Loading...
HomeMy WebLinkAbout20070107 Ver 1_Certification of Completion_200707160112512007 17:18 9198768291 TERRATECH ENGINEERS PAGE 05 Certi~f~cati~.on of Corn letion a-r ~ .~L o7 DWQ Project Na.; ~~- ~~ ~ ~ County- ~ ~~~ ~ Applicatxt: C Ct wl ~ Q-~1 r o pew ~~ c.,~ Project Name: C~~O~ (~ v~ `oo P,ar'C- w-~"'~'S Tate of Issuance of Wetland PerxKZ.tt; l - ~' ~~ Certificate of Cam letiom Y]pan completion of all work approved within the 40X Water QaaL'ty Certl£#cation aid $ufFer Rules, and any subsequent m,odificatians, the applicant is required to return this certif cite to the ~40 L Oversight/~'acpress Permitting Unit, North Carolina pivision of Water Quality, 1650 Mail. Service Genter, Raleigh, NC,, 27699-1650. 'li'his £orm may be returned to DWQ by the applicant, the applicant's authorized agent, or the project ot~gineer. It LS 'not nECe.4sary to send certificates fxort- all of these. Applacarif's Cert~facation I, ~q.`v~~( ~v.,C2., ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance anal intent of the 401 Water Quality Certification and Gaffer Raley, tk4e~approved plans attd specifcations, and other supporting materials. „~ ~ Signature: Date: _ _ ~ - - Agent's ~Cert~cafion I, ,hereby state that, to the best of my abilities, duo care anal diligence was used izt the observation of the construction such that the corxstrachon was observed tv be built within substantial compliance and intent of the 40I Water Qaality Certification and Bsffer Rules, the approved plans and specifications, anal iffier supporting materials. Signature: I7at®: If f#is project was r~esig~ed By a Cer~,~~d .~',ro, fessir~rta~ T, as a duly registered Pmfessio~.ai (i,e., En.giz~eer,, Landscape Architect, Surveyor., etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly,. full time) the con,struetion of the project, for the Perrnittee hereby state that, to the best of my abilities, due care axed diligence was used in the observation of the co~n.stxuctiom such that the construction was observed to be built within substantial cvmpliar}ce and intent of the. 44X Water Quality Certification and Buf'f'er Rules, tho approved plans and specifications, and other supporting materials. Signature: Registration.l~(o. Q~~~od~ ~ JUL 1 6 2007 DENR -WATER QUALITY 1NET1AND3 AIJD STOEt~A14.ATER BRANCH Date JAN-25-2007 05:23PM From: 9198768291 ID:DISTRICT-OFFICE Paae:005 R=97%