Loading...
HomeMy WebLinkAbout20211573 Ver 1_Shoreline Stabilization_20211101111M1111"111111111M111"1111711"1111112 `" S ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality pfil State of North Carolina Department of Environment Quality Division of Water Resources 1.5A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service if sending via delivery service (UPS, FedEx, etc.) Paul Wojoski Paul Wojoski DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request to this application. Date of Pre -filing Meeting Request: q / / / -?C)-1 (required) DWR ID # Version (if applicable) A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Karl & Joyce Milliren Mailing Address: 6862 Colonial Club Drive Thomasville, NC 27360 Telephone Number: 336/880-0252 Fax Number: E-mail Address: petvetkm303@cs.com RECEIVED NOV - 1 2021 DEQ-WATER RESOURCES 401 & BUFFER PERMITTING : D_E North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh. North Carolina 27699-1617 919.707.9000 • 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)) 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Davidson Nearest Town: Lexington Lake/ river/ ocean adjacent to property: High Rock Lake Property size (acres): 1.46 acres Subdivision name or site address (include phase/lot number): Lot 12, Yachtsman Point, 1206 Scout Rd., Lexington Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Lexington exit for NC Hwy 8, go south on NC Hwy 8, L on Wildlife Recreation Area Access Rd., straight onto Scout Road, property is on right, #1206. Latitude (in decimal degrees) 35.41.0508 Longitude (decimal degrees) 80.18.3780 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): house under construction in residential subdivision FORM: SSGP 09-2020 Page 2 of 6 1 6. Describe proposed work (Includediscussion as to how hardening ofshoreline has been avoided, or why it is necessary): Tostabillze an eroding shoreline andprotect it from further erosion. 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts belowthe normal pool Take level J Nor mai Water Level Permanent Impacts (including all excavation; backfill, rip rap, retaining walls, etc.) in square feet: 920 SF Temporary impacts:in:square feet: None 9. Total amount of impacts above the norrttal poai lake level / Normal. Water Level and 50 feet land -ward Permanent Impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 960 SF Temporary impacts (temporary clearing, construction corridor) in square feet: 800 SF 10. Please describe the.vegetation above the normal pool lake:levelf Normal Water Level and 50 feet landward to be impacted (number -of trees, for instance): There are.15 to 20 existing trees -located on the shoreline that will be removed to accommodate: the proposedshoreline stabilization: 11. Signature By signing below, 1, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • Theproject.proponent hereby requests that the.certifying authority .review and take action: On thls CWA 401 certi€itatlonrequest within the applicable reasonable period of time �wner(Agent`s Signature' [15A NCAC O2.H .05020 Date •Agerlt'3slgnature is volldonly if an authorization letter from the ownerfs provided. 12. Please: approximately sketch the following information on this plasm and provide dimensions for each Item:. a. All proposed vegetation clearing FORM: SSGP 09-2020 Page 3 of 6 b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level Min NM Shoreline Plan View UM MIMI Y;a FORM: SSGP 09-2020 Page 4 of 6 Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level aar"1 r1rrr Shorea�nlie 2 ft.1150 ft. additional cleating ' if necessary Lake (At Full Pond/ Normal Water Level) a= s ivies row • inn Riprap 'ipi 4.00::ram '.XXtalri Existing Dock J 30ft 17 ft 3 ft 1150 ft Below full pond/ NWL 4 ft 150ft Above full pond/ NWL E AMPLE Plan View FORM: SSGP 09-2020 Page 5 of 6 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing 'If necessary 10 ft. bank height Existing bank •• ,, j,7AM,"A M P L E •r FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Karl & Joyce Milliren Lot 12 Yachtsman Point STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 160 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope =160'x1'x2 = 320 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 160 LF of Shoreline = 3 ft. Above Normal Pool Area of Impact = Length x Height x Slope = 160'x3'x2 = 960 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 160 x 5 ft. = 800 sq. ft. Total Area of Impact Above Normal Pool Level = 1760 sq. ft. ---,,) A0 /lb- 9 --, / u.) /./ 1 cO- 0,9 '.99NNN. CLASS 2 RIP RAP VEGETATION AND EROSION CONTROL FABRIC • •P 1 EROSION CONTROL FABRIC' TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE EXISTING GRADE 2 p_ I \/44.' \ \�i"..•t , Approx. 3 ft. Assume 1 ft. LAKE BOTTOM _ — FOR: LOCATION: RESERVOIR: KARL & JOYCE MILLIREN LOT 12, YACHTSMAN POINT HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: MODERATE RIP RAP STABILIZATION DETAIL 3 DWR Pre -Filing Meeting Request Form Contact Name* Karen Baldwin, Agent for Karl and Joyce Milliren Contact Email Address * karen.baldwin@eaglecreekre.com Project Owner* Eagle Creek Renewable Energy Project Name* High Rock Reservoir Project County * Davidson Owner Address: * Street Address 6862 Colonial Club Drive Address Line 2 City State / Province / Region Thomasville NORTH CAROLINA Postal / Zip Code Country 27360 United States Is this a transportation project? * Yes Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Individual Permit Shoreline Stabilization Does this project have an existing project ID#?* Yes No NCkTN CAROLINA Eneronmentol Quality 401 Water Quality Certification - Express Modification Do you know the name of the staff member you would like to request a meeting with? N/A Please give a brief project description below and include location information. * Shoreline Stabilization in accordance with Cube Hydro Shoreline Management Plan Guidelines By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. https://edocs.deq.nc.gov/Forms/Form/Submit 1/2 • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature* Submittal Date 9/15/2021 https://edocs.deq.nc.gov/Forms/Form/Submit 2/2 DWR Pre -Filing Meeting Request Form Contact Name * Contact Email Address* Project Owner* Project Name* Project County* Owner Address:* Is this a transportation project?* Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - Regular r Individual Permit rJ Shoreline Stabilization Does this project have an existing project ID#?* r Yes ( No Karen Baldwin, Agent for Karl and Joyce Milliren karen.baldwin@eaglecreekre.com Eagle Creek Renewable Energy High Rock Reservoir Davidson Street Address 6862 Colonial Club Drive Address Line 2 City Thomasville Fbstal / Zip Code 27360 r Yes r No r" 401 Water Quality Certification - Express r Modification State / Bovine / Dion NORTH CAROLINA Country United States Do you know the name of the staff member you would like to request a meeting with? N/A Please give a brief project description below and include location information.* Shoreline Stabilization in accordance with Cube Hydro Shoreline Management Plan Guidelines By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Submittal Date G04 rgle-Maps 1206 Scout Rd A+ Autor• otire Board a Batten Brenta QFeeds;nu;.t.. Certer UN . Ecar ct 9 Go gle Q Larry Carris (; ConstrJeci Map data ©2021 1000 ft r https://www.google.com/maps/place/1206+Scout+Rd,+Salisbury,+NC+28146/@35.6459811,-80.2626436,15z/data=!4m5!3m411 s0x88538591 a3d 17cb... 1/1