Loading...
HomeMy WebLinkAbout20181033 Ver 1_Mitigation Information_20210609Mitigation Project Name Owen Farms USACE Action ID DMS ID 100064 DWR Permit River Basin French Broad Date Project Instituted Cataloging Unit 06010105 Date Prepared County Transylvania Stream/ Wet. Service Area Signature of Official Approving Credit Release 2018-01165 2018-1033 4/25/2018 6/1/2021 French Broad 06010105 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Cold Stream Credits Project Credits Scheduled o Releases 7o Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,513.168 1,513.168 0.000 1,513.168 2021 6/1/2021 3 - Year 1 Monitoring 10.00% 504.389 2022 4 - Year 2 Monitoring 10.00% 504.389 2023 5 - Year 3 Monitoring 10.00% 504.389 2024 6 - Year 4 Monitoring 5.00% 252.195 2025 7 - Year 5 Monitoring 10.00% 504.389 2026 8 - Year 6 Monitoring 5.00% 252.195 2027 9 - Year 7 Monitoring 10.00% 504.389 2028 Stream Bankfull Standard 10.00% 504.390 2025 Totals 1,513.168 Total Gross Credits 5,043.893 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,513.168 Total Percentage Released 30.00% Remaining Unreleased Credits 3,530.725 Credit Release Milestone Riparian Credits Project Credits Scheduled o Releases 7o Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 0.530 0.530 0.000 0.530 2021 6/1/2021 3 - Year 1 Monitoring 10.00% 0.177 2022 4 - Year 2 Monitoring 15.00% 0.265 2023 5 - Year 3 Monitoring 15.00% 0.265 2024 6 - Year 4 Monitoring 5.00% 0.088 2025 7 - Year 5 Monitoring 15.00% 0.265 2026 8 - Year 6 Monitoring 5.00% 0.088 2027 9 - Year 7 Monitoring 10.00% 0.177 2028 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 0.530 Page 1 of 2 Total Gross Credits 1.767 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 0.530 Mitigation Project Name Owen Farms DMS ID 100064 River Basin French Broad Cataloging Unit 06010105 County Transylvania Notes Contingencies (if any) Project Quantities USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/ Wet. Service Area Total Percentage Released 29.99% Remaining Unreleased Credits 1.237 Mitigation Type Restoration Type Physical Quantity Cold Stream Restoration 3,180.000 Cold Stream Enhancement I 125.000 Cold Stream Enhancement II 5,047.000 Cold Stream Preservation 423.000 Riparian Restoration 1.320 Riparian Enhancement 1.540 2018-01165 2018-1033 4/25/2018 6/1/2021 French Broad 06010105 Debits Cold Stream Restoration Credits Cold Stream Restoration Equivalent Credits Riparian Restoration Credits Riparian Restoration Equivalent Credits Beginning Balance (mitigation credits) 5,001.593 42.300 0.997 0.770 Released Credits 1,500.478 12.690 0.299 0.231 Unrealized Credits 0.000 0.000 0.000 0.000 Converted Credits 0.000 0.000 0.000 0.000 Owning Program Reg. Id TIP # Project Name USACE DWR DCM Remaining Balance (Released credits) 1,500.478 12.690 0.299 0.231 Remaining Balance (Unreleased credits) 3,501.115 29.610 0.698 0.539 Total Remaining Balance (Released and Unreleased credits) 5,001.593 42.300 0.997 0.770 Page 2 of 2 From: Davis, Erin B To: Baker, Caroline D Subject: FW: IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Owen Farms Stream and Wetland Mitigation Site (DMS#100064) - (SAW-2018-01165) (DWR#20181033) - French Broad 06010105 Date: Monday, November 1, 2021 12:19:53 PM Attachments: Owen Farms 100064 FB 05 STR RW Initial Release 2021.odf imaae001.pno Laserfiche Upload: Email & Attachment DWR#: 20181033 v.1 Doc Type: Mitigation Information From: Wiesner, Paul Sent: Wednesday, June 9, 2021 3:20 PM To: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Cc: Miller, Vickie M <Vickie.Miller@hdrinc.com>; Digeronimo, Alex <adigeronimo@lmgroup.net>; Furr, Benjamin <bfurr@lmgroup.net>; Kevin Williams <kevinwilliams@lmgroup.net>; Allen, Melonie <melonie.allen@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Stanfill, Jim <jim.stanfill@ncdenr.gov> Subject: IRT Review Request: As -Built Baseline Monitoring Report (MYO) - Owen Farms Stream and Wetland Mitigation Site (DMS#100064) - (SAW-2018-01165) (DWR#20181033) - French Broad 06010105 Casey, Erin, Kim and Todd; The FINAL As -Built Baseline Monitoring Report and Record Drawings for the Owen Farms Stream and Wetland Mitigation Site (DMS#100064) were posted to the IRT Sharepoint site and DWR Laserfiche on June 9, 2021 for your review. 2021 is Monitoring Year 1 for this project. The credit ledger for the 30% release is attached for your review. Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO): Project Information: Owen Farms Stream and Wetland Mitigation Site (DMS#100064) RFP: 16-007334— Issued 09/08/2017 Institution Date: 4/25/2018 — Full Delivery French Broad River Basin Cataloging Unit 06010105 Transylvania County, North Carolina Proposed Mitigation Plan Credits: 5,043.893 SMUs (Cold) 1.767 WMUs (Riparian) As -Built MYO Project Credits: 5,043.893 SMUs (Cold) 1.767 WMUs (Riparian) Mitigation Plan Lengths/Acreages: 8,775 linear ft. 2.86 ac. As-Built-MYO Lengths/ Acreages: 8,775 linear ft. 2.716 ac. Please note: The Owen Farms project was built to design plans and guidelines. The as -built stream length was the same as proposed in the mitigation plan; however, the as -built wetland size was 0.144 acres smaller than proposed. The reduction in Wetland Group 1 is a result of a mistake at the Mitigation Plan stage that did not account for the UT 2 and UT 3 top of banks through the wetland areas, and a miscalculation of enhancement area along the left bank near STA 22+00 of WFFBR. Project credits have been kept consistent with the IRT approved mitigation plan. FD Provider: HDR; Contact: Vickie Miller, AICP, PWS; Vickie. Miller6Dhdrinc.com; Direct: 919-232- 6637, Mobile: 919-559-2632 NCDEQ- DMS PM: Paul Wiesner, Paul.wiesnerPncdenr.gov828-273-1673 FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page: https://ncconnect.sharepoint.com/sites/IRT-DMS Owen Farms_100064_MYO_2021 M 00wen Farms _100064_MYO_2021.pdf Owen Farms_100064_AB_2021 =Owen Farms _100064_AB_2021.pdf Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile paul.wiesner&ncdenr.gov Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.