Loading...
HomeMy WebLinkAbout20181273 Ver 1_Mitigation Information_20211028Mitigation Project Name DMS ID River Basin Cataloging Unit County Bug Headwaters Mitigation Site 100084 Yadkin 03040101 Wilkes USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area Signature of Official Approving Credit Release 2018-01788 2018-1273 6/22/2018 10/28/2021 Yadkin 03040101 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Cool Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 2,276.860 2,276.860 0.000 2,276.860 2021 10/28/2021 3 - Year 1 Monitoring 10.00% 758.953 2022 4 - Year 2 Monitoring 10.00% 758.953 2023 5 - Year 3 Monitoring 10.00% 758.953 2024 6 - Year 4 Monitoring 5.00% 379.477 2025 7 - Year 5 Monitoring 10.00% 758.953 2026 8 - Year 6 Monitoring 5.00% 379.477 2027 9 - Year 7 Monitoring 10.00% 758.953 2028 Stream Bankfull Standard 10.00% 758.953 2025 Totals 2,276.860 Total Gross Credits 7,589.533 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 2,276.860 Total Percentage Released 30.00% Remaining Unreleased Credits 5,312.673 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Cool Stream Restoration 6,055.000 Cool Stream Enhancement I 1,769.000 Cool Stream Enhancement II 936.000 Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Bug Headwaters Mitigation Site 100084 Yadkin 03040101 Wilkes USACE Action ID 2018-01788 DWR Permit 2018-1273 Date Project Instituted 6/22/2018 Date Prepared 10/28/2021 Stream/Wet. Service Area Yadkin 03040101 Debits Cool Stream Restoration Credits Beginning Balance (mitigation credits) 7,589.533 Released Credits 2,276.860 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit DWR DCM Remaining Balance (Released credits) 2,276.860 Remaining Balance (Unreleased credits) 5,312.673 Total Remaining Balance (Released and Unreleased credits) 7,589.533 Page 2 of 2 Laserfiche Upload: Email &Attachment O-201812)3 v.1 Doc Type: Mitigation Information From: Wiesner, Paul Sent: Thursday, October 28, 20212:18 PM To: Haywood, Casey M CIV USARMV CESAW (USA( <Casey.M. ,—.d@—te.army.mil>; Davis, EHn a <e,m.d,-@,,dervgoer, Kim Browning <Kimberly,D,Browning@usaceI-y.mil>; Tugwell, Todd 1 CIV USARMV CESAW (US) <Todd.l.Tugwell@usace.army.mil> Cc Reid, Matt hew <..Uhew-d@-d.-go Jeff Keaton<jkeamn@wildlandseng.com>; jiorch@wildlandseng.com; Shawn Wilkerson<swilkerson@wildlandseng.com>;Harmon,Beth<blth.hI--@,,cd—.g—;Stanfill,Jim<jim.stanfill@ncdenr.gov>; Allen, Melanie melonie.allen@ncdenr,gov> 5e1IRT Review Request: As -Built Baseline Monlmring Report (MVO) - Bug Headwaters Mltlgatlpn Site (DMSN100084) - (SAW -2018-01788) (DWRe10181273) -Yadkin 03040101_Wllkes County Casey, Erin, Kim and Todd; The FINAL& -built Baseline Monitoring Report and Record Drawings for the Rug Headwaters Mitigation Site (DMS# 100084) were received by DMS on October 28, 2021 and posted to the IRT SharePoint site and DW R Lasertche on October 28, 2021 for your review. 2021 is Monitoring Year 1 for this projeR. The credit ledger for the 30%release is attached far your review. Bug Headwaters Mitigation Site DMS Project p 1 84 RFPM 16-0OM6-Issued 12/7/2017 nmtution U 116/22/2018 - Full Delivery SAW-2018-01788 DWRN20181213 Vadkln River Basin Cataloging Unit 03040101 Wilkes County, North Carolina M'iriaarinn Plan Prnie hadir�: 7,589.533 SMUs (cool) As-Bu I[ -MVO Project Cred'ts 7,589.533 SMUS (cool) There was a 60-foot reduction in stream length from Mitigation Plan Footage to 1-Built Footage throughout the Site. UT3 has a 28-foot rld-ion In constructed sream length, however, this is not due to the alignment change. The originally proposed alignment was 810 feet, while the realigned ittwas submed to the IRT 811 fAs- eet. The Built Plans show that streams were d as designed with only minor deviations. The reduction in stream footage Is related m the typical difference between overall design alignment length and the surveyed stream lengths. Project adjustments are detailed in S-i., 2.1 As -built/ Record Drawings. FD Provider: Wildlands Engineering, Inc. -Contact Jeff Keaton, Ike� (919) 851-9986 ext. 103 NCDEQ- DMSPM:Matthew Reid,matthewreiAnan w.(828)-231-7912 FINALAs-Built Baseline Monitoring Report and Record Dawings can be accessed c,-1y on the DMS SharePoint site here: IRT-DMS SharePoint Page(Updated): 111111dwaters_100084_MYO_2021.pdf hrrn=://nrmnnecr share nm/sires/ RnihM Bug—dwaters_100084_AB_2021. pdf httnc//nr rchar m/�[ac/ d=%2 Fzi[ez%2 FIRT%2 DDM3%2FAZBuiItW Please It me know If you have questions or call to discuss Thanks Paul Wiesner Western Regional Supervisor Npdh Gamlina Department of Environmental Quality Western DMS Field Offlpe D-6 Rav scroll ill 102 Asheville, N.C. 28801 D� Pu- ppro am Horn mis address issaneor n me NOM Garolna Public RecoMs Law and may De disclosed fo fhiMpaNes.