Loading...
HomeMy WebLinkAbout20201510 Ver 1_B-5624 10-25-21 UBO Clearing Survey_20211027From:Farrell, Sean C To:Shaver, Brad E CIV USARMY CESAW (US); Sprinkle, Hannah H; Westphal, Anneliese; Herndon, T. Mason Subject:RE: B-5624 10-25-21 UBO Clearing Survey Date:Wednesday, October 27, 2021 7:10:30 PM Attachments:B-5624_DisturbedArea_permFill.pdf IMG_20211027_190203.jpg image001.png Brad and Hannah, Cherokee, the subcontractor for ATMC, removed most of the fill that eroded from the shoulder into the wetlands. Anneliese and I took some measurements and the extent of the material in wetlands actually appeared to fall within our permitted permanent fill impacts (see attached drawing). There still appears to be a convex area just off the toe of the shoulder, but it was hard to tell since the area is pretty hummocky. Since this was within our permitted fill impacts I thought it was best for them to stop shoveling. There were really only two bad ruts ( seen in the background of attached photo) and these were a result of having their bore machine down in the wetlands. I asked them not to do anything with these since I didn’t want to create more disturbance since the impacts are probably de minimis. The rest of the clearing is what I would expect to see from hand clearing for the temporary detour and I did not see any bad ruts (it was very dry). Cherokee informed us that the reason for the clearing was that they needed a line of sight for the bore. As I understand it, wetland clearing for a line of sight for a bore has traditionally only been considered for gas lines, so this is something I am looking into a bit further our Utilities unit. I can be available anytime Friday if you all want to get out to the site. Thanks, Sean Farrell Division Environmental Officer Division 3 NCDOT- Division of Highways 910-341-2033 office 910-599-1184 mobile scfarrell@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Farrell, Sean C <scfarrell@ncdot.gov> Sent: Monday, October 25, 2021 3:29 PM To: Shaver, Brad E CIV USARMY CESAW (US) <Brad.E.Shaver@usace.army.mil>; Sprinkle, Hannah H <hannah.sprinkle@ncdenr.gov>; Westphal, Anneliese <awestphal@ncdot.gov>; Herndon, T. Mason <tmherndon@ncdot.gov> Subject: Fw: B-5624 10-25-21 UBO Clearing Survey Brad and Hannah, We are still working to determine why the clearing occurred at this stage. Thankfully it does not appear to extend beyond the limits of temporary impact permitted for the detour. I have asked ATMC to get out tomorrow with hand tools to retrieve the plume of material that appears to have eroded from the bore pit on the shoulder. We have a meeting tomorrow morning with Construction and Environmental staff to draft changes to standard operating procedures related to oversight of utility relocations. I will keep you updated with those developments. I will also send photos of the cleanup and one of us can take you out there whenever works with your schedules. Thanks, Sean From: Stewart, Alex D <adstewart2@ncdot.gov> Sent: Monday, October 25, 2021 1:57 PM To: Farrell, Sean C <scfarrell@ncdot.gov>; Koltiska, Jake <jkoltiska@ncdot.gov> Cc: Bailey, John L <jlbailey@ncdot.gov>; McBryan, Sean R <srmcbryan@ncdot.gov>; Westphal, Anneliese <awestphal@ncdot.gov>; Jetton, Joseph C <jcjetton@ncdot.gov>; Rivenbark, Jason A <jarivenbark1@ncdot.gov>; Sleeper, Lonny A <lasleeper@ncdot.gov> Subject: RE: B-5624 10-25-21 UBO Clearing Survey Sean: See the attached UBO clearing survey, UBO plans, and pictures that Sean and John took of the location earlier today. All of the clearing that took place appears to fall within the temporary fill in wetlands area and there will be additional clearing that will take place during the life of this project. Jake: Please coordinate with ATMC to have them recover the lost material and pursue vegetation efforts through coordination with the agencies as soon as possible. Thank you, Alex D. Stewart, PE Resident Engineer Resident Engineer’s Office - Wilmington (910) 231-6528 cell From: McBryan, Sean R <srmcbryan@ncdot.gov> Sent: Monday, October 25, 2021 1:18 PM To: Stewart, Alex D <adstewart2@ncdot.gov>; Koltiska, Jake <jkoltiska@ncdot.gov> Cc: Bailey, John L <jlbailey@ncdot.gov> Subject: B-5624 10-25-21 UBO Clearing Survey Good afternoon Alex and Jake, Please see the attached survey of the clearing performed by UBO contractors for the B-5624 project. You will see that we cleared 0.133 AC in a “Temporary Fill in the Wetland Area” and 0.073 AC in a “Non-wetland Area.” Also, John took some pictures of the cleared area at the time of this survey. There are quite a few, so is there a spot that we can upload them to on the S drive that would be easy for everyone to access? Thank you, Sean McBryan Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.