Loading...
HomeMy WebLinkAbout20070621 Ver 1_Stormwater Info_20070717((g/f estcatt Engineering onsulting, PC Date: July 16, 2007 ~7-O 1D~1 To: Division of Water Quality From: Michael B. Westcott, PE NCDENR Westcott Engineering & Consulting, PC 401/Wetlands Unit 4015 Meeting Way 1650 Mail Service Center Suite 105 Raleigh, NC 27699-1650 High Point, NC 27265 We are sending you ®attached ^ under separate cover the following items: ^ Shop Drawings ^ Estimate ^ Disk ^ Prints ^ Specifications ®Other ^ Contracts ^ Copy of Letter COPIES DRAWII~IG ND DESG~~~I DISgQS1TIE'11 1 Chamberlain Place Apartments Accidentally left off Bio-Cell Information of previous submittal ~~ REMARKS: cc: File s~ ~C~CQ ~~~ :. ~ ~.~ L._ ~~ L`.:• .I~! 1 7 2001 .~iw,;. vb~iEr.QUAUTY NltTLar,0~; d, ~p STi)'~~;~yATER BRANGIi -Sz ~ ~~ ~~ 4015 Meeting Way, Suite 105, High Point, NC 27265 Phone: (336) 812-3546 Fax (336) 812-8075 Engineering ;consulting, Date: June 27, 2007 ~ ~~ To: Division of Water Quality From: Michael B. Westcott, PE NCDNR Westcott Engineering & Consulting, PC 401/Wetlands Unit 4015 Meeting Way 1650 Mail Service Center Suite 105 Raleigh, NC 27699-1650 High Point, NC 27265 We are sending you ®attached ^ under separate cover the following items: ^ Shop Drawings ^ Estimate ^ Disk ® Prints ^ Specifications ®Other ^ Contracts ^ Copy of Letter ~ COPIES -~ I~R:1V1~`INU ~0 - - L)L~.SCR1P"I`ION UISPOSI"I-ION 7 Pre-Construction Notification For Approval (PCN) Revised Application Form for Golding Center Drive Development (Chamberlain Place) 7 Revised Copies of Impact Area For Approval Drawings 5 Bio-cell Watershed Plans For Approval 5 Calculations For Approval REMARKS: Please do not hesitate to contact us if you have any questions or comments. Thank you cc: File 4015 Meeting Way, Suite 105, High Point, NC 27265 Phone: (336) 812-3546 Fax (336) 812-8075 ~- >A MAINTENANCE~REQUIREMENTS FOR BIORETENTIONAREAS DESCRIPTION )METHOD FREQUENCY TIME OF YEAR SOIL INSPECT AND REPAIR VISUAL MONTHLY MONTHLY I EROSION ORGANIC LAYER REMULCH ANY VOID AREAS BY HANG WHENEVER NEEDED WHENEVER NEEDED REMOVE PREVl0U5 MULCH LAYER BEFORE APPLYING BY NANO ONCE EVERY TWU OR SPRING j NEW LAYER (OPTIONAL) THREE YEARS ANY ADDITIONAL MULCH BY HAND ONCE A YEAR SPRING ~ ADDED i PLAN'T'S i REMOVE AND REPLACEMENT SEE PLANTING S/15 TO 4/30 AND 70/i TO 71/30 . OF ALL OEAD~ANO DISEASED SPECIFlCATON I VEGETATION CONSIDERED BEYOND TREATMENT TREAT ALL DISEASED TREES MECHANICAL N/A VARIES, DUT WILL DEPEND ON INSECT ' ANO SHRUBS OR BY HAND OR DISEASE INFESTATION WAII]i OF PLANT MAlER1AL BY HAND IMMEDIATELY AFTER N/A SHALL TAKE PLACE AT END COMPLETION OF OF EACH OAY FOR 14 PRO~£CT CONSECU'RVE DAYS ANO AFTER PLANTING HAS BEEN COMPLETED REPLACEMENT OF SUPPORT BY HAND ONCE A YEAR ONLY REMOVE STAKE IN SPRING STAKES REPLACEMENT OF DEFlCIENT BY~HANO WHENEVER NEEDED WHENEVER NEEDED STAKES OR WIRES TINGS TO VISUAL/B AFTER PERIODS O ENSURE THEY REMAIN HEALTHY; REPLACE HAND PROLONGED WHENEVER NEEDED AS NEEDEDVATH SIMILAR INUNDATION PLANTS. IF STORMWATER INUNDATES THE Bl0-CELL FOR MORE THAN 72 HOURS AFTER A STORM EVENT THE BIO-CELL IS NOT FUNCTIONING AS INTENDED AND A PROFESSIONAL ENGINEER SHALL BE CONSULTED FOR REMEDIAL PLANS. PLANS SHALL BE FORWARDED TO THE GOVERNMENTAL OFFICE HAVING JURISDICTION FOR WATERSHED PROTECIIOt~_FS)R .ARP.ROVAL. The above information is true and correct to the best of my knowledge and belief and was provided by me under oath. (This form must be signed by the financially responsible person if an individual, or if not an individual, by an officer, director, partner or attorney-in-fact, or registered agent with authority to execute instruments for the financially responsible party.). I agree to provide corrected information should there be any change in the information provided herein. (v ~l ~ ~ } J ~ -f?' ~t Q Type or Prini~Name >r Signature Title of Authority Date I> ~ S - `' l~L a Notary Public of the County of C,w~ State of North Carolina, do hereby certify that ~jGu(Y~ ~ ~~~~ appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my hand and notarial seal, this aa~ day of _~ U~y~~- , 20 U~ Notary Public My commission expires: ~ ~'D' ~b T- DWQ Project DNISION OF WATERQUALITY - BK)RETENTION AREA WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : i'~hati,b<.- la, ,. ~p~. 4-me n is Contact Person: rr1,~~1.a~ ~ t,~'1 e~tr~ a,}I.- Phone Number: (33L) ~rL - sstic. For projects with multiple basins, specify which basin this worksheet applies to: ~ ~c Cr ii :xs- Permanent Pool Elevation Temporary Pool Elevation .v/~ ft. -aCi~i. Sty ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST *~4.s4.}-r~ sq. ft. C-~ , sL. ac. ac. C•5~ 5.~ 7.13 fps i1.~16 in ~ (o' ft. (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) .