Loading...
HomeMy WebLinkAbout20130941 Ver 1_More Info Letter_20131010NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor October 10, 2013 Carolyn Banks, Trustee 717 Dillingham Road Barnardsville, NC 28709 Division of Water Resources Water Quality Programs Thomas A. Reeder Director Subject: Request for More Information 401 Water Quality Certification Haw Branch Restoration DWQ Project # 2013 -0941 Buncombe County Response deadline: November 10, 2013 Dear Ms. Banks: John E. Skvada, ill Secretary The Division of Water Resources (DWR) has performed a preliminary review of a 401 Water Quality Certification application submitted for the above referenced property. Additional information will be required in order to complete the review process. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Provide reference reach data, including appropriate measurements, dimensionless ratios, and pebble count information, which support the project design. 2. Provide longitudinal profile of existing/modified channels. 3. Provide proposed longitudinal profile of the existing stream with overlay. 4. Justify stone sizing regarding constructed riffles. 5. Explain who will oversee the construction process. 6. Provide a monitoring plan for the restored reach, including the stability of the channel and the success criteria for plants. Please provide your response in writing to the addresses below prior to November 10, 2013. Four copies of the required information should be provided to the Wetlands, Buffers, Stormwater Compliance and Permitting Unit at: WATER QUALITY SECTION North Carolina Division of Water Resources — Asheville Regional office 2090 U.S Highway 70, Swannanoa, N.C. 28778 Phone (828) 2964500 FAX (828) 299 -7043 Internet h2oenrstate.nc.us An Equal opportunity /Affirmative Action Employer Carolyn Banks, Trustee October 10, 2013 Page 2 of 2 Ms. Karen Higgins WBSCP Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 and a single copy to the Asheville Regional Office at: Tim Fog Water Quality Programs 2090 US HWY 70 Swannanoa, NC 28778 If we do not hear from you by the deadline, we will assume that you no longer want to pursue this project and we will consider the project withdrawn. This letter only addresses the preliminary application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWR. Please call Tim Fox (828) 296 -4664, if you have any questions. Sincerely, G. Landon Davidson, P.G. Regional Supervisor Water Quality Programs cc: Tasha McCormick - US Army Corps of Engineers Asheville Field Office David McHenry - North Carolina Wildlife Resources Commission Mike Lovoy, P.E. Karen Higgins - WBSCP Unit Doug Sharp — Buncombe County Erosion Control ARO File copy G:\ WQ \SWP\Buncombe4401s\Non- DOT\Soott Banks Dillingham road\ADDINFO 2013 -Ml Haw Branch 9- 30- 13.docx