HomeMy WebLinkAbout20050732 Ver 13_More Info Received_20130925Burdette, Jennifer a
From: Burdette, Jennifer a
Sent: Thursday, September 26, 2013 1:31 PM
To: 'Chris Huysman'
Subject: RE: USACE 2001 -21252 / DWQ 05 -0732 Newland Communities Briar Chapel Chatham
County
I don't understand why the baffle would only be on the downstream end instead of running the entire length of the
culvert. Am I missing something or misinterpreting the drawing?
Jennifer
Jennifer A. Burdette
401 /Buffer Coordinator
401 & Buffers Permitting Unit
Wetlands Branch
NCDENR - Division of Water Resources - Water Quality Programs
1650 Mail Service Center
Raleigh, NC 27699 -1650
(919) 807 -6364 phone
(919) 807 -6494 fax
*Email correspondence to and from this address may be subject to the North Corolino Public Records Low and may be disclosed to
third parties unless the content is exempt by statute or other regulotion.*
From: Chris Huysman [mailto:chris.huysman @wetland- consultants.com]
Sent: Wednesday, September 25, 2013 1:24 PM
To: 'Chris Huysman'; 'Williams, Andrew E SAW'
Cc: Burdette, Jennifer a
Subject: RE: USACE 2001 -21252 / DWQ 05 -0732 Newland Communities Briar Chapel Chatham County
Jennifer
Per your request I have attached a copy of the drawings which shows the baffle that has a "notched weir" at the outlet of
the pipe. This is to address the concern that the stream might get over -wide since DOT mandates a 12 foot wide box at
this location. The channel is approximately 4 feet wide.
Chris Huysman
336 / 406 -0906
CONFIDENTIAL & PRIVILEGED
Unless otherwise indicated or obvious from the nature of the following
communication, the information contained herein is attorney - client
privileged and confidential information /work product. The
communication is intended for the use of the individual or entity named
above. If the reader of this transmission is not the intended recipient,
you are hereby notified that any dissemination, distribution or copying
of this communication is strictly prohibited. If you have received this
communication in error or are not sure whether it is privileged, please
immediately notify us by return e-mail and destroy any copies,
electronic, paper or otherwise, which you may have of this
communication.
From: Chris Huysman [mai Ito: Chris. huysman(a)wetland- consultants.com]
Sent: Monday, September 09, 2013 9:08 AM
To: 'Williams, Andrew E SAW'
Cc: 'Burdette, Jennifer a'
Subject: USACE 2001 -21252 / DWQ 05 -0732 Newland Communities Briar Chapel Chatham County
Andy and Jennifer
Welcome to Briar Chapel.
Attached is a revision to the approved permit for the Briar Chapel Project. The revision is simply changing the size of the
pipe structure and updating the erosion control practices for the installation thereof. The file that references the approved
road crossing is what was permitted and it called for a 72 inch pipe. The approved erosion control document is attached
for reference. The final drawing shows the installation of a box culvert using diversions and a pump around. I will be
attending a pre- construction conference on September 30, 2013.
Please let me know if you have any comments or if you would want to attend that meeting.
Many thanks,
Chris Huysman
336 / 406 -0906
CONFIDENTIAL & PRIVILEGED
Unless otherwise indicated or obvious from the nature of the following
communication, the information contained herein is attorney - client
privileged and confidential information /work product. The
communication is intended for the use of the individual or entity named
above. If the reader of this transmission is not the intended recipient,
you are hereby notified that any dissemination, distribution or copying
of this communication is strictly prohibited. If you have received this
communication in error or are not sure whether it is privileged, please
immediately notify us by return e-mail and destroy any copies,
electronic, paper or otherwise, which you may have of this
communication.
From: Grant Livengood [mailto: Iivengood(a)mckimcreed.com]
Sent: Monday, September 09, 2013 7:52 AM
To: Ibowman(a)newlandco.com; Chris Huysman; roldham (a)SanfordContractors.com
Cc: Chris Seamster
Subject: GRP EC Revision
Here is what was sent to Rachael last week. Let me know if there are any comments. I will look to follow up with her in
the next day or so.
Thanks
Grant Livengood, PE Director of Planning, Development and Natural Resources
Tel 919.233.5261 ext 187 Cell 919.630.1634
1730 Varsity Drive, Suite 500 1 Raleigh, NC 27606
glivengoodCo)mckimcreed.com I http: / /www.mckimcreed.com
H
Follow us on: YouTube I twitter I facebook I Linkedln
To send me a file larger than 10MB please click here
xc.
�, -a
Y O'
r C
A r
`j
wo
Q 11 r
I
= Q
o�z
� z
I�
r
I I
i
i
LU
[ x JQ
) — X:
JW2 G7
W
or
Uj
1 e r
U
s or
W
cc
M
j Z)
� I
1
�vVvv I I _ � I m c� o
I —J J Qu
DE
6xt
I
r
f ? I 'I I
To
1`
° s
J; Vlm
16
ME
Iv
QI i c
" L
;I
�I �I zll ED �
I
Iyy,
IC �I�
c..
pp c
e
I
Imo' ^I
ISM
�i II
I
rp
I I
r
.,� �
_ ;z
- T
I -
u. I
I
z
I
I
it I
I X _