~ . c~U in./hr. (the soil layer down to 4 feet) (1,~ -d rc.,. in.lhr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. !f a requirement has not been met, aftach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and ouflet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Aoolicants Initials ~NQ~~ No vertical sand bed is proposed ~~~a The Bioretention area is at least 40 feet by 15 feet. ~,~~ ,; Sheet flow is provided at inlet. .;~1.v .,.> Water table depth is greater than 6 feet. ~w Minimum of 6" ponding is provided. /1'IB~J The ponded area will draw down in less than 4 days. ~lS. / Planting soil infiltration rate is greater than 0.52 in/hr. u~a : ~L-. ~ ~o,~, sreThe in-situ soil infiltration rate is greater than 0.2 in/hr. .m.~:- A planting plan with species and densities is provided. 1776. v Mulch layer is speafied in plans. ,~Ylc4,.-~ Planting soil meets minimum soil specifications {NCDENR Stonnwater Best Management Practices Manual, April 1999) .~.8~ ~ Plan details for the Bioretention area provided. .~a~J Plan details for the inlet and outlet are provided. Est,,;, An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project No. DIVISION OF WATERQUALITY - BIORETENTION AREA WORKSHEET f. PROJECT INFORMATION (please complete the following information): Project Name : ~GrG,,~,b~ •-/w,;~ .~o~,-fir,~.r~s Contact Person: /yJ,~ti~ ~ / L~ts}~~ ~ Phone Number: (~~~) ~! z -3 J. yG. For projects with multiple basins, specify which basin this worksheet applies to: B-o ,(..~i/ ~ Permanent Pool Elevation Temporary Pool Elevation iv /~~ ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) Bioretenfion Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST -`~.`~i~ sq. ft. c~. ~ z_ ac. ac. ~.a~ 5.G d . 8~ fps .IG in > t, ~ tt. (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o} (the soil layer down to 4 feet) /-'l„aI~~~%-..,.-., in.mr. (the soil layer below 4 feet or below the sand bed} Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. !f a requirement has not been met, attach an explanafron of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design ca~ulations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substanfial{y delay final review and approval of the project. Aaolicants Initials ,m.~3~ ~ No vertical sand bed is proposed ~ a ~~ The bioretention area is at least 40 feet by 15 feet. _trl~s ~~ Sheet flow is provided at inlet. ~s~ ~.•~ Water table depth is greater than 6 feet. ~i~s~.~ Minimum of 6" ponding is provided. ~9tfGc~ The ponded area will draw down in less than 4 days. /,r9~c/ Planting soil infiltration rate is greater than 0.52 infir. G/n~r~c%.:. The in-situ soil infiltration rate is greater than 0.2 inlhr. tee. ~ A planting plan with species and densities is provided. .~-i ~. u Mulch layer is speafied irr plans. ~'~dk1 Planting soil meets minimum soil specifications (NCDENR Stomtwater Best Management Practices Manual, April 1999) ,~,~.,a •v Plan details for the bioretention area provided. .,a s ~~ Plan details for the inlet and outlet are provided. /Llcf~ An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project No I. PROJECT Project Name DIVISION OF WATER QUALITY - BIORETENTtON AREA WORKSHEET the following information): Contact Person: /1~ c6~ / 1.L2~~ sL,.. ~ Phone Number. (?,iG) fri Z -~63"s/G For projects with multiple basins, specify which basin this worksheet applies to: ,f~~o C i/ #3 Permanent Pool Elevation ~i / ~ ft. (elevation of the orifice invert out) Temporary Pool Elevation ~ c,/. o i ft. (elevation of the outlet structure invert in) Bioretention Surface Area ~~~~! sq. ft. Drainage Area ! • ~' 3 ac. (on-site and off-site drainage to the basin) Impervious Area ac. (on-site and off-site drainage to the basin) Rational C Coefficient t~ - B~ Size % S % (either 5% in w/sand under drain or 7% in w/o) Inlet Velocity 3 _3~ fps Inlet flow depth S . ~ 5c in Depth to Ground Water > c.' ft. Planting Soil Infiltration Rate 5 , G, 5I in./hr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate j./:,~~ ~~,.., in.lhr. (the soil layer below 4 feet or below the sand bed) REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substanfially delay final review and approval of the project. Aaolicants Initials iYl.6L' J No vertical sand bed is proposed /~$zcJ The bioretention area is at feast 40 feet by 15 feet. /J7E~CC~ Sheet flow is provided at inlet. ~.Cd~J Water table depth is greater than 6 feet. /~d~ J Minimum of 6" ponding is provided. !~~ The ponded area will draw down in less than 4 days. s~~GJ Planting soil infiltration rate is greater than 0.52 in/hr. l/~,d<; S.-ter;„ The in-situ soil infiltration rate is greater than 0.2 in/hr. `rl6~ A planting plan with species and densities is provided. ~/•Bw Mulch layer is speafied in plans. iylefw Planting soil meets minimum soil specifications (NCDENR Stomtwater Best Management Practices Manual, April 1999) i1~~ Plan details for the bioretention area provided. ~,cScJ Plan details for the inlet and outlet are provided. ~~w An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project No, DNISION OF WATERQUALITY - BIORETENTfON AREA WORKSHEET I. PROJECT INFORMATION (please compete the following information): Project Name : l~i,~„,1,Cr/a,;. ~j"//~.~.~rr,~„~s Contact Person: /YJ. r~.u./ Gcks/~D•,(1~ Phone Number. (33v) &~t~ For projects with multiple basins, specify which basin this worksheet applies to: .C3 v f i/ ~ 5~ Permanent Pool Elevation N/f`~ ft. (elevation of the orifice invert out) Temporary Pool Elevation ~ ~ S . s'u ft. (elevation of the outlet structure invert in) Bioretention Surface Area / l2 ~ sq. ft. Drainage Area p. ~ ac. Impervious Area ac. Rational C Coefficient ~, Bfl Size % ~ inlet Velocity ~. ZP fps Inlet flow depth ~. 'l~l in Depth to Ground Water 7 lam' ft. Planting Soil Infiltration Rate ~^•Cv~-/ in./hr. In-Situ Soil lnfiltration Rate ~/.,/.../,-.~. ~ in.lhr. (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) (the soil layer down to 4 feet) (the soil layer below 4 feet or below the sand bed) II. REQUIRED ITEMS CHECKLIST Initial in the space provided ro indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design ca~ulations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Aaplicants Initials No vertical sand bed is proposed /+»+8~~ The bioretention area is at least 40 feet by 15 feet. /YlRLV Sheet flow is provided at inlet. ~~FS~~ Water table depth is greater than 6 feet. /y1.6~ Minimum of 6" ponding is provided. ~d~ The ponded area will draw down in less than 4 days. /y~,Bry Planting soil infiltration rate is greater than 0.52 in/hr. Un~tidre. • ~ The in-situ soil infiltration rate is greater than 0.2 in/hr. /1~Jd~ A planting plan with species and densities is provided. rnd~ Mulch layer is specified in plans. ~~ Planting soil meets minimum mil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) d~d~J Plan details for the bioretention area provided. ~6~ Plan details for the inlet and outlet are provided. .IlBc~u An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project DIVISION OF WATERQUALITY - BIORETENTION AREA WORKSHEET t. PROJECT INFbRMATION (please com lete the following information): Project Name : t~a~berla~~ ~,atr-h'-~•~ ~5 Contact Person: YYI~~e%__ ~Jc~~+~-- Phone For projects with multiple basins, specify which basin this worksheet applies to: l~,o Ce// ~` ~- , Permanent Pool Elevation N ~ ft. (elevation of the orifice invert out) Temporary Pool Elevation ~~ i . a i ft. (elevation of the outlet structure invert in) Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size 149a sq. ft. !~. ~~ ac. ac. ~~.Sv (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST G, _ `Sa fps I t . ~`i in ~ c..' ft. cry in.lhr (the soil layer down to 4 feet) -U,,,1~ .-,~~ •.., in.mr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanafton of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet stricture details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Aaolicants Initials /ylD~ No vertical sand bed is proposed iJ9B~~ The bioretention area is at least 40 feet by 15 feet. /~''1E3u] Sheet flow is provided at inlet. ~,ScJ Water table depth is greater than 6 feet. m.8 ~J Minimum of 6" ponding is provided. ~.d W The ponded area will draw down in less than 4 days. U~~,/edr~ •.. Planting soil infiltration rate is greater than 0.52 inlhr. n~dc.J The in-situ soil infiltration rate is greater than 0.2 inlhr. /~Jd Gc~ A planting plan with species and densities is provided. /y/d~J Mulch layer is specified in plans. /t~,Bcv Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999} islBu:~ Plan details for the bioretention area provided. r+~6 w Plan details for the inlet and outlet are provided. fit! w An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project I. PROJECT IN Project Name DIVISION OF WATERQUALITY - BK)RETENTION AREA WORKSHEET (please complete the following information): Contact Person: /J'/, cd,~.t / /rL7~-Sf~o,rL Phone Number. (~G) 8/z :~'"y'~ For projects with multiple basins, specify which basin this worksheet applies to: ,B a ~</i ~ 7 Permanent Pool Elevation Temporary Pool Elevation Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST ~ ,~ tt. (elevation of the orifice invert out) ~~e, g'/ fl. (elevation of the outlet stricture invert in) ~/~ S 7 sq. ft. t •Sd`d ac. (on-site and off-site drainage to the basin) ac. (on-site and off-site drainage to the basin) ~,~ S % (either 5°!° in w/sand under drain or 7% in w/o) S'.3z- fps 7,r~ in 1 L' ft. S. !o y in./hr. (the soil layer down to 4 feet) lh~~. ~.