HomeMy WebLinkAbout20211568 Ver 1_Pre-Filing Meeting Information_20211029Contact Name*
Deborah Shirley
Contact Email Address*
dshirley@sandec.com
Project Owner*
Wendell Glennon LLC (Attn:
Kimberly Cummings)
Project Name*
The Glennon
Project County*
Wake
Owner Address:*
Street Address
6801 Winding Ridge Road
Address Line 2
aty
State / Province / Pegion
Zebulon
NC
Postal / Zip axle
Country
27957
USA
Is this a transportation project?*
C Yes c: No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
F- Individual Permit F- Modification
F- Shoreline Stabilization
Does this project have an existing project ID#?*
C Yes c: No
Do you know the name of the staff member you would like to request a meeting with?
Colleen Cohn
Please give a brief project description below and include location information.*
The Glennon project is a proposed mixed use multi -family residential
development and commercial development located at the intersection
of Rolesville Road and US highway 64 in Wendell, NC. The project is
approximately 56 acres and proposes the construction of residential
lots, roadway infrastructure, utilities, SCM's, pedestrian trails and
amenities. Existing conditions onsite consists primarily of undisturbed
forested land. Specifically, there is one (1) wetland, one (1)
intermittent stream and one (1) perennial stream located on the
property. There are proposed stream and buffer impacts for road
crossings. General land use in the vicinity of the project consists of
forested land with some residential and commercial developments.
US 64 Highway bounds the property to the south and Rolesville Road
bounds the property to the east.
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that Icannot submit myapplication until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
+5W off ,a,Q
Submittal Date 8/18/2021