HomeMy WebLinkAbout20211570 Ver 1_Meeting Request Review Doc Attachment_20211026(Version 2.06; Released June 2016)
17.BP.11.C.4 TIP No.:SF-852266 County(ies):Surry Page 1 of 1
TIP Number:Date:
Phone:Phone:
Email:Email:
County(ies):
CAMA County?
No
Design/Future:Year:2013 Existing:Year:
Aquatic T&E Species?No Comments:
No N/A
N/A
(If yes, provide justification in the General Project Narrative)
Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?N/A
Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
Annual Avg Daily Traffic (veh/hr/day):
Existing Site
Project Length (lin. miles or feet):
ac.
Surface Water Body (1):
Water Supply IV (WS-IV)NCDWR Surface Water Classification for Water Body
ac.
Waterbody Information
2013
NCDWR Stream Index No.:
NRTR Stream ID:
2-lanes at 8'-0" each with 2'-0" to 3'-0" shoulder
2000
This project replaces existing Culvert #852266, (1) @ 72" CMP with headwall, approxately 106' long. The proposed culvert will be 78" RCP with headwall, approximately 144'
long. The invert will be buried 1'. The channel will be 6' wide with banks lined with rip rap 45' upstream and 26' downstream. There is a slight increase in the impervious area of
the project, however there is no significant increase in the discharge from the roadway runoff.
N/ABuffer Rules in Effect:
None
2000
General Project Information
SF-85226617.BP.11.C.4
190 ft.
Project Description
Impairments:
Other Stream Classification:
Primary Classification:
Project Built-Upon Area (ac.)
Unnamed Tributary to Lovills Creek 12-72-8-(1)
0.1
WBS Element:
Bridge ReplacementWBS Element:
NCDOT Contact:Contractor / Designer:
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
Project Type:
Address:
9/19/2016
SurryMount Airy
Address:
River Basin(s):
ccavalier@rkk.com
City/Town:
0.1
Typical Cross Section Description:
Surrounding Land Use:
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
No
Golf course and low density residential.
Proposed Project
Yadkin-Pee Dee
None
Supplemental Classification:
2-lanes at 10' each with 6'-0" shoulder
None
Wetlands within Project Limits?
900 Ridgefield Drive
RK&K Engineers - Corey Cavalier, PE
Suite 350
Raleigh, NC 27609
919.878.9560
1590 Mail Service Center
919.707.6751
mshown@ncdot.gov
Marc Shown, PE
Raleigh, NC 27699-1590
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) -L- 13+47 LTTemp. Dewatering Upstream 5 -L- 13+05 LT Channel Tie-In Upstream 49 (Fill in Existing Channel) -L- 12+97 LT Replace existing 72" CMP w/ 14 78" RCP Upstream (Not Buried) -L- 12+08 RT Replace existing 72" CMP w/ 25 78" RCP Downstream (Buried 1') -L- 11+87 RT Riprap on Banks Downstream 26 -L- 11+67 RTTemp. Dewatering Downstream 10 -L- 11+62 RT 12" Water line relocation 6 -L- 11+27 RT8" Sanitary Sewer line relocation 39 TOTALS*: 114 60 0*Rounded totals are sum of actual impactsNOTES:Revised September 2014 SHEET 1OF 3 WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSSurry CountySF-85226617.BP.11.C.4NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSNovember 15, 2016Existing pipe is 106 LF with a slope of 1.13%Proposed pipe is 144 LF with a slope of 2.72%Inlet of proposed pipe is not buried. Outlet of proposed pipe is buried 1' deep with a 1' tall sill.
GRVAR. SOIL
MULCH PILE
EIP
EIP
EIP
EIP
GR
72" CMP
GREENHILL RD. S.R. 1701
TO
CANA TO SALEM
36
" WW 48" WW24" CMP8" DIP
8" DIP
8" DIP8" P
VC8"
P
V
C
8" PVC
8" PVC
8" PVC
FULL OF WATER
60.00’60.00’
EXISTING R/W
EXISTING R/W
EX
IST
ING
R
/W
EX
IST
ING
R
/W
WOODS
STONE HW
60" WW
T
T
12" DI
12" D
I
A
T
T
A
C
H
E
D
N
O
U
T
IL
IT
IE
S
W/LT25.00’
2
5.
