Loading...
HomeMy WebLinkAbout20071127 Ver 1_WRC Comments_20070716~~ North Carolina `1Vildlife Resources Commission Richard B. Hamilton, Executive Director MEMORANDUM TO: Cyndi B. Karoly, 401 Oversight and Permits Unit NC Division of Water Quality FROM: Ron Linville, Regional Coordinator /'~ Habitat Conservation Program DATE: July 9, 2007 SUBJECT: Review of an application for Tim Waylett, Shoreline Stabilization, Lots 167 & 169, 407 Templeton Road, Lake Norman, DWQ No. 20071127, Iredell County The Division of Water Quality (DWQ) is requesting concurrence from the North Carolina Wildlife Resources Commission (NCWRC) concerning issuance of a 401 Certification and a 404 Permit from the U.S. Army Corps of Engineers. The NCWRC has reviewed information provided by the applicant, and field biologists on our staff are familiar with habitat values of the project area. These comments are provided in accordance with provisions of the Clean Water Act of 1977 (33 U.S.C. 466 et. seq.) and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). The applicant proposes to install river rock to stabilize approximately 75 linear feet of shoreline on Lake Norman. A site visit has not been conducted by our agency so these comments are provided based on the information in the application package. Based on the information provided and our knowledge of the project area, we will not object to the project provided that the following conditions are followed: 1. The stabilization project should be done with minimum class I (class II preferred) riprap. This size rock improves aquatic habitat structure. We do not support the use of river rock. In channel mining of river rock causes direct impacts to aquatic species as well as it disrupts aquatic environs by causing geomorphic and biologic modifications. River rock is subject to more slippage than more irregularly shaped quarry rock. Fabric matting may be used beneath the stone to reduce erosion and turbidity. To the extent practicable, rock or stone should be placed just above the high water mark and towards the lake five (5) to six (6) feet or Mailing Address: Division of Inland Fisheries 1721 Mail Service Center Raleigh, NC 27699-1721 Telephone: (919) 733-3633 Faz: (919) 715-7643 Tim Waylett, Lake Norman July 9, 2007 further to provide continuous aquatic edge habitat. To improve aquatic habitat values, a large boulder is recommended a minimum of every thirty (30) feet of stabilized shoreline. Placement of boulders should be accomplished in a manner that safety is not compromised. 2. Stabilization work should occur from the water instead of the shore to minimize buffer impacts. Any existing wooded buffers should be preserved. 3. Any Lazge Woody Debris (LWD) should be maintained to the maximum extent practicable to provide aquatic habitat. If relocated, the LWD must be securely anchored so that it will remain where installed. 4. Stringent erosion control measures should be installed where soil is disturbed and maintained until project completion. Temporary or permanent herbaceous vegetation should be planted on all baze soil within ten (10) days of ground disturbing activities to provide long-term erosion control. 5. Wide undisturbed shoreline buffers and natural vegetation should be maintained to the extent practicable. Disturbed banks may be revegetated with silky dogwood (Corms amonum), silky willow (Salix sericea), tag alder (Alms serrulata), black willow (Salix nigra), and sycamore (Platanus occidentalis) or other native plants to provide long term bank stability and stream shading. Note that silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted and done on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Banks in these azeas should be seeded with a tmporazy crop of wheat or oats. 6. The project should comply with NC Division of Water Quality and local planning authority buffer provisions. Thank you for the opportunity to review and comment on this project. If you have any questions regarding these comments, please contact me at 336/769-9453. E-copy: Mike Parker, DWQ-MRO Alan Johnson, DWQ-MRO Steve Chapin, USACOE-ARO Mark Cantrell, USFWS