Loading...
HomeMy WebLinkAbout20181033 Ver 1_Mitigation Information_20210610From: Davis. Erin B To: Baker, Caroline D Subject: FW: [External] Notice of NCDMS As -Built Review / Owen Farms / SAW-2018-01165 / Transylvania Co. Date: Monday, November 1, 2021 12:20:05 PM Attachments: imaae001.onna Laserfiche Upload: Email DWR#: 20181033 v.1 Doc Type: Mitigation Information From: Haywood, Casey M CIV (USA) [mailto:Casey.M.Haywood@usace.army.mil] Sent: Thursday, June 10, 2021 10:35 AM To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Brown ing@usace.army.miI>; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Youngman, Holland J <hollandyouungman@fws.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Haywood, Casey M CIV (USA)<Casey.M.Haywood@usace.army.mil> Cc: Miller, Vickie M <Vickie.Miller@hdrinc.com>; Digeronimo, Alex <adigeronimo@lmgroup.net>; Furr, Benjamin <bfurr@lmgroup.net>; Kevin Williams <kevinwilliams@lmgroup.net>; Allen, Melonie <melonie.allen@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Stanfill, Jim <jim.stanfill@ncdenr.gov>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Jones, M Scott (Scott) CIV USARMY CESAW (USA) <Scott.Jones@usace.army.mil> Subject: [External] Notice of NCDMS As -Built Review / Owen Farms / SAW-2018-01165 / Transylvania Co. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: June 10, 2021 15-Day Comment Deadline: June 25, 2021 45-Day Credit Release Approval Deadline: July 25, 2021 Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO): Project Information: Owen Farms Stream and Wetland Mitigation Site (DMS#100064) SAW-2018-01165 RFP: 16-007334— Issued 09/08/2017 Institution Date: 4/25/2018 — Full Delivery French Broad River Basin Cataloging Unit 06010105 Transylvania County, North Carolina Proposed Mitigation Plan Credits: 5,043.893 SMUs (Cold) 1.767 WMUs (Riparian) As -Built MYO Project Credits: 5,043.893 SMUs (Cold) 1.767 WMUs (Riparian) Mitigation Plan Lengths/Acreages: 8,775 linear ft. 2.86 ac. As-Built-MYO Lengths/ Acreages: 8,775 linear ft. 2.716 ac. Please note: The Owen Farms project was built to design plans and guidelines. The as -built stream length was the same as proposed in the mitigation plan; however, the as -built wetland size was 0.144 acres smaller than proposed. The reduction in Wetland Group 1 is a result of a mistake at the Mitigation Plan stage that did not account for the UT 2 and UT 3 top of banks through the wetland areas, and a miscalculation of enhancement area along the left bank near STA 22+00 of WFFBR. Project credits have been kept consistent with the IRT approved mitigation plan. 2021 is Monitoring Year 1 for this project. FD Provider: HDR; Contact: Vickie Miller, AICP, PWS; Vickie. MillerCcDhdrinc.com; Direct: 919-232- 6637, Mobile: 919-559-2632 NCDEQ- DMS PM: Paul Wiesner, paul.wiesner(@ncdenr.gov 828-273-1673 FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page: https://ncconnect.sharepoint.com/sites/IRT-DMS Owen Farms_100064_MYO_2021 P°FOwen Farms _100064_MYO_2021.pdf Owen Farms_100064_AB_2021 P 00wen Farms_100064 AB 2021.pdf RIBITS: https://ribits.ops.usace.army.mil/ords/f? p=107:278:16349928184661:: NO: RP, 278: P278_BANK_I D:5287 Please reach out if you have questions. Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers BUILDING STRONG °