HomeMy WebLinkAbout20181273 Ver 1_Mitigation Information_20211028Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Bug Headwaters Mitigation Site
100084
Yadkin
03040101
Wilkes
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/Wet. Service Area
Signature of Official Approving Credit Release
2018-01788
2018-1273
6/22/2018
10/28/2021
Yadkin 03040101
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the
NCIRT and posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Cool Stream Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
#Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
2,276.860
2,276.860
0.000
2,276.860
2021
10/28/2021
3 - Year 1 Monitoring
10.00%
758.953
2022
4 - Year 2 Monitoring
10.00%
758.953
2023
5 - Year 3 Monitoring
10.00%
758.953
2024
6 - Year 4 Monitoring
5.00%
379.477
2025
7 - Year 5 Monitoring
10.00%
758.953
2026
8 - Year 6 Monitoring
5.00%
379.477
2027
9 - Year 7 Monitoring
10.00%
758.953
2028
Stream Bankfull Standard
10.00%
758.953
2025
Totals
2,276.860
Total Gross Credits
7,589.533
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
2,276.860
Total Percentage Released
30.00%
Remaining Unreleased Credits
5,312.673
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Cool Stream
Restoration
6,055.000
Cool Stream
Enhancement I
1,769.000
Cool Stream
Enhancement II
936.000
Page 1 of 2
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Bug Headwaters Mitigation Site
100084
Yadkin
03040101
Wilkes
USACE Action ID
2018-01788
DWR Permit
2018-1273
Date Project Instituted
6/22/2018
Date Prepared
10/28/2021
Stream/Wet. Service Area
Yadkin 03040101
Debits
Cool Stream
Restoration
Credits
Beginning Balance (mitigation credits)
7,589.533
Released Credits
2,276.860
Unrealized Credits
0.000
Converted Credits
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE Permit
DWR
DCM
Remaining Balance (Released credits)
2,276.860
Remaining Balance (Unreleased credits)
5,312.673
Total Remaining Balance (Released and Unreleased credits)
7,589.533
Page 2 of 2
Laserfiche Upload: Email &Attachment
O-201812)3 v.1
Doc Type: Mitigation Information
From: Wiesner, Paul
Sent: Thursday, October 28, 20212:18 PM
To: Haywood, Casey M CIV USARMV CESAW (USA( <Casey.M. ,—.d@—te.army.mil>; Davis, EHn a <e,m.d,-@,,dervgoer, Kim Browning <Kimberly,D,Browning@usaceI-y.mil>; Tugwell, Todd 1 CIV USARMV CESAW (US) <Todd.l.Tugwell@usace.army.mil>
Cc Reid, Matt hew <..Uhew-d@-d.-go Jeff Keaton<jkeamn@wildlandseng.com>; jiorch@wildlandseng.com; Shawn Wilkerson<swilkerson@wildlandseng.com>;Harmon,Beth<blth.hI--@,,cd—.g—;Stanfill,Jim<jim.stanfill@ncdenr.gov>; Allen, Melanie
melonie.allen@ncdenr,gov>
5e1IRT Review Request: As -Built Baseline Monlmring Report (MVO) - Bug Headwaters Mltlgatlpn Site (DMSN100084) - (SAW -2018-01788) (DWRe10181273) -Yadkin 03040101_Wllkes County
Casey, Erin, Kim and Todd;
The FINAL& -built Baseline Monitoring Report and Record Drawings for the Rug Headwaters Mitigation Site (DMS# 100084) were received by DMS on October 28, 2021 and posted to the IRT SharePoint site and DW R Lasertche on October 28, 2021 for your review.
2021 is Monitoring Year 1 for this projeR. The credit ledger for the 30%release is attached far your review.
Bug Headwaters Mitigation Site
DMS Project p 1 84
RFPM 16-0OM6-Issued 12/7/2017
nmtution U 116/22/2018 - Full Delivery
SAW-2018-01788
DWRN20181213
Vadkln River Basin
Cataloging Unit 03040101
Wilkes County, North Carolina
M'iriaarinn Plan Prnie hadir�:
7,589.533 SMUs (cool)
As-Bu I[ -MVO Project Cred'ts
7,589.533 SMUS (cool)
There was a 60-foot reduction in stream length from Mitigation Plan Footage to 1-Built Footage throughout the Site. UT3 has a 28-foot rld-ion In constructed sream length, however, this is not due to the alignment change. The originally proposed alignment was 810 feet, while the realigned
ittwas submed to the IRT 811 fAs-
eet. The Built Plans show that streams were d as designed with only minor deviations. The reduction in stream footage Is related m the typical difference between overall design alignment length and the surveyed stream lengths.
Project adjustments are detailed in S-i., 2.1 As -built/ Record Drawings.
FD Provider: Wildlands Engineering, Inc. -Contact Jeff Keaton, Ike� (919) 851-9986 ext. 103
NCDEQ- DMSPM:Matthew Reid,matthewreiAnan w.(828)-231-7912
FINALAs-Built Baseline Monitoring Report and Record Dawings can be accessed c,-1y on the DMS SharePoint site here:
IRT-DMS SharePoint Page(Updated):
111111dwaters_100084_MYO_2021.pdf
hrrn=://nrmnnecr share nm/sires/
RnihM
Bug—dwaters_100084_AB_2021. pdf
httnc//nr rchar m/�[ac/
d=%2 Fzi[ez%2 FIRT%2 DDM3%2FAZBuiItW
Please It me know If you have questions or call to discuss
Thanks
Paul Wiesner
Western Regional Supervisor
Npdh Gamlina Department of Environmental Quality
Western DMS Field Offlpe
D-6 Rav scroll
ill 102
Asheville, N.C. 28801
D�
Pu-
ppro am Horn mis address issaneor n me
NOM Garolna Public RecoMs Law and may De disclosed fo fhiMpaNes.