Loading...
HomeMy WebLinkAbout20211562 Ver 1_Shoreline Stabilization_20211028Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: Pre -Filing Shore Line 10.28.21.pdf 326.63KB Pre -fling Meeting or Request Date 9/20/2021 ID# 115063 Version I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email* jtworkshop@aol.com Please provide an email address for payment and requests for more information here. Owner Information: Name: * Tammy Shue Airheart Email: * jtworkshop@aol.com Phone Number: * (704)791-0347 (xxx)xxx-xxxx Mailing Address:* Street Address 2989 Old Salisbury Concord Rd Address Line 2 City State / Province / Region Concord NC Postal / Zip Code Country 28025-7827 United States Is there an agent working on the project?* Yes No Project Information [15A NCAC 02H .0502(a) & (b)] ................................................................................................................................................................................. Project Name: * Rebuild piers and stabilize shoreline If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* Upload File • Look up address Property Address Lookup: * Street Address 177 High Shores Road Address Line 2 city State / Province / Region Norwood NC Postal / Zip Code Country 28128-8627 US Latitude: * 35.250676 Longitude:* -80.101743 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Survey Boat House 10.28.21.pdf 164.23KB Please use the diagram at the link below: https:Hedocs.deq.nc.gov/WaterResources/O/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Photos Boat House 10.28.21.pdf 127.98KB 4. Location of the property (where work is to be conducted) Nearest Town: * Norwood County: * Stanly Lake/ river/ ocean adjacent to Lake Tillery property: Subdivisions name or site address:* 177 High Shores Drive Include phase/lot number Directions to site:* Indian mound road to Lake shore Dr., go to end, left on Berry Hill, Left on high Shores, House at end. Gate - Will need to have me meet you there to get in. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * Residential home. Going to stabilize the existing shoreline, there is broken concrete block wall that is cracked. Going to remove and fix the shoreline with rock. Talked to the Corp of Engineers and she said anything under 600 feet will not need her permission. Residential, undeveloped, etc. 6. Property Size Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Shoreline is in bad shape in areas. Wooden wall is rotten, block was is cracked and broken. Going to fix with rock and or boulders that are natural to the area. 8. How will the work be done?* ✓ From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 2500 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 100 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) No vegetation is affected. Sketch: Survey Boat House 10.28.21.pdf 164.23KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): 0 $240.00 for impacts to lake (below normal water level) of less than 1 acre 0 $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Tamara "Tammy" Shue Airheart Signature: -FA.A�A--FA.,r Submittal Date: 10/28/2021 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20211562 Version: * Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Alan Johnson: eads\adjohnson I Mooresville Regional Office - (704) 663-1699 No Payment Needed Fee Received • Need Fee - send electronic notification • $240.00 $570.00 [.17u+1KYa1a rllEs�L1WD PpO.IECi'S 3WY9CALsV77 r7p1 �1.p[9 RO.OYw Z * s. OR�n Z .��� N R_i � ORR II Rio v4i�Q q "R r I :r----- I _ _ 1---�--- I r � 7� f 7' 7 +�7 6 M .•. s. 1-3 a _ sg ER S \ Y \ k iN,• EXISTING BOAT HOUSE AND ➢ECK EXHIBIT MEDLIN us �.�ti. TAMARA S. AIRHEART pnd husband JOSH W. AjRNEART SURVEYING CO. rAii ft 91K PART OF PIN 6574DII70988 2915 STALL24G. Rp pW 117 FIlGi SHORES ROAD 1NAWISHURG. NC 28075 -Mi. 9o1 pq C1TY 9F NORWOOO OF SUINLT COUNTY N.C. CW: 70+-201-4332 NAIL MEDUN"VEYWAHOO.CW From: jtworkshop@aol.com, To: jtworkshop@aol.com, Subject: Shoreline Date: Thu, Oct 28, 2021 2:22 pm Attachments: IMG_5829.jpg (2452K), IMG_5830.jpg (2702K), IMG_5842.jpg (2487K) 3 Attached Images [.17u+1KYa1a rllEs�L1WD PpO.IECi'S 3WY9CALsV77 r7p1 �1.p[9 RO.OYw Z * s. OR�n Z .��� N R_i � ORR II Rio v4i�Q q "R r I :r----- I _ _ 1---�--- I r � 7� f 7' 7 +�7 6 M .•. s. 1-3 a _ sg ER S \ Y \ k iN,• EXISTING BOAT HOUSE AND ➢ECK EXHIBIT MEDLIN us �.�ti. TAMARA S. AIRHEART pnd husband JOSH W. AjRNEART SURVEYING CO. rAii ft 91K PART OF PIN 6574DII70988 2915 STALL24G. Rp pW 117 FIlGi SHORES ROAD 1NAWISHURG. NC 28075 -Mi. 9o1 pq C1TY 9F NORWOOO OF SUINLT COUNTY N.C. CW: 70+-201-4332 NAIL MEDUN"VEYWAHOO.CW From: laserfiche@ncdenr.gov, To: jtworkshop@aoi.com, Subject: Pre -Filing Time Clock has been reached for Shoreline Stablilization - Ver Date: Thu. Oct 21, 2021 12:01 am Attachments: DWR Pre -Filing Meeting Request Form.pdf (112K) The !North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Shoreline Stablilization that you submitted on 912012021. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address. as responses are not monitored. Internal Use only: Non Transportation Contact Name's Contact Email Address" Project Owner} Project Name* Project County Tammy Shue Airheart Itworkshop@aol.com Tammy Airheart Shoreline Stablilization Stanly Owner Address: } Street Address 177 High Shores Drive Address Line 2 Mailing is 2989 Old Salisbury Concord Rd Concord NC 28025 City Slab. ' Province I Relpon Norwood NC Postal Zip Cude Country 28128 United States Is this a transportation project?* Yes No Type(s) of approval sought from the DWR: 401 Water Quality Certification - 401 Water Quality Certification - Regular Express Individual Permit Modification Shoreline Stabilization Does this project have an existing project ID#?' Yes No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson - or division of Water Q�;ali:y Please give a brief project description below and include location information.' I am trying to repair and replace with stone rlprap or natural rock the existing shoreline at this property. We are also applying to repair and replace the pier as it has damage and rot. My phone number is 704- 791-0347 cell and Office is 704-782-5438. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements; . This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not regwred to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature* lictloU 'r " f(katt Submittal Date 9/20/2021