Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC216003_Site Plan or Location Map_20211028
■ a SITE Sum N mar a p cros Rd 4olli�9 VICINITY MAP 1 If = 500' m ENGINEERING POST OFFICE BOX 91727 SITE CLEARING PLANS RALEIGH, NORTH CAROLINA 27675 PHONE: 919.610.1051 FIRM NC LICENSE NUMBER C-4222 FOR SUNSET DR FRANKLIN COUNTY, NORTH CAROLINA PIN: 1842-47-2468 DEVELOPER: DWIGHT ELAM 252.204.5120 E LAM . DWI G HT@YAH OO. CO M ENGINEER OF RECORD: FLM ENGINEERING, INC CONTACT: JON FRAZIER, PE PO BOX 91727 RALEIGH, NC 27675 919.610.1051 JFRAZIER@FLMENGINEERING.COM SHEET TITLE C-1 COVER C-2 CALCULATIONS C-3 EXISTING CONDITIONS PLAN C-4 EROSION & SEDIMENT CONTROL PLAN C-5 EROSION & SEDIMENT CONTROL DETAILS C-6 EROSION & SEDIMENT CONTROL DETAILS C-7 NCG01 SELF -INSPECTION, RECORDKEEPING & REPORTING C-8 NCG01 GROUND STABILIZATION & MATERIAL HANDLING •�N CAq ;Q E - 033775 _ 1 A •� I REVISION HISTORY I REV DESCRIPTION DATE BY 1 1 1 NCDEQ COMMENTS 1 10/19/2021 1 FLM I ORIGINAL PLAN SIZE: 24" X 36" SCALE ADJUSTMENT THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING IF IT IS NOT 1 INCH ON THIS SHEET, ADJUST YOUR SCALE ACCORDINGLY SITE CLEARING PLANS SUNSET DR FRANKLIN COUNTY, NC DATE: 09-09-2021 CALL 48 HOURS BEFORE SCALE: AS SHOWN YOU DIG DESIGNED BY: FLM APPROVED BY: ■ PROJECT NO.: 21041 NORTH CAROLINA ONE -CALL CENTER COVER 1-800-632-4949 © 2021 THIS DRAWING SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION OF FLM ENGINEERING, INC. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FRANKLIN COUNTY, NCDEQ, AND NCDOT STANDARDS AND SPECIFICATIONS. SHEET 1 OF 8 ■ SKIMMER SEDIMENT BASIN DESIGN CALCULATIONS SKIMMER SEDIMENT BASIN DESIGN SKIMMER SEDIMENT BASIN EFFICIENCY SKIMMER** DRAINAGE DISTURBED REQUIRED VOLUME WEIGHTED 25-YEAR REQUIRED AREA ORIFICE ORIFICE BASIN VOLUME DEPTH* WIDTH LENGTH RAINFALL FLOW Q SURFACE AREA SIZE NUMBER AREA AREA 1800 CF/AC (ft) (ft) (ft) PROVIDED RUNOFF INTENSITY (cfs) 325 SF/CFS PROVIDED (In) RADIUS DIAMETER (ac) (ac) (cf) (cf) COEFFICIENT (in/hr) (sf) (sf) (in) (in) SK-1 1.29 1.29 2,322 1 3 1 32 1 64 1 6,144 1 0.5 1 8.00 5.16 1,677 2,048 1.5 0.5 1.0 *DEPTH FROM BOTTOM OF SKIMMER BASIN TO SPILLWAY ELEVATION **SKIMMER SIZED PER SIZING CALCULATOR AT WWW.FAIRCLOTHSKIMMER.COM AT A DRAWDOWN RATE OF 72 HOURS TEMPORARY DIVERSION DITCH DESIGN 25-YEAR DRAINAGE BOTTOM LEFT SIDE RIGHT SIDE CHANNEL CHANNEL NORMAL SHEAR DITCH RUNOFF RAINFALL AREA Q LENGTH CHANNEL WIDTH SLOPE, Z:1 SLOPE, Z:1 DEPTH SLOPE DEPTH FREEBOARD STRESS VELOCITY MANNING'S TEMPORARY LINER NUMBER COEFFICIENT INTENSITY (acres) (cfs) (ft) SECTION (ft) (ft) (ft) (ft) (ft/ft) (ft) (ft) (Ib/ft2) (fps) n VALUE (in/hr) 1 0.50 8.00 0.91 3.64 225.00 TRIANGULAR 0.00 2.00 2.00 2.00 0.004 1.00 1.00 0.25 1.82 0.030 STRAW WITH NET 2 0.65 8.00 2.20 11.44 500.00 TRIANGULAR 0.00 2.00 2.00 2.00 0.032 1.04 0.96 2.08 5.29 0.030 NAG SC250 3 0.50 8.00 1.10 4.40 205.00 TRIANGULAR 0.00 2.00 2.00 1.50 0.015 0.84 0.66 0.79 3.12 0.030 STRAW WITH NET PIPE DESIGN 25-YEAR DRAINAGE DRAINAGE Q DRAINAGE Q TOTAL TEMP. PIPE NO. AREA AREA RAINFALL RUNOFF AREA FLOW SLOPE Dtheo SIZE Vfull LENGTH PIPE (sf) (ac) INTENSITY COEFFICIENT (cfs) (cfs) (ft/ft) (in) (in) (ft\sec) (ft) MATERIAL (in/hr) TEMP. PIPE NO. 1 96000.00 2.20 8.00 0.65 11.46 11.46 0.0100 18.6 24 7.2 40.00 HDPE WON ' C •' N 0 rt�� carInIInsno NORTH CAROLINA ONE -CALL CENTER 1-800-632-4949 ■ ENGINEERING POST OFFICE BOX 91727 RALEIGH, NORTH CAROLINA 27675 PHONE: 919.610.1051 FIRM NC LICENSE NUMBER C-4222 •�N CAq P 0� 'FESS5��s '' ��Q0 ;Q E- 033775 _ �•_ oI .NGINEEP.'�.�\� REVISION HISTORY REV DESCRIPTION DATE BY 1 NCDEQ COMMENTS 10/19/2021 FLM ORIGINAL PLAN SIZE: 24" X 36" SCALE ADJUSTMENT THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 1" I I IF IT IS NOT 1 INCH ON THIS SHEET, ADJUST YOUR SCALE ACCORDINGLY SITE CLEARING PLANS SUNSET DR FRANKLIN COUNTY, NC DATE: I 09-09-2021 SCALE: AS SHOWN DESIGNED BY: FLM APPROVED BY: PROJECT NO.: 21041 CALCULATIONS ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FRANKLIN COUNTY, NCDEQ, AND NCDOT STANDARDS AND SPECIFICATIONS. © 2021 THIS DRAWING SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION OF FLM ENGINEERING, INC. G2 SHEET 2 OF 8 EX. DRAINAGE ESMT. EX. YI TOP: 406.2 V INV: 401.31' EX. 24" RCP 0 410 \ \ \ 405 > _ OWNER: DEVRIES ERIK ANKO PIN: 1842-47-0437 EX. FENCE OWNER: CAROLINA TEL AND TEL CO PIN: 1842-26-8528 LEGEND ■ EX. PROPERTY LINE — — EX. RIGHT-OF-WAY ■ — — — — — — — — — — — EX. EASEMENT 425 EX. MAJOR CONTOUR (5') ENGINEERING EX. MINOR CONTOUR (1) x EX. BARBED WIRE FENCE POST OFFICE BOX 91727 SD SD EX. STORM SEWER RALEIGH, NORTH CAROLINA 27675 EX. TREE LINE PHONE: 919.610.1051 FIRM NC LICENSE NUMBER C-4222 NOTES 1. BOUNDARY AND TOPOGRAPHIC DATA PROVIDED BY CAWTHORNE, MOSS & PANCIERA, PC. Q�oH C. 2. SITE DELINEATED FOR THE PRESENCE OF JURISDICTIONAL WETLANDS A AND STREAMS BY SOIL & ENVIRONMENTAL CONSULTANTS, PA. NO = E JURISDICTIONAL FEATURES ARE PRESENT. = 033775 ' 3. NO PORTION OF THIS PROPERTY LIES WITHIN A FEMA DESIGNATED 9j !�!GINEEP','��� 100-YEAR FLOOD HAZARD AREA PER FEMA PANEL 3720184200L DATED 0 APRIL 16, 2013. 4. THE UTILITIES SHOWN ARE NOT GUARANTEED TO BE A REPRESENTATION OF ALL UTILITIES WITHIN THE PROJECT EXTENT. 