Loading...
HomeMy WebLinkAbout20130966 Ver 1_USACE Correspondence_20131017 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT SAW-2013-01745 AsheNC-BALDWIN GAP Action Id. County: U.S.G.S. Quad: GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION NC DOT DIV 11 Permittee: Heath Slaughter 801 Statesville Rd. Address: North Wilkesboro, NC 28659 336-903-9202 Telephone Number: 2 acres Size (acres) Nearest Town North Fork New RiverUpper New. North Carolina, Virginia. Nearest WaterwayRiver Basin 505000136.4354 USGS HUCCoordinatesLatitude: -81.6309 Longitude: he project site is located on an approximate 0.33 mile length of SR 1387 (Dr. Robinson Road), Location description: T immediately north of the SR 1387, NC88 intersection in Ashe County, North Carolina. This authorization is for temporary and permanent impacts to jurisdictional streams Description of projects area and activity: associated with the replacement of three (3) existing road crossings as follows: Crossing #1 (Sta 5+89): Stream 1-58 linear feet of total impacts. Permanent impacts are associated with the replacement of a 32 foot pipe with a 40 foot pipe and 10 linear feet of rip rap for bank stabilization/dissipation. 40 linear feetof temporary impacts are for dewatering. Crossing #2 (Sta. 6+77): Stream 2-59 linear feet of total impacts. Permanent impacts are associated with the replacement of a 31 foot pipe with a 40 foot pipe and 10 linear feet of rip rap for bank stabilization/dissipation. 40 linear feet of temporary impacts are for dewatering. Crossing #3 (Sta. 14+57): Stream 3-59 linear feet of total impacts. Permanent impacts are associated with the replacement of a 31 foot pipe with a 40 foot pipe and 10 linear feet of riprap for bank stabilization/dissipation. 40 linear feet of temporary impacts are for dewatering. Applicable Law: Section 404 (Clean Water Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) NWP 14 Linear Transportation Authorization:Regional General Permit Numberor Nationwide Permit Number: Projects. S EE ATTACHED RGP or NWP GENERAL, REGIONALAND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information received on September 9, 2013, including additional information provided on September 12, 2013.Any violation of the attached conditions or deviation from yoursubmittedplans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized providedthe activity is completed within twelve months of the date of the nationwide permit’s expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory Andrew Williamsat919-554-4884 x26or Andrew.E.Williams2@usace.army.mil program, please contact . Special Condition #1: Recommendations numbered 1-7, 9, 11 in the attached letter from the North Carolina Wildlife Resource Commission dated October 10, 2013 are hereby incorporated as special conditions of this permit verification. Ejhjubmmz!tjhofe!cz! XJMMJBNT/BOESFX/F/2355672766! EO;!d>VT-!p>V/T/!Hpwfsonfou-!pv>EpE-!pv>QLJ-! pv>VTB-!do>XJMMJBNT/BOESFX/F/2355672766! 10/17/2013 Corps Regulatory Official: ___________________________Date: Ebuf;!3124/21/28!24;24;56!.15(11( Expiration Date of Verification 03/18/2017 : Determination of Jurisdiction: A. Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33CFR Part 331). B. There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. The jurisdictional areas within the above described project area have been identified under a previous action. Please reference SAW- jurisdictional determination issued. Action ID:. Basis For Determination: The three (3) streamsarerelatively permanent waters(RPWs) and areunnamed tributariesto the North Fork of the New River, atraditionally navigable water (TNW), in the lower reaches. The North Fork of the New River is a tributary to the New River, a TNWand a navigable water of the United States, in lower reaches.The Ordinary High Water Mark (OHWM) of the unnamed tributarieswereindicated by the following physical characteristics: clear natural line impressed on the bankandshelving, as indicated by the applicant. This jurisdictional determination is only for the streamsproposed for impacts associated with theseNationwide Permit verificationsand does not include any other waters/wetlands that may be located on the project site. Remarks: None E.Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps’Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F.Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and Cabove). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the DivisionOffice within 60 days of the date of the NAP. Should you 12/16/2013. decide to submit an RFA form, it must be received at the above address by **It is not necessary to submit an RFA form to the DivisionOffice if you do not object to the determination in this correspondence.** Ejhjubmmz!tjhofe!cz!XJMMJBNT/BOESFX/F/2355672766! EO;!d>VT-!p>V/T/!Hpwfsonfou-!pv>EpE-!pv>QLJ-!pv>VTB-! do>XJMMJBNT/BOESFX/F/2355672766! Corps Regulatory Official: ______________________________________________________ Ebuf;!3124/21/28!24;25;18!.15(11( Andrew Williams 10/17/2013 Dateof JD: October 17, 2018 Expiration Dateof JD: The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, http://per2.nwp.usace.army.mil/survey.html. please complete ourcustomer Satisfaction Survey online at Copy furnished(via email): Sue Homewood North Carolina Department of Natural Resources Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Action ID Number:SAW-2013-01745County:Ashe Permittee: NC DOT DIV 11 Heath Slaughter Project Name:NCDOT/SR1387/11C.005127/Division11 Date Verification Issued: 10/17/2013 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams 3331 Heritiage TradeDrive, Suite 105 Wake Forest, North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. _____________________________________________________________ Signature of PermitteeDate NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL SAW-2013-01745 Applicant: File Number: Date: NC DOT DIV 1110/17/2013 Heath Slaughter Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission)A PROFFERED PERMIT (Standard Permit or Letter of permission)B PERMIT DENIALC APPROVED JURISDICTIONAL DETERMINATIOND PRELIMINARY JURISDICTIONAL DETERMINATIONE SECTION I -The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/inet/functions/cw/cecwo/regor Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permitto address some of your objections, or (c) not modify the permithaving determined that the permit should be issued as previously written.After evaluating your objections, the district engineer will send you a proffered permitfor your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) becauseof certain terms and conditions therein, youmay appeal the declined permitunder the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: Youmay appeal the denial of a permitunder the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION:You may accept or appeal the approved JD or provide new information. ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. APPEAL: If you disagree with the approved JD, youmay appeal the approved JD under the Corps of Engineers Administrative Appeal Processby completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II -REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is neededto clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OFCONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact:also contact: District Engineer, Wilmington Regulatory Division, Attn: Mr. Jason Steele, Administrative Appeal Review Officer Andrew Williams CESAD-PDO 3331 Heritiage Trade Drive, Suite 105 U.S. Army Corps of Engineers, South Atlantic Division Wake Forest, North Carolina 27587 60 Forsyth Street, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course ofthe appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date:Telephone number: ________________________________________ Signature of appellant or agent. For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137