Loading...
HomeMy WebLinkAbout20201968 Ver 1_More Info Requested_202110281 Anderson, Mitchell L From:Anderson, Mitchell L Sent:Thursday, October 28, 2021 4:32 PM To:'caguffey@ncdot.gov'; 'steve.garrison@rutherfordcountync.gov' Subject:FW: DWR 2020-1968 Ver 2 Broad River Paddle Accesses: Rutherford County     From: Anderson, Mitchell L   Sent: Thursday, October 28, 2021 4:30 PM  To: josselyn@bfec.org; tim@dbdplanning.com; adam@bfec.org  Cc: caguffy@ncdot.gov  Subject: DWR 2020‐1968 Ver 2 Broad River Paddle Accesses: Rutherford County    Hello Mr. Johnson,    On September 30, 2021 the Division of Water Resources (Division) received your application requesting a 401 Water  Quality Certification from the Division for the subject project, with the appropriate fee  received on October 04, 2021. The Division has determined that your application is incomplete and cannot be  processed. The application is on‐hold until all of the following information is received:      1. Please provide a site plan showing the property boundaries, structures (buildings, docks, impervious surfaces,  etc.), location of the shoreline, location of the impacts to the streambank and/or streambed (excavation,  dredging, rip rap, concrete, etc.) [15A NCAC 02H .0502(a)(9)]    2. Per Condition 9 GC 4132, all work in or adjacent to streams shall be conducted so that the flowing stream does  not come in contact with the disturbed area.  Please provide a construction sequence that details the measures  to be utilized at the site and a sequence of construction events to be followed to ensure compliance with this  condition.  In addition, please ensure that the location of the temporary impacts are shown on the construction  drawings and clearly indicated in the revised impact table.  [15A NCAC 02H .0506(b)(3) ]    3. Per Condition 13 GC 4132, all necessary measures shall be taken to prevent direct contact between uncured  concrete and waters of the state. Plans received on September 30, 2021 do not provide sufficient detail for the  proposed impacts to the Broad River. Please provide information and details regarding materials used to  construct the proposed structures as well as their placement within the streambank and/or streambed (Landing  area, stairs, etc.) [15A NCAC 02H .0502(a)(9) and .0506(b)(3)]    4. A complete review of the project cannot be conducted until the U.S. Army Corps of Engineers has verified 404  permit requirements and coverage under a Nation Wide or Individual Permit.  Please provide documentation of  Permit verification by the USACE.    Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the  proper consideration of the application.  Please respond in writing within 30 calendar days. If all of the requested  information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the  application and it will be denied as incomplete.  The denial of this project will necessitate reapplication to the Division  for approval, including a complete application package and the appropriate fee.   2 Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any  work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code.     Thank you,    Mitchell Anderson Environmental Specialist – Asheville Regional Office Water Quality Regional Operations Section NCDEQ – Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 828-296-4662 office mitchell.anderson@ncdenr.gov     Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties   Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.