-_•,• -, in./hr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanafion of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet stricture details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Aoolicants Initials /~l,B~ No vertical sand bed is proposed /l~,Ffc.~ The bioretention area is at least 40 feet by 15 feet. ~lBcu Sheet flow is provided at inlet. ~,d~u Water table depth is greater than 6 feet. ~~ Minimum of 6" ponding is provided. /1lB~,.> The ponded area will draw down in less than 4 days. /J~d.:~i Planting soil infiltration rate is greater than 0.52 in/hr. Gle! a.!-~..~ The in-situ soil infiltration rate is greaterthan 0.2 in/hr. ~116scJ A planting plan with species and densities is provided. ~,6~ Mulch layer is specified in plans. /~,A/-~ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) ~d<c~ Plan details for the bioretention area provided. /~dw Plan details for the inlet and outlet are provided. ~i,B~ An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project DNISION OF WATER QUALITY - BK)RETENTION AREA WORKSHEET I. PROJECT INFbRMAT1ON (please complete the following information): Project Name : Clnambr rla,-.-, ~v~ . Contact Person: IM:c~I (~r~~n~l- Phone NuQmber. (3d~) ~/z -35'~/~ For projects with multiple basins, specify which basin this worksheet applies to: I~oce!/ tt ~ Permanent Pool Elevation .N~_ ft. (elevation of the orifice invert out) Temporary Pool Elevation -7.s~. as ft. (elevation of the outlet structure invert in) Bioretention Surface Area ~cr, 2 sq. ft. Drainage Area b•s 7 ac. (on-site and off-site drainage to the basin) Impervious Area ac. (on-site and off-site drainage to the basin) Rational C Coefficient c~.~ Size % ~ % (either 5°!° in w/sand under drain or 7% in w/o) Inlet Velocity 3 • ~S? fps Inlet flow depth 3 . S(„ in Depth to Ground Water ~ ~, ' ft. Planting Soil Infiltration Rate S-, G,y in./hr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate l~~~i,-.lna. •~ in.lhr. (the soil layer below 4 feet or below the sand bed) REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design ca~ulations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials /n,Bcy No vertical sand bed is proposed /JS,4~J The bioretention area is at least 40 feet by 15 feet. ~~ Sheet flow is provided at inlet. /Y1,9iJ Water table depth is greater than 6 feet. ~~~ Minimum of 6" ponding is provided. /tJ,A~ The ponded area wilt draw down in less than 4 days. .iv~BsJ Planting soil infiltration rate is greater than 0.52 inmr. G/~dir~ rte, rr The in-situ soil infiltration rate is greater than 0.2 in/hr. ~.B~J A planting plan with species and densities is provided. ~,8~ Mulch layer is specified in plans. /~1,J° u~ Planting soil meets minimum soil specifications (NCDENR Stomtwater Best Management Practices Manual, April 1999) /~~9ccJ Plan details for the bioretention area provided. .~,esJ Plan details for the inlet and outlet are provided. ~i,eu~ An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project DNISION OF WATER QUALITY - BIORETENTfON AREA WORKSHEET I. PROJECT INFbRMATION (please complete the following information}: Project Name : t~v~w~lacita,ti 14p4-~ Contact Person: yvt. ~ i ~ ,~s(«1e- Phone Number. (~•) ~Z -35y~ For projects with multiple basins, specify which basin this worksheet applies to: f3~ccr li ~/D Permanent Pool Elevation Temporary Pool Elevation Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST .v/,~ ft. 751~.~5 ft. ~/ Y 7 sq. ft. ~ .~ z ac. ac. 0."Xb s °~° ~'.c*5' fps U.3"7 in ~ ~.' ft. S lc5~ in./hr (elevation of the orifice invert out) (elevation of the outlet structure invert in) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) (the soil layer down to 4 feet) /,G, /<. a/.-a. ~ in.lhr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stomtwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials .~,3~..0 No vertical sand bed is proposed /h,~.u The bioretention area is at feast 40 feet by 15 feet. il2OrJ Sheet flow is provided at inlet. ~J~J Water table depth is greater than 6 feet. _~.Bu:~ Minimum of 6" ponding is provided. rt~,(~:c~ The ponded area will draw down in less than 4 days. /~d~v Planting soil infiltration rate is greater than 0.52 in/hr. Ll ~,~,-..... The in-situ soil infiltration rate is greater than 0.2 in/hr. Bus A planting plan with species and densities is provided. ~B~v MuJch layer is specified in plans. .~>,~cy Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) f9~,Brc) Plan details for the bioretention area provided. ~~~~ Plan details for the inlet and outlet are provided. ~Ylo~y An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project DIVISION OFWATERQUALITY - BIORETENTION AREA WORKSHEET PROJECT INFbRMATION (please complete the following information): Project Name : ~ il~.n-M~crkf,n /~ Contact Person: IM,d...e.l ~r.~cs~iEt Phone Number. For projects with multiple basins, specify which basin this worksheet applies to: B:au Permanent Pool Elevation Temporary Pool Elevation Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size ~/~.~ ft. 7 fs'S. ~ b ft. // i/3 sq. ft. D . ~• ac. ac. c~.S~ S 2- (elevation of the orifice invert out) (elevation of the outlet structure invert in) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o Inlet Velocity 4 . r `1 fps Inlet flow depth 3 . ~ S in Depth to Ground Water > ~' ft. Planting Soil Infiltration Rate :S,ca~/ in.lhr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate ~lnd,.~/,p, ., in.lttr. (the soil layer below 4 feet or below the sand bed) REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials M,Bt,IJ No vertical sand bed is proposed ~rfd,,•3 The bioretention area is at least 40 feet by 15 feet. fy-6,,,~ Sheet flow is provided at inlet. fs~B~ Water table depth is greater than 6 feet. ~.r~,6 c.a Minimum of 6" ponding is provided. s?+B~u The ponded area will draw down in less than 4 days. .'~,c3c.+J Planting soil infiltration rate is greater than 0.52 inmr. /s~na~r~po. -, The in-situ soil infiltration rate is greater than 0.2 in/hr. i'i1Bau A planting plan with species and densities is provided. /hB~~ Mulch layer is specified in plans. rh,dL~ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) ir,~c•> Plan details for the bioretention area provided. `iJd cJ Plan details for the inlet and outlet are provided. i71,e?eJ An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that undeMrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project DNISION OF WATERQUALITY - BIORETENTION AREA WORKSHEET I. PROJECT INFbRMATION (please complete the following information): Project Name : C`%hn„nh~.l~,,. Aroma Contact Person: yr :~.~~ t~J~s4za~ Phone Number. j3~) ~~L-35~/G For projects with multiple basins, specify which basin this worksheet applies to: Ig~ac~ 4 ~- t Z Permanent Pool Elevation N//~ ft. (elevation of the orifice invert out) Temporary Pool Elevation 7.; 3. sts ft. (elevation of the outlet structure invert in) Bioretention Surface Area ~ yo Z sq. ft. Drainage Area 1• S`t ac. (on-site and off-site drainage to the basin) Impervious Area ac. (on-site and off-site drainage to the basin) Rational C Coefficient n,Se+ Size % ..5' % (either 5% in w/sand under drain or 7% in w/o) Inlet Velocity ~ • ~ 7 fps Inlet flow depth S~, 24 in Depth to Ground Water ? Ce ft. Planting Soil Infiltration Rate ,~ . L- y in./hr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate ~./.~/~_•a~.~. ~ in.mr. (the soil layer below 4 feet or below the sand bed) REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanafron of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Aoalicants Initials ~Yl,6c,J No vertical sand bed is proposed /hB~~c.7 The bioretention area is at least 40 feet by 15 feet. /1~,Bc~ Sheet flow is provided at inlet. ~~~ Water table depth is greater than 6 feet. /hHcJ Minimum of 6" ponding is provided. /~,6+-*~ The ponded area wiN draw down in less than 4 days. /J~,Bu~ Planting soil infiltration rate is greater than 0.52 in/hr. ~.Gv~,alr~.., The in-situ soil infiltration rate is greater than 0.2 in/hr. /~9i~J A planting plan with species and densities is provided. /N,B~ Mulch layer is specified in plans. ~,6~ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) /y1~ Plan details for the bioretention area provided. ~ll.B~ Plan details for the inlet and outlet are provided. h+,Bia An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project DIVISION OF WATERQUALITY - BIORETENTION AREA WORKSHEET PROJECT INFORMATION (please complete the following information): Project Name : flh,.~bcrt~; ti mks Contact Person: IM;cI,.,~~ (,4„ c~F~4} Phone Number. (~G) biz -35~C ~ For projects with multiple basins, specify which basin this worksheet applies to: tgiv~ `~/ ~i3 Permanent Pool Elevation Temporary Pool Elevation /+/~,~ ft. 4b-7•t,G. ft. (elevation of the orifice invert out) (elevation of the outlet stricture invert in) Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST !~ 7 sq. ft. U-~/~. ac. ac. ~>°aG ~'. zs fps ~3 in ~ c, ft. 5'.G,r/ in./hr. (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) (the soil layer down to 4 feet) (~~,,. ~ „-a. rv. in.lhr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. if a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design ca~ulations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ~9©sv No vertical sand bed is proposed ~A~•~ The bioretention area is at least 40 feet by 15 feet. ~BtrJ Sheet flow is provided at inlet. i!,k~it~ Water table depth is greater than 6 feet. ~B~d Minimum of 6" ponding is provided. /~B~-~ The ponded area will draw down in less than 4 days. /~,c4~y Planting soil infiltration rate is greater than 0.52 inlhr. L1.aoti-,-~r.