Loading...
HomeMy WebLinkAbout820470_POA Sludge Reduction_20211001PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION Facility Number: r2 - v70 Facility Name: Certified Operator Name: L4G0's PR•2,I R.0) C/ i.- Operator #: **Attach a copy of Lagoon Sludge Survey Form and volume worksheets Note: A certified Sludge Management Plan may be submitted in lieu of this POA. Lagoon 1 I / Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6 a. Lagoon Name/ Identifier b. Total Sludge Depth (ft) (oye / c. sludge Depth to be, Removed for Compliance (ft) / 3 d. Sludge Volume to be Removed (gallons) / 2 e. Sludge PAN (lbs/1000 gal) % f. Liquid PAN (lbs/1000 gal) %• ? g. PAN of Sludge (Ibs) (d x e)/1000 A(% Compliance Timeframes: If the sludge levelis equal to or higher than the stop pump level of the lagoon or if the sludge level results in an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey. If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in sludge levels, DWR may require the owner to develop a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.27. SPOA 9-15-2016 Page 1 of 3 ill he NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge depth. If microbe •use is planned, specify the product to be used. , rife cA Palv4 gi41t17 av, anatedt.L et•yes - D^ '✓iz 'T4.r+. row alit/ Ili eic:cli 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. I further certify and acknowledge that compliance with regard to sludge accumulation must be achieved within two years of the original sludge survey indicating non-compliance. Sludge Survey Date: $ %/' 65, Facility QWnerm )ea, //, anger (print) Facility Owner/Manager (signature NPDES Permitted Facilities' Return this form to: Animal Feeding Operations Program NC Division of Water Resources 1636 Mail Service Center Raleigh, NC27699-1636 Compliance Due Date: Phone: 7/e /Z).--yS vi Date: / %6' .10.av State Permitted Facilities Return this form to: NC Division of Water Resources at the appropriate Regional Office (see following page) SPOA 9-15-2016 Page 2 of 3