HomeMy WebLinkAbout20181273 Ver 1_Minor alignment change at Bug Headwaters_20210422Strickland, Bev From: Jeff Keaton <jkeaton@wildlandseng.com> Sent: Thursday, April 22, 2021 1:15 PM To: Kim Browning Cc: Reid, Matthew; Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B Subject: [External] RE: Minor alignment change at Bug Headwaters Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Thanks, Kim. That pond will be the last thing that needs to be planted after this week. Should be done by April 30. Jeff Original Message From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, April 22, 2021 1:06 PM To: Jeff Keaton <jkeaton@wildlandseng.com> Cc: Reid, Matthew <matthew.reid@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov> Subject: FW: Minor alignment change at Bug Headwaters Hi Jeff Thanks for the notice. That will be fine. When you submit the as -built, please have Paul or Matthew indicate the change in linear feet and that the credits will not be adjusted, and a brief explanation, like below, for the change. Will the planting be completed by April 30? Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers Original Message From: Jeff Keaton <jkeaton@wildlandseng.com> Sent: Thursday, April 22, 2021 9:55 AM To: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Cc: Reid, Matthew <matthew.reid@ncdenr.gov> Subject: [Non-DoD Source] Minor alignment change at Bug Headwaters Hi Kim - Hope you are doing well. The construction on the Bug Headwaters site in Wilkes County is almost complete. We are working on the final few hundred feet of channel. We've encountered some bad soil in a pond bed. Because of this, we need to shift the alignment to the left ranging from 5 to 15 feet. This shift will allow us to expedite completion of the project. The shift will not create a narrow easement on the left side and the overall length of the stream through the pond will be 1 foot longer than the original design. DMS asked me to notify you of this planned alignment change. The attached map shows the original alignment in red and the revised alignment in blue. Of course the as -built report will show this change. Let me know if you have any questions or concerns about this change or if you are OK with us proceeding with the revised alignment. Since this is the last step, we expect major construction to be complete in the next week or so. Thanks. Jeff Keaton, PE I Senior Water Resources Engineer 0: 919.851.9986 x103 M: 919.302.6919 Wildlands Engineering, Inc. <Blockedhttp://www.wildlandseng.com/> 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 2