HomeMy WebLinkAbout20130941 Ver 1_More Info Letter_20131010NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
October 10, 2013
Carolyn Banks, Trustee
717 Dillingham Road
Barnardsville, NC 28709
Division of Water Resources
Water Quality Programs
Thomas A. Reeder
Director
Subject: Request for More Information
401 Water Quality Certification
Haw Branch Restoration
DWQ Project # 2013 -0941
Buncombe County
Response deadline: November 10, 2013
Dear Ms. Banks:
John E. Skvada, ill
Secretary
The Division of Water Resources (DWR) has performed a preliminary review of a 401 Water
Quality Certification application submitted for the above referenced property. Additional
information will be required in order to complete the review process.
Please provide the following information so that we may continue to review your project.
Additional Information Requested:
1. Provide reference reach data, including appropriate measurements, dimensionless
ratios, and pebble count information, which support the project design.
2. Provide longitudinal profile of existing/modified channels.
3. Provide proposed longitudinal profile of the existing stream with overlay.
4. Justify stone sizing regarding constructed riffles.
5. Explain who will oversee the construction process.
6. Provide a monitoring plan for the restored reach, including the stability of the
channel and the success criteria for plants.
Please provide your response in writing to the addresses below prior to November 10, 2013.
Four copies of the required information should be provided to the Wetlands, Buffers, Stormwater
Compliance and Permitting Unit at:
WATER QUALITY SECTION
North Carolina Division of Water Resources — Asheville Regional office
2090 U.S Highway 70, Swannanoa, N.C. 28778
Phone (828) 2964500
FAX (828) 299 -7043
Internet h2oenrstate.nc.us
An Equal opportunity /Affirmative Action Employer
Carolyn Banks, Trustee
October 10, 2013
Page 2 of 2
Ms. Karen Higgins
WBSCP Unit
1650 Mail Service Center
Raleigh, NC 27699 -1650
and a single copy to the Asheville Regional Office at:
Tim Fog
Water Quality Programs
2090 US HWY 70
Swannanoa, NC 28778
If we do not hear from you by the deadline, we will assume that you no longer want to pursue
this project and we will consider the project withdrawn.
This letter only addresses the preliminary application review and does not authorize any impacts
to wetlands, waters or protected buffers. Please be aware that any impacts requested within your
application are not authorized (at this time) by the DWR. Please call Tim Fox (828) 296 -4664,
if you have any questions.
Sincerely,
G. Landon Davidson, P.G.
Regional Supervisor
Water Quality Programs
cc: Tasha McCormick - US Army Corps of Engineers Asheville Field Office
David McHenry - North Carolina Wildlife Resources Commission
Mike Lovoy, P.E.
Karen Higgins - WBSCP Unit
Doug Sharp — Buncombe County Erosion Control
ARO File copy
G:\ WQ \SWP\Buncombe4401s\Non- DOT\Soott Banks Dillingham road\ADDINFO 2013 -Ml Haw Branch 9- 30- 13.docx