HomeMy WebLinkAboutNCG020966_Cover Letter (Signed)_20211029DocuSign Envelope ID: A62FB16F-848B-4AD9-81F0-A480818135A6
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Mid East Materials, LLC
Attn: Andrew Phillips
910 S. Clinton Ave
Dunn, NC 26334
NORTH CAROLINA
Environmental Quality
10/29/2021
Subject: General Permit No. NCG020000
Buckleberry Mine
COC No. NCG020966
Johnston County
Dear Andrew Phillips:
In accordance with your application for a discharge permit received on October 27, 2020, we are
forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state -
NPDES general permit. This permit is issued pursuant to the requirements of North Carolina
General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US
Environmental Protection Agency dated October 15, 2007 (or as subsequently amended).
In order to comply with the conditions of NCG020000 to which you are now subject, you are
required to do the following:
➢ Implement a SWPPP before beginning operations.
➢ Download and print a copy of the NCG020000 Permit from the General Permits page on
the NPDES Industrial Stormwater Program web site, which can be reached by typing
"deq.nc.gov/SW-industrial" into your browser and hitting enter.
➢ When you receive an invoice for your annual permit fee each year, pay it promptly.
Electronic payment is convenient and quick, you can access the ePayment web site by
typing "deq.nc.gov/SW-ePayments" into your browser and hitting enter.
➢ If you have not already enrolled in electronic Data Monitoring Reports (eDMR), view
the six step process and complete the registration by typing "deq.nc.gov/SW-eDMR"
into your browser and hitting enter.
➢ Keep information about your facility name, ownership, legally responsible person,
address, and stormwater outfalls up to date. See the Industrial Stormwater Program
web site for instructions.
➢ Acquire an approved Operation and Monitoring Plan before mine dewatering
discharges occur at your facility due the potential impact to adjacent wetlands. An
Operation and Monitoring Plan for your facility must be submitted to
D � North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CARCLINF
De ,4—t01 �w6�mi aml ry 919.707.9200
DocuSign Envelope ID: A62FB16F-848B-4AD9-81F0-A480818135A6
the Raleigh Regional Office within 60 days of your receipt of this permit. Contact Thad
Valentine at the Raleigh Regional Office at (919) 791-4200 for more information about
the approval process.
Per the requirements of the Neuse Riparian Buffer Rule, all stormwater drainage to stream buffers, from
portions of this site that have been constructed after July 22, 1997, must meet diffuse flow requirements
per 15A NCAC 2B .0233(5).
Please take notice that this certificate of coverage is not transferable except upon approval from the
Division of Energy, Mineral, and Land Resources (Division). The Division may require modification
or revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required
by the Division of Water Resources, the Coastal Area Management Act, or any other federal or local
government permit that may be required.
If you have any questions concerning this permit, please contact Brittany Carson at (919) 707-3648
or by email at brittany.carsonOncdenr.gov.
Sincerely,
DocuSigned by:
3D05378331FD407...
for Brian Wrenn, Director
Division of Energy, Mineral, and Land Resources
cc: Raleigh Regional Office / T. Valentine
D Q
'D North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-1612
OLINA NORTH Z
oaP.ro,remKV /"� 919.707.9200