Loading...
HomeMy WebLinkAboutNCC216035_ESC Approval Submitted_20211029ROY COOPER lktv Governor ELIZABETH S. BISERSecretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality September 29, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Lenze Real Estate, LLC ATTN: Mr. George Lenze 1636 Everett Rd. Pisgah Forest, NC 28768 RE: Project Name: LENZE HOME SITE Acres Approved: 4.82 Project ID: TRANS-2021-016 County: Transylvania City: Little River Address: 986 Everett Rd. River Basin: French Broad Stream Classification: Unnamed Tributary to French Broad River - Class B Submitted By: High Country Engineering, P.C. - Mr. Michael Goforth, P.E. Date Received by LQS: August 30, 2021 Plan Type: Residential Dear Mr. Lenze, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications is attached. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucasOncdenr.gov or Paul Clark at Paul.clarkOncdenr.gov. If the owner/operator D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NORTH CAROHNA uepaa ,tmenmmnmwWQml\ r 828.296.4500 Letter of Approval with Modifications ATTN: Mr. George Lenze September 29, 2021 Page 2 of 4 of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, AuL "AS/L Fred Walker, P.E. Express Engineer Land Quality Section Letter of Approval with Modifications ATTN: Mr. George Lenze September 29, 2021 Page 3 of 4 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications ec: Mr. Michael Goforth, P.E. (mgoforthPhcepc.net) Mr. Landon Davidson, P.G. - NCDEQ-DWR (landon.davidsonOncdenr.gov) Ms. Kaylie Yankura - NCDEQ-DWR (kaylie.yankuraftcdenr.gov) cc: Regional Office file Letter of Approval with Modifications ATTN: Mr. George Lenze September 29, 2021 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: LENZE HOME SITE Project ID: TRANS-2021-016 County: Transylvania For final plan approval please provide to this office the requested documents listed below. 1. Provide stabilized outlets for all conveyances, and provide calculations for sizing outlets including drainage area maps for each outlet. {G.S. 113A-57.(3)1 2. Identify the riparian buffer on the E&SC plan. Sequencing should note that all work within the riparian buffer must be stabilized at the end of each workday, and that no work is to take place within the buffer during wet weather or periods of predicted wet weather 115A NCAC 0413.0106 (a)(1)1 3. Hatch or color all areas that are required to meet 7-day stabilization requirement in NPDES NCG010000, also identify areas that have been mulched or will be mulched. {NPDES NCGO100001 {G.S. 113A-57.(4)1 4. Remove S. Lespedeza from seeding detail. {G.S. 113A-57.(3)1 5. Provide construction detail for all proposed conveyances and perimeter controls. {G.S. 113A-57.(3)1 6. Provide silt fence or other comparable measure around stockpile areas to minimize potential for offsite sediment. {G.S. 113A-57.(3)1 7. Add notes to construction sequence that no major grading activities are to take place during wet weather or periods of predicted wet weather, and to notify NCDEQ inspector when project is stabilized and ready to close out. Measures should not be removed until NCDEQ inspector approves of removal. Add construction sequence to the E&SC plan set.115A NCAC 0413.0106 (a)(3)1 8. All other permitting associated with stream work and or post -construction stormwater permitting must be approved from the respective jurisdictional agencies before commencing work on this project. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities