Loading...
HomeMy WebLinkAbout20181033 Ver 1_Mitigation Evaluation_20210629Mitigation Project Name Owen Farms USACE Action ID DMS ID 100064 DWR Permit River Basin French Broad Date Project Instituted Cataloging Unit 06010105 Date Prepared County Transylvania Stream/ Wet. Service Area Signature of Official Approving Credit Release 2018-01165 2018-1033 4/25/2018 6/1/2021 French Broad 06010105 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Cold Stream Credits Project Credits Scheduled o Releases 7o Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,513.168 1,513.168 0.000 1,513.168 2021 6/1/2021 3 - Year 1 Monitoring 10.00% 504.389 2022 4 - Year 2 Monitoring 10.00% 504.389 2023 5 - Year 3 Monitoring 10.00% 504.389 2024 6 - Year 4 Monitoring 5.00% 252.195 2025 7 - Year 5 Monitoring 10.00% 504.389 2026 8 - Year 6 Monitoring 5.00% 252.195 2027 9 - Year 7 Monitoring 10.00% 504.389 2028 Stream Bankfull Standard 10.00% 504.390 2025 Totals 1,513.168 Total Gross Credits 5,043.893 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,513.168 Total Percentage Released 30.00% Remaining Unreleased Credits 3,530.725 Credit Release Milestone Riparian Credits Project Credits Scheduled o Releases 7o Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 0.530 0.530 0.000 0.530 2021 6/1/2021 3 - Year 1 Monitoring 10.00% 0.177 2022 4 - Year 2 Monitoring 15.00% 0.265 2023 5 - Year 3 Monitoring 15.00% 0.265 2024 6 - Year 4 Monitoring 5.00% 0.088 2025 7 - Year 5 Monitoring 15.00% 0.265 2026 8 - Year 6 Monitoring 5.00% 0.088 2027 9 - Year 7 Monitoring 10.00% 0.177 2028 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 0.530 Page 1 of 2 Total Gross Credits 1.767 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 0.530 Mitigation Project Name Owen Farms DMS ID 100064 River Basin French Broad Cataloging Unit 06010105 County Transylvania Notes Contingencies (if any) Project Quantities USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/ Wet. Service Area Total Percentage Released 29.99% Remaining Unreleased Credits 1.237 Mitigation Type Restoration Type Physical Quantity Cold Stream Restoration 3,180.000 Cold Stream Enhancement I 125.000 Cold Stream Enhancement II 5,047.000 Cold Stream Preservation 423.000 Riparian Restoration 1.320 Riparian Enhancement 1.540 2018-01165 2018-1033 4/25/2018 6/1/2021 French Broad 06010105 Debits Cold Stream Restoration Credits Cold Stream Restoration Equivalent Credits Riparian Restoration Credits Riparian Restoration Equivalent Credits Beginning Balance (mitigation credits) 5,001.593 42.300 0.997 0.770 Released Credits 1,500.478 12.690 0.299 0.231 Unrealized Credits 0.000 0.000 0.000 0.000 Converted Credits 0.000 0.000 0.000 0.000 Owning Program Reg. Id TIP # Project Name USACE DWR DCM Remaining Balance (Released credits) 1,500.478 12.690 0.299 0.231 Remaining Balance (Unreleased credits) 3,501.115 29.610 0.698 0.539 Total Remaining Balance (Released and Unreleased credits) 5,001.593 42.300 0.997 0.770 Page 2 of 2 From: Davis. Erin B To: Baker, Caroline D Subject: FW: [External] Notice of Initial Credit Release/ NCDMS Owen Farms/ SAW-2018-01165/ Transylvania County Date: Monday, November 1, 2021 12:21:03 PM Attachments: Owen Farms 100064 FB 05 STR RW Initial Release 2021.Ddf Laserfiche Upload: Email & Attachment DWR#: 20181033 v.1 Doc Type: Mitigation Evaluation From: Browning, Kimberly D CIV USARMY CESAW (USA) [mailto: Kimberly. D.Browning@usace.army.mil] Sent: Tuesday, June 29, 20214:30 PM To: vickie.miller@hdrinc.com; Wiesner, Paul <paul.wiesner@ncdenr.gov> Cc: Harmon, Beth <beth.harmon@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>; Youngman, Holland J <hollandyouungman@fws.gov>; Hamstead, Byron A <byron_hamstead@fws.gov>; Furr, Benjamin <bfurr@lmgroup.net>; Allen, Melonie <melonie.allen@ncdenr.gov>; Jones, M Scott (Scott) CIV USARMY CESAW (USA) <Scott.Jones@usace.army.mil>; Smith, Ronnie D CIV USARMY CESAW (USA) <Ronnie.D.Smith@usace.army.mil>; McLendon, C S CIV USARMY CESAW (USA) <Scott.C.McLendon@usace.army.mil>; Baumgartner, Tim <tim.baumgartner@ncdenr.gov>; Brown, David W CIV USARMY CESAW (USA) <David.W.Brown@usace.army.mil> Subject: [External] Notice of Initial Credit Release/ NCDMS Owen Farms/ SAW-2018-01165/ Transylvania County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon, The 15-Day Record Drawing review for the Owen Farms Mitigation Site (SAW-2018-01165) ended June 25, 2021. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are incorporated in the attached Memo. Please address IRT concerns in a response to comments, addressed to USACE. There were no objections to issuing the initial credit release. Please find attached the current signed ledger. The IRT would like to visit this site next year after monitoring for year 1 is complete. Erin Davis. DWR: 1. DWR is ok with the planted vegetation species/quantity substitutions. Were there any species changes in the previously approved site seed mixes? 2. DWR appreciates the inclusion of aerial photos. These images are helpful for agency review. 3. During the IRT construction site walk following significant a storm event in November 2020, we observed areas of floodplain scour and major movement of stone from original bed/bank placement. Was there any adjustment of floodplain width and/or slope from the original design? And was there any adjustment is rock size for riffles and/or bank toe structures? Casey Haywood, USACE: No issues with the changes to the species type and composition for the planted vegetation. Appreciate the effort in identifying the planting zones The report mentions Bog complex communities being planted with high percentages of shrub species; I understand that these are not expected to reach the height requirement/vigor standard, but I was wondering how success and/or survival is being monitored in these areas? I did not see UT1, UT2, or UT3 in the Table 6 Project Attribute table. Why were these left out of the table? 4. Given the amount of damage seen during the November site visit due to major storms, I also think it would be beneficial to schedule a site visit for next year. Thanks, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers