Loading...
HomeMy WebLinkAbout20210925 Ver 1_Pre-Filing Meeting Information_20211028DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Ple ase list all e xisting proje ct ID's associate d with this proje cts.* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low and include location information.* 20210925 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre-Filing Me eting Reque st submitte d 5/4/2021 Della Moore drmoore2@ncdot.gov Tabernacle Church Road Bridge Replacement NCDOT Guilford City Greensboro State / Province / Region NC Postal / Zip Code 27415 Country USA Street Address 1584 Yanceyville Street Address Line 2 P.O. Box 14996 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No 17BP.7.R.138/TIP-SF 400584 Dave Wanucha Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date TIP project SF-400584 involves the replacement of the existing NCDOT Bridge #400584 on SR 3412 (Tabernacle Church Road) over Big Alamance Creek at Guilford County. Bridge #400584 consists of 3 @ 30' precast prestressed concrete channels with end bents made of PPC cap and timber piles and interior bents made of PPC cap and steel piles. The existing bridge is structurally deficient and in need of replacement. Therefore, NCDOT proposes to construct a new bridge within it's existing footprint. Tabernacle Church Rd Permit Drawings (1).pdf 1.91MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 5/4/2021