Loading...
HomeMy WebLinkAbout20191674 Ver 1_Draft Mitigation Plan IRT Comments_20210427Strickland, Bev From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Tuesday, April 27, 2021 11:01 AM To: Leslie, Andrea J; Youngman, Holland J; Davis, Erin B; Bowers, Todd; Wilson, Travis W.; Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haywood, Casey M CIV (USA) Subject: [External] FW: SAW-2018-00707 RS French Broad UMB - Blue Star Congen Mitigation Site Draft Mitigation Plan IRT Comments Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> FYI... Original Message From: Ray Holz <rholz@restorationsystems.com> Sent: Tuesday, April 27, 2021 8:40 AM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Subject: [Non-DoD Source] RE: SAW-2018-00707 RS French Broad UMB - Blue Star Congen Mitigation Site Draft Mitigation Plan IRT Comments Steve - After internal conversations and a discussion with the Camp owners, Restoration Systems has decided to terminate the permitting of the Blue Star ConGen Mitigation Site. If additional notice is required, please let me know. Thank you for your time and effort over the last several years. Restoration Systems plans to locate and begin permitting another stream bank in the French Broad 05 shortly, and I look forward to working with you on our next project. Please do not hesitate to give me a call if we need to discuss this further. Sincerely, Raymond H. Raymond J. Holz 1 Restoration Systems, LLC 1101 Haynes St. Suite 211 1 Raleigh, NC 27604 tel: 919.334.9122 1 cell: 919.604.9314 1 fax: 919.755.9492 email: rholz@restorationsystems.com Original Message From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> i Sent: Thursday, March 25, 2021 11:38 AM To: Ray Holz <rholz@restorationsystems.com> Subject: RE: SAW-2018-00707 RS French Broad UMB - Blue Star Congen Mitigation Site Draft Mitigation Plan IRT Comments All IRT comments were provided verbally during our joint webex discussion or via our IRT only discussion right after the webex which was summarized in my email below. In my March 9, 2021 email I did ask for IRT members to comment with any additional information/corrections they felt relevant. I received an email from DWR in support of my March 9, 2021 email to you (see attached). If this leaves unknowns and you would like to discuss further or wish me to seek additional IRT affirmation/comments to my email summary before RS makes any big decisions, let me know. If you do wish to hear from the rest of the IRT please elaborate as to what issues are most important for you to get clarification. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 (828)-933-8032 cell The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 to complete the survey online. Original Message From: Ray Holz <rholz@restorationsystems.com> Sent: Thursday, March 25, 2021 9:49 AM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Subject: [Non-DoD Source] RE: SAW-2018-00707 RS French Broad UMB - Blue Star Congen Mitigation Site Draft Mitigation Plan IRT Comments Steve - Has another IRT member provided comments? Thanks, RH Raymond J. Holz 1 Restoration Systems, LLC 1101 Haynes St. Suite 211 1 Raleigh, NC 27604 tel: 919.334.9122 1 cell: 919.604.9314 1 fax: 919.755.9492 email: rholz@restorationsystems.com 2 Original Message From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Tuesday, March 09, 2021 1:38 PM To: Ray Holz <rholz@restorationsystems.com> Cc: Tugwell, Todd J CIV USARMY CESAW (USA)<Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Andrea Leslie (Andrea.Leslie@ncwildlife.org) <Andrea.Leslie@ncwildlife.org>; travis.wilson@ncwildlife.org; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; Youngman, Holland J <holland_youngman@fws.gov> Subject: RE: SAW-2018-00707 RS French Broad UMB - Blue Star Congen Mitigation Site Draft Mitigation Plan IRT Comments Raymond, Per your request, I wanted to follow up our conversations regarding the Blue Star Congen Mitigation Site with some written comments. On Friday, January 22, 2021, several IRT members and representatives from Restoration Systems (RS) had a virtual meeting to discuss IRT comments to the Blue Star Congen Draft Mitigation Plan and RS's preliminary response to those IRT comments. The RS preliminary response included a proposed revised project conservation easement (CE) figure and a proposed revised design figure for the project area within the previous impoundment. The preliminary responses RS provided and the IRT discussion focused mainly on design options to reduce the wetland loss within the impoundment, the proposed revised buffer widths, the road/trail network within and around the proposed revised project and credit ratios associated with the proposed revised project. Over 60% of the stream linear footage associated with this site proposal is preservation. While the IRT has accepted such a high preservation proposal based on several important factors that RS has detailed in its proposal, preservation does not provide functional uplift and therefore it is important to minimize potential risks to that function being preserved. During the virtual meeting and a short IRT only meeting afterwards IRT members were receptive to the proposed wider buffers, however expressed continued concern for the road/trail network proposed within, crossing multiple times and adjacent to the CE. The IRT believes the reduction of trails/roads within and crossing of the project CE are an important companion to the proposed wider buffers for site viability. The IRT also believes that the 7.5:1 preservation ratio is not appropriate based on the continued level of risk and a higher ratio (maybe 10:1 or higher) would be more appropriate, depending on what the final proposal includes. Additional IRT comments are welcome if there is anything you feel I missed. We know that RS has to determine what makes sense from a project viability standpoint based on these comments. Let me know if further discussion is needed. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 3 (828)-933-8032 cell The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 to complete the survey online. Original Message From: Ray Holz <rholz@restorationsystems.com> Sent: Tuesday, January 5, 2021 2:22 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Subject: [Non-DoD Source] FW: SAW-2018-00707 RS French Broad UMB - Blue Star Congen Mitigation Site Draft Mitigation Plan IRT Comments Raymond J. Holz 1 Restoration Systems, LLC 1101 Haynes St. Suite 211 1 Raleigh, NC 27604 tel: 919.334.9122 1 cell: 919.604.9314 1 fax: 919.755.9492 email: rholz@restorationsystems.com Original Message From: Ray Holz Sent: Wednesday, November 11, 2020 3:41 PM To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Cc: Grant Lewis (glewis@axiomenvironmental.org) <glewis@axiomenvironmental.org>; Wes Newell <WNewell@ restorationsystems.com> Subject: RE: SAW-2018-00707 RS French Broad UMB - Blue Star Congen Mitigation Site Draft Mitigation Plan IRT Comments Steve - I am attaching RS' response to IRT comments from CBS' Draft Mitigation Plan. Our response includes a few figures to aid in our response regarding the easement size/stream preservation ratio and the wetlands behind the dam post -restoration. I hope we can find some time between now and the end of the year to schedule a virtual IRT meeting to discuss the project and our revised approach in greater detail. Please let me know if you have any questions and what steps I can take to facilitate a virtual meeting with the other IRT members. Best, Raymond H. Raymond J. Holz 1 Restoration Systems, LLC 1101 Haynes St. Suite 211 1 Raleigh, NC 27604 tel: 919.334.9122 1 cell: 919.604.9314 1 fax: 919.755.9492 email: rholz@restorationsystems.com 4 Original Message From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Monday, June 29, 2020 11:30 AM To: Ray Holz <rholz@restorationsystems.com> Cc: Tugwell, Todd J CIV USARMY CESAW (USA)<Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; Andrea Leslie (Andrea.Leslie@ncwildlife.org) <Andrea.Leslie@ncwildlife.org>; Gledhill-earley, Renee <renee.gledhill- earley@ncdcr.gov>; byron_hamstead@fws.gov; Jones, M Scott (Scott) CIV USARMY CESAW (USA) <Scott.Jones@usace.army.mil> Subject: SAW-2018-00707 RS French Broad UMB - Blue Star Congen Mitigation Site Draft Mitigation Plan IRT Comments Raymond, Attached are the RS French Broad UMB - Blue Star Congen Mitigation Site (SAW-2018-00707) Draft Mitigation Plan IRT comments. You may proceed with developing the final mitigation plan for the Blue Star Congen Site provided you adequately address all comments/concerns in the enclosed memo. Please ensure that each member of the IRT is provided a copy of the comment response and Final Mitigation Plan. In addition, please submit your Nationwide Permit 27 application with the submittal of the final plan, for review and approval prior to discharging fill material into waters of the United States. Feel free to contact me with questions as you preparing the final plan submittal. This electronic copy is your official Department of the Army Notification; no paper copy will be mailed, unless specifically requested. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 to complete the survey online. 5