HomeMy WebLinkAbout820262_sludge poa_20211001Facility Number:
Facility Name: (w
Certified Operator Name: :04J• J dos
PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION
2_L County:
Operator #:
020cC 3
**Attach a copy of Lagoon Sludge Survey Form and volume worksheets
Note: A certified Sludge Management Plan may be submitted in lieu of this POA.
a. Lagoon Name! Identifier
b. Total Sludge Depth (ft)
c. Sludge Depth to be
Removed for Compliance
(ft)
d. Sludge Volume to be
Removed (gallons)
e. Sludge PAN
(Ibs/1000 gal)
f. Liquid PAN
(lbs/1000 gal)
g. PAN of Sludge (Ibs)
(d x e)/1000
Lagoon 1
/t I
3
/
N/E
Lagoon 2
Lagoon 3
Lagoon 4
Lagoon 5
Lagoon 8
Compliance Timeframes:
If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level
results in an elevated waste analysis, a sludge management plan that meets the requirements of SB
Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to
DWQ within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance
with NRCS Standard 359 must be achieved within two years of the original sludge survey.
If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed
within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the
original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in
sludge levels, DWQ may require the owner to requirements of SB Interagency Group Guidance Document1managementelop a sludge plan that meets the
.26.
SPOA 3-22-2010 Page 1 of 2