0
0
’25.00’25.00’2
5.0
0’
25.00’
HEAD
POSSIBLE SPRING
25’ SEWER EASEMENT
25’ SEWER EASEMENT
18’ PAVED ROADWAY
DB 743 PG 188EASEMENT25’ SEWER WOODS
WOODS
WOODS
WD BRIDGE
WOODS
BOLLARD
WD
BOLLARD
WD
(DILAPIDATED)
SILT FENCE
WOODS
GOLF COURSE
WOODS
AKA E. D. BRAY III
DEAN BRAY III
BROWNFIELD
SUSANNE M
WOLTZ INVESTMENT LLC EMW GREENHILL LLC
BLACKMON JONES
AKA TANYA
TANYA JACKSON
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
.04+87.50INC
18.33’.05.0520’P.S.3’P.S.3’EXISTEXISTGUARDRAIL
TIE TO EXISTING
GUARDRAIL
TIE TO EXISTING +62.4550:1
50:150:1
+66.85.06.06.06.06.05GUARDRAIL
TIE TO EXISTING
INC
18.33’
852266-2
-L- STA. 10+83.48 OFFSET = 13.7520’ RT
EL = 1070.77’
RR SPIKE IN 20" POPLAR TREE
-L-
-L-
-L- STA. 13+85.00
END PROJECT 852266
-L- STA. 11+60.00
BEGIN PROJECT 852266
GRAU TL-2
-L- POT Sta. 10+00.00
-L- PC Sta. 10+62.75
-L- PC Sta. 14+32.74
-L- PC Sta. 14+68.13
-L- PC Sta. 14+69.23
PI Sta 12+49.04 PI Sta 15+18.71
V = 40mph
HW
REMOVE
(SHT. 2B?)
SEE DETAIL
W/ SILL
HW
78" RCP-III
DETAIL
IMPROVEMENTS
SEE INLET CHANNEL
DETAIL
IMPROVEMENTS
SEE OUTLET CHANNEL
F
F
F
F
F
F
F
HWNAD 83 (NSRS 2007)8/17/9911/15/2016R:\Hydraulics\PERMITS_Environmental\Drawings\852266_Hyd_psh_noCon.dgneriggs ALLOWING FOR CONSTRUCTION OF 18’ PROPOSED PAVEMENT.*WHERE PROPOSED PAVEMENT OVERLAPS EXISTING PAVEMENT USED AS DETOUR, A TEMPORARY FILL SLOPE WILL BE CONSTRUCTED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
0
0
0
PROFILE (HORIZONTAL)
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
0
00
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
RDY-1
60
60
30
3030
30
1266
852266
11+00 12+00 13+00 14+00
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
1,070
1,080
1,090
2,000
2,010
SURRY #266
ADT = 2,000 (2013)
DESIGN SPEED = 40 MPH
1,070
1,080
1,090
2,000
2,010
WETLAND AND SURFACE WATER IMPACTS PERMIT
WATER IMPACTS
TEMPORARY SURFACE
WATER IMPACTS
PERMANENT SURFACE
WATER IMPACTS
TEMPORARY SURFACE
WATER IMPACTS
PERMANENT SURFACE
1"=30’
SCALE
1"=30’
SCALE
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
WATER IMPACTS
TEMPORARY SURFACE
EL = 1,082.32’
-L- STA. 11+60.00
BEGIN GRADE
EL = 1,094.55’
-L- STA. 13+85.00
END GRADE
V = 35mph
STR #852266 Sta. 12+40.5 -L-
DESIGN FREQUENCY
DESIGN DISCHARGE
100 YEAR FREQUENCY YRS
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
= 1080.18
NORMAL WATER SURFACE ELEV = 1072.8 FT
= 290
= 340
= 100
= 25
= 1079.2
= 380
= 100+
DATE OF SURVEY = 3/2016
= 1081.16
EX. 72" CMP
PI = 12+70.00
EL = 1,085.78’
(+)3.1508%
(+)7.6270%
VC = 220’
K = 49
78" RCP-III
PIPE HYDRAULIC DATA
1070
10701070
1075
1075
1075
107510751075
1080
1080
1080
108010801080108010801080 108510851085108510851085
1085
10901090109010901090
10951095
10951095
1100110011001100
110511051
1
0
5
1105
11101110
111510701070
1075
10
8
0
107510801085GRVAR. SOIL
MULCH PILE
EIP
EIP
EIP
EIP
GR
72" CMP
GREENHILL RD. S.R. 1701
TO
CANA TO SALEM
36
" WW 48" WW24" CMP8" DIP
8" DIP
8" DIP8" P
VC8"
P
V
C
8" PVC
8" PVC
8" PVC
FULL OF WATER
60.00’60.00’
EXISTING R/W
EXISTING R/W
EX
IST
ING
R
/W
EX
IST
ING
R
/W
WOODS
STONE HW
60" WW
T
T
12" DI
12" D
I
A
T
T
A
C
H
E
D
N
O
U
T
IL
IT
IE
S
W/LT25.00’
2
5.
