HomeMy WebLinkAboutNCC216035_ESC Approval Submitted_20211029ROY COOPER lktv
Governor ELIZABETH S. BISERSecretary
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
September 29, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Lenze Real Estate, LLC
ATTN: Mr. George Lenze
1636 Everett Rd.
Pisgah Forest, NC 28768
RE: Project Name: LENZE HOME SITE
Acres Approved: 4.82
Project ID: TRANS-2021-016
County: Transylvania
City: Little River
Address: 986 Everett Rd.
River Basin: French Broad
Stream Classification: Unnamed Tributary to French Broad River - Class B
Submitted By: High Country Engineering, P.C. - Mr. Michael Goforth, P.E.
Date Received by LQS: August 30, 2021
Plan Type: Residential
Dear Mr. Lenze,
This office has reviewed the subject erosion and sedimentation control plan and hereby
issues this Letter of Approval with Modifications. A list of the modifications is attached. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. Should
the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucasOncdenr.gov or Paul Clark at Paul.clarkOncdenr.gov. If the owner/operator
D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NORTH CAROHNA
uepaa ,tmenmmnmwWQml\ r 828.296.4500
Letter of Approval with Modifications
ATTN: Mr. George Lenze
September 29, 2021
Page 2 of 4
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
AuL "AS/L
Fred Walker, P.E.
Express Engineer
Land Quality Section
Letter of Approval with Modifications
ATTN: Mr. George Lenze
September 29, 2021
Page 3 of 4
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications
ec: Mr. Michael Goforth, P.E. (mgoforthPhcepc.net)
Mr. Landon Davidson, P.G. - NCDEQ-DWR (landon.davidsonOncdenr.gov)
Ms. Kaylie Yankura - NCDEQ-DWR (kaylie.yankuraftcdenr.gov)
cc: Regional Office file
Letter of Approval with Modifications
ATTN: Mr. George Lenze
September 29, 2021
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: LENZE HOME SITE
Project ID: TRANS-2021-016
County: Transylvania
For final plan approval please provide to this office the requested documents listed below.
1. Provide stabilized outlets for all conveyances, and provide calculations for sizing
outlets including drainage area maps for each outlet. {G.S. 113A-57.(3)1
2. Identify the riparian buffer on the E&SC plan. Sequencing should note that all work
within the riparian buffer must be stabilized at the end of each workday, and that no
work is to take place within the buffer during wet weather or periods of predicted
wet weather 115A NCAC 0413.0106 (a)(1)1
3. Hatch or color all areas that are required to meet 7-day stabilization requirement in
NPDES NCG010000, also identify areas that have been mulched or will be mulched.
{NPDES NCGO100001 {G.S. 113A-57.(4)1
4. Remove S. Lespedeza from seeding detail. {G.S. 113A-57.(3)1
5. Provide construction detail for all proposed conveyances and perimeter controls.
{G.S. 113A-57.(3)1
6. Provide silt fence or other comparable measure around stockpile areas to minimize
potential for offsite sediment. {G.S. 113A-57.(3)1
7. Add notes to construction sequence that no major grading activities are to take place
during wet weather or periods of predicted wet weather, and to notify NCDEQ
inspector when project is stabilized and ready to close out. Measures should not be
removed until NCDEQ inspector approves of removal. Add construction sequence to
the E&SC plan set.115A NCAC 0413.0106 (a)(3)1
8. All other permitting associated with stream work and or post -construction
stormwater permitting must be approved from the respective jurisdictional
agencies before commencing work on this project.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities