HomeMy WebLinkAbout20060961 Ver 1_Triage Check List_20060706Triage Check List
Date: ~ ~ ~ ~' Project Name: ~
DWQ#: ~P ~` ~~(o I
County: ~(~.
To: ^ ARO Kevin Barnett ^ WaRO Kyle Barnes
^ FRO Ken Averitte ^ WiRO Noelle Lutheran/Joanne Steenhuis
^ MRO Alan Johnson/Barry Love ^ WSRO Daryl Lamb
~. RRO Eric Kulz
From: Telephone : (919) ~~3 / 6 ~~
The file attached is being forwarded to your for your evaluation..
Please call if you need assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
^ Minimization/avoidance issues
Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
Comments: i
Z ~~~~