 SF _
/ I I
#1 -ZONE 1 BUFFER
I l 1 1 11 IMPACT = 587 SF y. �' i 1
#2 -ZONE 2 BUFFER
IMPACT =901 SF I I I \
#1- ZONE 1 BUFFER r� l I I / I \
IMPACT = 601 SF
Revistan
-
°°�w VILLAGE AT THE PARK
aysn�
SiRFAM
IMPACT SUMMARY
IMVACfi
TEMPORARY MOM • IMPACT f4(IF)
4
30.0
TOTALS
3Q0
were,
BUFFER & STREAM
IMPACT MAP
PROPOSED SANITARY SEWER PROFILE
MH -21 TO DOG HOUSE MH
J• =sa
M GRAPHIC SCALE
�- s ioo o so loo
WITHERS & RAVENEL
ENGINEERS 1 PLANNERS 1 SURVNVOli 2
1.S MC14Nn D.M CF.H•... C•.•InilfSl. Y19.9Yf])tl -rr viM.••. -Wcm. lfaue N•.CCSS3
Mimi
■1
;1
■I
■
■
■
■
■
■I
■
■
■
■
■
■
■
■
■
■
■I
■
■■
■mil
■111
■
■
■
■
■
■�
■
■
■
■
■
■
■
■
■
■
■I
■
■
■/■
X11
\�I
■
■
■
■
■
■�.��■.
■
■
■
■Ir..l
■
■■
■
■I
��
1
■
■
■
■
■■
■
■
■
■■
A■
it �
■■
■
■
■
■■
■■
■ ■ ■■ ■tom ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■I
-
BUFFER & STREAM
IMPACT MAP
PROPOSED SANITARY SEWER PROFILE
MH -21 TO DOG HOUSE MH
J• =sa
M GRAPHIC SCALE
�- s ioo o so loo
WITHERS & RAVENEL
ENGINEERS 1 PLANNERS 1 SURVNVOli 2
1.S MC14Nn D.M CF.H•... C•.•InilfSl. Y19.9Yf])tl -rr viM.••. -Wcm. lfaue N•.CCSS3