~.n The in-situ soil infiltration rate is greater than 0.2 in/hr. ~.~~c~ A planting plan with species and densities is provided. ~B~ Mulch layer is specified in plans. ~.& ~ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) s~i,B•J Plan details for the bioretention area provided. /j1d~~ Plan details for the inlet and outlet are provided. /y!,®cv An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project No. DIVISION OF WATER QUALITY - BK)RETENTION AREA WORKSHEET I. PROJECT INFbRMATION (please complete the following information): Project Name : ~6~a~,~.~/a,~ /,•o/: Contact Person: f// L~ / (.,l~t a~~..ri~ Phone Number. (33(ir) ir~2-3~'S~6 For projects with multiple basins, specify which basin this worksheet applies to: ,l~i~c// #i5/ Permanent Pool Elevation Temporary Pool Elevation N~ fl. 79G.oy ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infihration Rate REQUIRED ITEMS CHECKLIST (d9 ~ sq. ft. V.3a ac. ac. lr9. ~a 3 v fps 1 in > v ft. s,~,y in.lhr (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) (the soil layer down to 4 feet) Lt.~le~.,~. in.llir. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanafron of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. No vertical sand bed is proposed The bioretention area is at least 40 feet by 15 feet. //~Li~~ Sheet flow is provided at inlet. ~~G~ Water table depth is greater than 6 feet. .yl Minimum of 6" ponding is provided. fyl i _ The ponded area will draw down in less than 4 days. ,//yl,~ic- Planting soil infiltration rate is greater than 0.52 inllir. Glndt.2~rs• • ~- The in-situ soil infiltration rate is greater than 0.2 in/hr. /~,L1c J A planting plan with species and densities is provided. /yJ,Bic~ Mulch layer is specified in plans. /1~x~iC~ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) /~~J Plan details for the bioretention area provided. s~>~~?~ Plan details for the inlet and outlet are provided. r,~,Bc,J An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptahle in the Piedmont and Mountains DWQ Project No. DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET PROJECT INFORMATION (please complete,~he following information): Project Name Contact Person: Phone Number: (:~'~v) 8/Z ~~"'/r!o For projects with multiple basins, specify which basin this worksheet applies to: ~o~// /f'-' Permanent Pool Elevation Temporary Pool Elevation Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST N,~q tt. (elevation of the orifice invert out) ~ ~~ .s°~ tt. (elevation of the outlet structure invert in) i3bt3 sq. ft. 1 • `J ac. (on-site and off-site drainage to the basin) ac. (on-site and off-site drainage to the basin) b. s~ S' % (either 5% in w/sand under drain or 7% in w/o) ~ • 73 fps '7. -7$ in ~ co ft. 5'.4.4/ in.lhr. (the soil layer down to 4 feet) ~l ,~ r~~4-`. ,~ in.mr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stomtwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Aoolicants Initials /~l,Bc9' No vertical sand bed is proposed f~~r,U The bioretention area is at least 40 feet by 15 feet. ~i~lt~ Sheet flow is provided at inlet. i~9,c~cJ Water table depth is greater than 6 feet. i~Br~~ Minimum of 6" ponding is provided. L'ylBc~' The ponded area will draw down in less than 4 days. ~Bc-J Planting soil infiltration rate is greater than 0.52 inlhr. L/r~~.-~r~, .:., The in-situ soil infiltration rate is greater than 0.2 in/hr. ~~L-~u~ A planting plan with species and densities is provided. ~l~9cJ Mulch layer is speafied in plans. - i7JBG~~ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) fY~ig..~,~ Plan details for the bioretention area provided. ,19,8l~ Plan details for the inlet and outlet are provided. I7~B~U An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project No. DNISION OF WATER QUALITY - BK)RETENTiON AREA WORKSHEET I. PROJECT INFORMATION (please complete the following informafion): Project Name : ~Gtmbc.-(a,r )a,v ~~ Contact Person: YN,'c1,e.~ i t t`~5~ra~ Phone Number: ~:33c.) b`iz-3syG For projects with multiple basins, speaty which basin this worksheet applies to: L`~sotC// /~ Permanent Pool Elevation ~i ft. (elevation of the orifice invert out) Temporary Pool Elevation 7 ~. Sb ft. (elevation of the outlet structure invert in) Bioretention Surface Area I ~ Zv sq. ft. Drainage Area 6.57 ac. (on-site and off-site drainage to the basin) Impervious Area ac. (on-site and off-site drainage to the basin) Rational G Coefficient D.~ Size % ~' % (either 5% in w/sand under drain or 7% in w/o) Inlet Velocity 3 . ~ fps Inlet flow depth 1 in Depth to Ground Water > cp ft. Planting Soil Infiltration Rate 5^. ~ y in./hr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate 1.(.~~,-dr,r.,.. in./hr. (the soil layer below 4 feet or below the sand bed) REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outtet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. No vertical sand bed is proposed The Bioretention area is at least 40 feet by 15 feet. /~7.CS ry Sheet flow is provided at inlet. /1~,Q~t,7 Water table depth is greater than 6 feet. /~,Qu:~ Minimum of 6" ponding is provided. f°'il~l~ The ponded area will draw down in less than 4 days. /7'Bcc~ Planting soil infiltration rate is greater than 0.52 inlhr. ~,~~.>.~, The in-situ soil infiltration rate is greater than 0.2 in/hr. f1ZQc.c..) A planting plan with species and densities is provided. ,~.Bc.J Mulch layer is specified in plans. ~,B u~ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) f'hl~•~c~ Plan details for the Bioretention area provided. iyiBcc~ Plan details for the inlet and outlet are provided. /l1,B~:J An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project No. DNISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET PROJECT INFbRMAT1ON (please complete the following information): Project Name : l ha~~lcx:r t'~~s Contact Person: IM . tt~stzb~k Phone Number. (33c.) ~YZ ~3Sti/G. For projects with multiple basins, specify which basin this worksheet applies to: ~~ c~ce // / 7 Permanent Pool Elevation Temporary Pool Elevation NfA 7L .S-.S~ (elevation of the orifice invert out) (elevation of the outlet structure invert in) Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST ~ 33`i sq. ft. ~~~r ac. ac. _(1,S`r~ S' °1° 3 fps ~' in ~r~ ft. S. ~y inJhc (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) (the soil layer down to 4 feet) U~~,d.-~.: ~ in.mr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional infom~ation and will substantially delay final review and approval of the project. Aoolicants Initials ihd~Gi~ No vertical sand bed is proposed h9,Cdui The bioretention area is at least 40 feet by 15 feet. _[~I,Cs'~~ Sheet flow is provided at inlet. ~J,BcJ Water table depth is greater than 6 feet. I1~,B u: Minimum of 6" ponding is provided. s~'/.B'-t) The ponded area wilt draw down in less than 4 days. ~.8~ Planting soil infiltration rate is greater than 0.52 in/hr. Glr~a~Cr~.^.~,.,, The in-situ soil infiltration rate is greater than 0.2 in/hr. /~1,c3 cJ A planting plan with species and densities is provided. ~B~+~ Mulch layer is specified in plans. ~,d~J Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) m,6~ y Plan details for the bioretention area provided. ~.B~c:J Plan details for the inlet and outlet are provided. inB ~=~ An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project No DNISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET PROJECT INFORMATION Project Name Contact Person: the following information): Phone Number. For projects with multiple basins, specify which basin this worksheet applies to: 't5 ,a <_~++ l ?! Permanent Pool Elevation %+~/s~ ft. (elevation of the orifice invert out) Temporary Pool Elevation 74g . ~~ ft. (elevation of the outlet structure invert in) Bioretention Surface Area drainage Area Impervious Area Rational C Coefficient Size I ~to9 sq. ft. b ."75 ac. ac. .`a (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate to-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST 3 fps ~ in ~ ~ ft. 5' . ~ y in./hr (the soil layer down to 4 feet) _LG.dCrd~-,~.r in.lhc (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. !f a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Aaolicants Initials /2J•B~.v No vertical sand bed is proposed ~i~ ; The bioretention area is at least 40 feet by 15 feet. rr~B~..~ Sheet flow is provided at inlet. ,rvr,~c~1 Water table depth is greater than 6 feet. /hB~ ~ Minimum of 6" ponding is provided. /Y~fl:.c~ The ponded area will draw down in less than 4 days. /N.BcV Planting soil infiltration rate is greater than 0.52 in/hr. . f lnrlrr~rA, ~ The in-situ soil infiltration rate is greater than 0.2 in/hr. ~,~~v A planting plan with species and densities is provided. /1~BUJ Mulch layer is specified in plans. s,~Bw Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) ~B~~ Plan details for the bioretention area provided. ~i,®~~ Plan details for the inlet and outlet are provided. An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project DNISION OF WATER QUALITY - BIORETENTtON AREA WORKSHEET PROJECT INFdRMATION (please complete the following information): Project Name : ~i . s-/ .:. ~s Contact Person: s~l.~cf~•Y. c./ (izi~s~«• ~ Phone Number. (.~~) ~/Z :3s~/G For projects with multiple basins, specify which basin this worksheet applies to: B~ o «i/ / Permanent Pool Elevation Temporary Pool Elevation Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST ~/,~+ ft. (elevation of the orifice invert out) '7 ~~1- 5~ ft. (elevation of the outlet structure invert in) 1 ~b~ sq. ft. o .