0
0
’25.00’25.00’2
5.0
0’
25.00’
HEAD
POSSIBLE SPRING
25’ SEWER EASEMENT
25’ SEWER EASEMENT
18’ PAVED ROADWAY
DB 743 PG 188EASEMENT25’ SEWER WOODS
WOODS
WOODS
WD BRIDGE
WOODS
BOLLARD
WD
BOLLARD
WD
(DILAPIDATED)
SILT FENCE
WOODS
GOLF COURSE
WOODS
AKA E. D. BRAY III
DEAN BRAY III
BROWNFIELD
SUSANNE M
WOLTZ INVESTMENT LLC EMW GREENHILL LLC
BLACKMON JONES
AKA TANYA
TANYA JACKSON
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
.04+87.50INC
18.33’.05.0520’P.S.3’P.S.3’EXISTEXISTGUARDRAIL
TIE TO EXISTING
GUARDRAIL
TIE TO EXISTING +62.4550:1
50:150:1
+66.85.06.06.06.06.05GUARDRAIL
TIE TO EXISTING
INC
18.33’
852266-2
-L- STA. 10+83.48 OFFSET = 13.7520’ RT
EL = 1070.77’
RR SPIKE IN 20" POPLAR TREE
-L-
-L-
-L- STA. 13+85.00
END PROJECT 852266
-L- STA. 11+60.00
BEGIN PROJECT 852266
GRAU TL-2
-L- POT Sta. 10+00.00
-L- PC Sta. 10+62.75
-L- PC Sta. 14+32.74
-L- PC Sta. 14+68.13
-L- PC Sta. 14+69.23
PI Sta 12+49.04 PI Sta 15+18.71
V = 40mph
HW
REMOVE
(SHT. 2B?)
SEE DETAIL
W/ SILL
HW
78" RCP-III
DETAIL
IMPROVEMENTS
SEE INLET CHANNEL
DETAIL
IMPROVEMENTS
SEE OUTLET CHANNEL
F
F
F
F
F
F
60" WW
F
HWNAD 83 (NSRS 2007)8/17/9911/15/2016R:\Hydraulics\PERMITS_Environmental\Drawings\852266_Hyd_psh_Con.dgneriggs ALLOWING FOR CONSTRUCTION OF 18’ PROPOSED PAVEMENT.*WHERE PROPOSED PAVEMENT OVERLAPS EXISTING PAVEMENT USED AS DETOUR, A TEMPORARY FILL SLOPE WILL BE CONSTRUCTED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
0
0
0
PROFILE (HORIZONTAL)
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
0
00
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
RDY-1
60
60
30
3030
30
1266
852266
11+00 12+00 13+00 14+00
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
1,070
1,080
1,090
2,000
2,010
SURRY #266
ADT = 2,000 (2013)
DESIGN SPEED = 40 MPH
1,070
1,080
1,090
2,000
2,010
WETLAND AND SURFACE WATER IMPACTS PERMIT
WATER IMPACTS
TEMPORARY SURFACE
WATER IMPACTS
PERMANENT SURFACE
WATER IMPACTS
TEMPORARY SURFACE
WATER IMPACTS
PERMANENT SURFACE
1"=30’
SCALE
1"=30’
SCALE
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
WATER IMPACTS
TEMPORARY SURFACE
EL = 1,082.32’
-L- STA. 11+60.00
BEGIN GRADE
EL = 1,094.55’
-L- STA. 13+85.00
END GRADE
V = 35mph
STR #852266 Sta. 12+40.5 -L-
DESIGN FREQUENCY
DESIGN DISCHARGE
100 YEAR FREQUENCY YRS
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
= 1080.18
NORMAL WATER SURFACE ELEV = 1072.8 FT
= 290
= 340
= 100
= 25
= 1079.2
= 380
= 100+
DATE OF SURVEY = 3/2016
= 1081.16
EX. 72" CMP
PI = 12+70.00
EL = 1,085.78’
(+)3.1508%
(+)7.6270%
VC = 220’
K = 49
78" RCP-III
PIPE HYDRAULIC DATA