HomeMy WebLinkAbout20051608 Ver 2_Permit Drawings_20061106
dµ SUTE n
a o~
~ ~.. .
~~~~.-
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
November 6, 2006
Commander, Fifth Coast Guard District (obr)
LANTAREA
Bridge Administration
Federal Building
431 Crawford Street
Portsmouth, VA 23704-5004
Attn: Mr. Waverly Gregory
Chief, Bridge Administration
~5~~~~
~ ,~~v~ /1
LYNDO TIPPETT
SECRETARY
SUBJECT: Revised bridge drawings for the replacement of Bridge No. 60 (Alfred
Cunningham Bridge) over the Trent River on US 70 Business (East Front Street);
Craven County; TIP Project B-2532; Federal Aid Project No. BRSTP-070B(4);
State Project No.8.1172401; WBS 32649.1.1.
Dear Mr. Gregory:
Please find the attached four revised copies of the US Coast Guard (USCG) drawing for this
project. The revisions to the bridge are due to the design modifications to the Bascule spans.
Each Bascule span is now 8'6" longer and the total length of the approach spans have been
shortened accordingly. The temporary channel is narrowed from 66' to 51'. The overall length of
the bridge is unchanged.
During construction, the pier of the existing swing span will be utilized as a temporary support
for the new Bascule spans. This detail has been added to the drawings.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699-1548
TELEPHONE: 919-733-3141
FAX: 919-733-9794
WEBSITE: WWW.DOH.DOTSTATE.NC.US
LOCATION:
TRANSPORTATION BUILDING
1 SOUTH WILMINGTON STREET
RALEIGH NC
~~
Please continue the review of the proposed project for authorization under an U.S. Coast Guard
Permit. It is requested that any correspondence from your office regarding this project include
the NCDOT TIP Number (B-2532). Should you have any questions regarding this information,
please contact Mr. Chris Underwood at 919-715-1451.
Sincerely,
~d-~~
~,•~Gregory .Thorpe, Ph.D., Environmental Management Director
Project Development and Environmental Analysis Branch
Encl.: (1) Four copies of a vicinity map and drawings of the bridge.
cc list:
w/o attachment
Mr. John Hennessy, NCDWQ
Mr. Travis Wilson, NCWRC
Mr. Gary Jordan, USFWS
Mr. Ron Sechler, NMFS
Mr. Michael Street, NCDMF
Mr. Steve Sollod, NCDCM
Mr. Mike Thomas, NCDCM
Dr. David Chang, P.E., Hydraulics
Mr. Mark Staley, Roadside Environmental
Mr. Greg Perfetti, P.E., Structure Design
Mr. C.E. Lassiter, P.E., Division 2 Engineer
Mr. Jay Johnson, Division 2 Environmental Officer
Mr. Jay Bennett, P.E., Roadway Design
Mr. Majed Alghandour, P. E., Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Scott McLendon, USACE, Wilmington
Mr. Vince Rhea, P.E., PDEA
Mr. Carl Goode, PE, Human Environment Unit
2