~- ac. (on-site and off-site drainage to the basin) ac. (on-site and off-site drainage to the basin) C~i`8'f+ 5' % (either 5°!° in w/sand under drain or 7% in w/o) ~ fps i in 7 ~ ft. S. Coy/ in.ihr. (the soil layer down to 4 feet) ,~~A«<~r~ ~.. in.lhr. (the soil layer below 4 feet or below the sand bed} Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. tf a requirement has not been met, aftach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantial{y delay final review and approval of the project. Aaolicants Initials /h.~r.J No vertical sand bed is proposed ~y~,c7 The bioretention area is at feast 40 feet by 15 feet. vr~~J Sheet flow is provided at inlet. ~Bz^-~ Water table depth is greater than 6 feet. ~.,~ u7 Minimum of 6" ponding is provided. i~Bo•~ The ponded area will draw down in less than 4 days. _~,~ci Planting soil infiltration rate is greater than 0.52 inlhr. .an ,~~rc.,~ The in-situ soil infiltration rate is greater than 0.2 inihr. ~i,~.; A planting plan with species and densities is provided. ~~~ Mulch layer is speafied in plans. ,~r„9~~1 Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) ,~8~ Plan details far the bioretention area provided. /H+Bt.s~ Plan details for the inlet and outlet are provided. ~,~ v An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET PROJECT INFQRMATION Project Name complete the following information): Contact Person: ~1.°c~i~ e./ (iZi~-sf«•~,/ Phone Number. (.~U) ~/Z :3s~i~ For projects with multiple basins, specify which basin this worksheet applies to: ~•e ~•c i/ 2 ~'+ Permanent Pool Elevation Temporary Pool Elevation Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST ,~1/ f~ tt. 77Z. LAS tt. 12 ~i sq. ft. b .'7 i ac. ac. C~, S~ S' 3 fps 5 in ~ ~ ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) {on-site and off-site drainage to the basin} (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) ~+ S ~ G- y in./hr. (the soil layer down to 4 feet) ~~~Q~~ ~~ :,. in.lhr. (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials .~~~~ No vertical sand bed is proposed ~1lc .7 The bioretention area is at least 40 feet by 15 feet. r~6..~ Sheet flow is provided at inlet. ~n.~,J Water table depth is greater than 6 feet. .~.El~y Minimum of 6" ponding is provided. /~~y The ponded area will draw down in less than 4 days. ~~u~ Planting soil infiltration rate is greater than 0.52 inlhr. Gf.JO~~ c/r1+.., The in-situ soil infiltration rate is greater than 0.2 in/hr. ~i.~i~:rJ A planting plan with species and densities is provided. .~~ Mu1ch layer is speafied in plans. n~.6u.-~ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) /yi4ccl Plan details for the bioretention area provided. ,yla ~ v Plan details for the inlet and outlet are provided. ,a~ ©~*~ An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains DWQ Project No. 01 ' O l0 2 ~ DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET PROJECT INFtSRMATION (please complete the following information}: Project Name : _~Li~.y,~ry%<.:. f~~ ~~ Contact Person: /7~1.'cfr.: e-/ ~iZ;~s~«•,~/ Phone Number. I.~.~U) ,~/2 ~.3s'~%G For projects with multiple basins, specify which basin this worksheet applies to: ~ ac~i/ zi Permanent Pool Elevation Temporary Pool Elevation N/~ ft. °~E,r'9.7, ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size Inlet Velocity Inlet flow depth Depth to Ground Water Planting Soil Infiltration Rate In-Situ Soil Infiltration Rate REQUIRED ITEMS CHECKLIST LZS~ sq. ft. t . 2(o ac. ac. c~. ~ 3 fps in (e ft. in./hr. (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) (the soil layer down to 4 feet) (~.,~~ar~-~: ~ in.lhr. (the soil layer below 4 feet or below the sand bed} Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stomtwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substanfially delay final review and approval of the project. Applicants Initials /y>.~'~:~ No vertical sand bed is proposed r~ec v The bioretention area is at least 40 feet by 15 feet. ~l3cc~ Sheet flow is provided at inlet. mt3'~ ~ Water table depth is greater than 6 feet. ~~ Minimum of 6" ponding is provided. ,~.a~~ The ponded area will draw down in less than 4 days. .~~~:.~ Planting soil infiltration rate is greater than 0.52 inlhr. G/h~/~.-.~r,~,, „ The in-situ soil infiltration rate is greater than 0.2 in/hr. ~c~-:~ A planting plan with species and densities is provided. ~,,a~v Mulch layer is specified in plans. rrr~uJ Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) ,,,1~~y Plan details for the bioretention area provided. .~8~ Plan details for the inlet and outlet an: provided. ~~.c. An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains