Loading...
HomeMy WebLinkAbout20060961 Ver 1_Emails_20070717DWQ 06-0961 40 Wade Subject: DWQ 06-0961 40 Wade From: Cynthia F Van Der Wiele <cynthia.vanderwiele@ncmail.net> Date: Tue, 17 Ju12007 15:28:36 -0400 To: Ian McMillan <Ian.McMillan@ncmail.net>, Annette Lucas <Annette.Lucas@ncmail.net> OK! I've finally gotten to this one. It's been busy. Worksheets check out. However, there are issues with the construction plans. Bioretention (construction sheet 6): Soil specifications were not included. Depth of soil material was not specified. Extended Detention Wetland (construction sheet 7) The plant list does not match the wording of the planting key. It is unclear where the "Plant List-- Sedge Community" would be planted. The labeling should be consistent so that a landscape contractor would know what to plant and where. Woody plant material (trees, shrubs) were not included in the planting plan list. Also, Hemerocallis Stella D'Oro is non-native plant; natives are preferred. Please refer to Table 12.1 of the NC DENR Stormwater BMP Manual. 1 of 1 7/17/2007 4:05 PM