5. THE CONTRACTOR SHALL CALL THE NORTH CAROLINA ONE -CALL -CENTER AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. REVISION HISTORY 6. THE CONTRACTOR SHALL VERIFY DEPTHS AND LOCATIONS OF ALL REV DESCRIPTION DATE BY UTILITIES PRIOR TO BEGINNING WORK AND SHALL USE CARE WHEN OPERATING AROUND EXISTING UTILITIES. 1 NCDEQ COMMENTS 10/19/2021 FLM 7. THE CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR THE REPAIR OF ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. SUNSET DR (NCSR 1173) 50' PUBLIC RM EX. TEL. BOX ORIGINAL PLAN SIZE: 24" X 36" / / / ✓ EX. DRAINAGE ESMT. / 30 15 0 30 SCALE: 1 INCH = 30 FEET INV. 421. / N SCALE ADJUSTMENT THIS BAR IS 1 INCH IN LENGTH / / / / / / < I / / / / J✓ ON ORIGINAL DRAWING EX. 18 RCP 0 n� I I IF IT IS NOT 1 INCH ON THIS SHEET, ADJUST YOUR SCALE ACCORDINGLY EX. Yl / O TOP: 434.10' /EX. BURIED PIPE / ' INV: 426.35/ SITE CLEARING PLANS PPROX. EX. TREELINE SUNSET DR FRANKLIN COUNTY, NC EX. POWER POLE ro /� J DATE: 09 09 2021 CALL 48 HOURS BEFORE SCALE: AS SHOWN YOU DIG DESIGNED BY: FLM / I APPROVED BY: _ r ■ PROJECT NO.: 21041 NORTH CAROLINA ONE -CALL CENTER EXISTING CONDITIONS PLAN 1-800-632-4949 © 2021 THIS DRAWING SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION OF FLM ENGINEERING, INC. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FRANKLIN COUNTY, NCDEQ, AND C�3 NCDOT STANDARDS AND SPECIFICATIONS. SHEET 3 OF 8 EROSION CONTROL NOTES LEGEND ■ 1. ALL LAND DISTURBING ACTIVITIES SHALL BE CONDUCTED IN ACCORDANCE WITH NCDEQ STANDARDS. 2. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED IN PROPER WORKING CONDITION DURING THE PERIOD OF CONSTRUCTION. 3. ADDITIONAL EROSION CONTROL MEASURES AND/OR MODIFICATIONS TO PROPOSED MEASURES MAY BE NECESSARY DEPENDING ON ACTUAL SITE CONDITIONS. 4. THE TOTAL DISTURBED AREA IS 2.10 ACRES. 5. PROVIDE STABLE TRANSITION AT DIVERSION ENTRANCES TO BASINS - LINE THE SLOPE AT EACH ENTRANCE WITH 12" RIP RAP OR APPROVED EQUAL. EX. DRAINAGE ESMT. r------- � I I I 1 PROP. RIP RAP ENERGY DISSIPATOR LENGTH: 6'; WIDTH: 4.5' STONE: 3" CLASS A, 9" THICK EX. YI f5TOP: 406.21' INV: 401.31' EX. 24" RCP 0 PROP.HORSESHOE INLET PROTECTION 0 PROP. RIP RAP ENERGY DISSIPATOR LENGTH: 8'; WIDTH: 6' STONE: 3" CLASS A, 9" THICK PROP. 24' X 50' TEMPORARY CONSTRUCTION ENTRANCE PROP. TEMP. PIPE #1 PROP. RAIN GAUGE AND PERMIT (n RECORD BOX LOCATION 1 PROP. LIMITS OF DISTURBANCE (TYP.) SUNSET DR (NCSR 1173) 50' PUBLIC R/W � I - INV: 404.06' .4>0_ � - � � � �`2s\ \ � SF SF EX. DRAINAGE ESMT. 405 << TD << SF \ F\ F S « TD < << D << �1 EX. TEL. BOX \ \ << TD << V I I - —� < \ sF' F I SF,-` I SF � SF PROP. SILT BAG — F SF 1 DEWATERING DEVICE PROP. 20 LF EMERGENCY SPILLWAY AT ELEV. 410.00' MAT ALL SLOPES WITH I - / ' LINED WITH NAG SC250 (OR - - - - - NAG S75BN, OR\\ \\\ I APPROVED EQUAL) I EQUIVALENT (TYP.) I PROP. TEMP DIVERSION PROP. F SIKIMMER RCLOTH� DITCH, TD-3 PROP. TEMP DIVERSION DITCH, PROP. SKIMMER BASIN, SK-1 LL / TD-2, AS CLEAN EMBANKMENT ELEV. 411.00/ WATER DIVERSION Oti go BOTTOM ELEV. 406.00' (3H:1V INTERIOR SIDE SLOPES; 2H:1V EXTERIOR SIDE SLOPES) PROP. BAFFLE (TYP.) I PROP. CHECK T \ \ DAM (TYP.) EX. DRAINAGE ESMT. / \I \ \ \ X i PROVIDE STABLE TRANSITION AT � / � �� // \ \ DIVERSION DITCH ENTRANCE TO J� �S� / INV: ////' // / OWNER. DEVRIES ERIK \ \ \ SEDIMENT TRAP - LINE THE SLOPE AT // / // 1 421.75 ANKO \ ENTRANCE WITH 12 ROCK RIP RAP PIN: 1842-47-0437 x I \ 415 PROP. MATERIAL / / �� \� EX. 18 RCP 0(Z PROP. SILT FENCE I STAGING ALONG LIMITS OF / ✓ / DISTURBANCE EX. FENCE I� I I I I I I I STOCKPILE AREA `S EX. YI � � / / O TOP: 434.10 ZEX_ BURIED PIPE / INV: 426.35 APPROX. EX. REELINE EX. POWER POLE / — << TD << << TD «� <S—TD�< « TD « �� �" Lw 425 OWNER: CAROLINA TEL AND TEL CO PIN: 1842-26-8528 PROP. TEMP DIVERSION DITCH, TD-1, AS CLEAN WATER DIVERSION 0 0 425 x SD SD 425 LD LD SD SD >> TD >> SF SF -X—X—X—X—X—X—X—X- EX. PROPERTY LINE EX. RIGHT-OF-WAY EX. EASEMENT EX. MAJOR CONTOUR (5) EX. MINOR CONTOUR (1') EX. BARBED WIRE FENCE EX. STORM SEWER EX. TREE LINE PROP. MAJOR CONTOUR (5) PROP. MINOR CONTOUR (1') PROP. LIMIT OF DISTURBANCE PROP. TEMP. PIPE PROP. TEMPORARY DIVERSION DITCH PROP. SILT FENCE PROP. BAFFLE PROP. FAIRCLOTH SKIMMER PROP. CONSTRUCTION ENTRANCE PROP. HORSESHOE INLET PROTECTION CONSTRUCTION SEQUENCE 1. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE LAND DISTURBING ACTIVITIES OCCUR. 2. TIMBERING OR DEMOLITION OF EXISTING STRUCTURES WILL NOT BE ALLOWED UNTIL PLAN IS APPROVED. 3. OBTAIN NCDEQ E&SC PERMIT AND NCG01 COC AND SCHEDULE A PRE -CONSTRUCTION MEETING WITH A RALEIGH REGIONAL OFFICE LAND QUALITY INSPECTOR A MINIMUM OF 72 HOURS PRIOR TO CONSTRUCTION BEGINNING. ADDITIONALLY, THE RALEIGH REGIONAL OFFICE MUST BE NOTIFIED AT LEAST 48 HOURS PRIOR TO COMMENCING LAND DISTURBANCE. CONTACT THE RALEIGH REGIONAL OFFICE AT 919-791-4200. 4. INSTALL CONSTRUCTION ENTRANCE, AND WHEN COMPLETE, INSTALL THE PERIMETER SILT FENCE, TEMPORARY DIVERSION DITCHES, AND SKIMMER BASIN SK-1. UPON COMPLETION OF INSTALLATION, IMMEDIATELY SEED, MULCH, AND ANCHOR EROSION AND SEDIMENTATION CONTROL MEASURES. ALL DITCHES SHALL BE LINED TO THE TOP OF BANK, AND CLEAN WATER DIVERSIONS ARE TO HAVE AN IMPERVIOUS LINER. ANY BARE SOILS BETWEEN DIVERSIONS OR TOE OF SEDIMENT BASIN SLOPES AND PERIMETER EROSION AND SEDIMENT CONTROL MEASURES SHALL BE SEEDED, MUCLHED, AND TACKED. PERIMETER MEASURES SHALL REMAIN IN OPERATING CONDITION DURING ALL PHASES OF CONSTRUCTION. 5. BEGIN CLEARING AND ROUGH GRADING OF SITE. ALL EXCAVATIONS PERFORMED SHALL BE BACKFILLED WITHIN THE SAME DAY WITH SPOIL PLACEMENT ON UPSLOPE SIDE. TEMPORARY DIVERSION DITCHES SHALL BE LINED WITH TEMPORARY LININGS AS SHOWN IN THE TABLE ON SHEET C-2 AND STABILIZED WITHIN 7 DAYS. STOCKPILE/STAGING AREAS AND CONCRETE WASHOUT TO BE WITHIN LIMITS OF DISTURBANCE AND SHOULD BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS, TEMPORARY DIVERSIONS, CHANNELS AND SURFACE WATER BODIES. SLOPES SHALL BE MATTED WITH NAG S75, OR EQUIVALENT. 6. ALL DISTURBED AREAS SHALL BE STABILIZED AND GROUNDCOVER SHALL BE ACHIEVED WITHIN 14 WORKING DAYS AND STEEP SLOPES SHALL BE STABILIZED WITHIN 7 DAYS, PER NPDES CONSTRUCTION STORMWATER GENERAL PERMIT NCG01. 7. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE HTTPS://FlLES.NC.GOV/NCDEQ/ENERGY%20MINERAL%20AND%20LAND%20RESOURCES/ STORMWATER/NPDES%20GENERAL%20PEMLITS/DEMLR-CSW-MON ITORING-FORM-REV- AUGUST-8-2019.PDF. TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. 8. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL E&SC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS WITHIN THIS PLAN SET. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. 9. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT. 10.REMAINING MEASURES MUST BE REMOVED AND RESULTING BARE AREAS STABILIZED BEFORE PERMIT CAN BE CLOSED. ANY DEWATERING IS TO BE DONE THROUGH A SILT BAG WITH A FLOATING INTAKE THAT IS CONSTANTLY MONITORED WHEN IN USE. WON' C •' NDrih' carn��r�a__ NORTH CAROLINA ONE -CALL CENTER 1-800-632-4949 ■ ENGINEERING POST OFFICE BOX 91727 RALEIGH, NORTH CAROLINA 27675 PHONE: 919.610.1051 FIRM NC LICENSE NUMBER C-4222 �W Cqq �O.�FESSI E 033775� �4 A' r� I REVISION HISTORY I REV DESCRIPTION DATE BY # 1 NCDEQ COMMENTS 10/19/2021 FLM ORIGINAL PLAN SIZE: 24" X 36" 30 15 0 30 SCALE: 1 INCH = 30 FEET N SCALE ADJUSTMENT THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 1" I I IF IT IS NOT 1 INCH ON THIS SHEET, ADJUST YOUR SCALE ACCORDINGLY SITE CLEARING PLANS SUNSET DR FRANKLIN COUNTY, NC DATE: 09-09-2021 SCALE: AS SHOWN DESIGNED BY: FLM APPROVED BY: PROJECT NO.: 21041 EROSION &SEDIMENT CONTROL PLAN © 2021 THIS DRAWING SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION OF FLM ENGINEERING, INC. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FRANKLIN COUNTY, NCDEQ, AND NCDOT STANDARDS AND SPECIFICATIONS. C�4 SHEET 4 OF 8 35' MIN. 15' MIN. EXISTING ROADWAY 6" MIN. FABRIC UNDER STONE CROSS SECTION 50' MIN. BUT SUFFICIENT TO KEEP SEDIMENT ON SITE •r 24' OR WIDTH OF EXISTING',• �I 'i•.,'%''tr ".""~"= PROPOSED STREET, 2"-3" STONE TO BE USED (SURGE ROADWAY WHICHEVER IS STONE OR RAILROAD BALLAST) GREATER. PLAN PROVIDE STABLE TRANSITION FROM / \\ TEMPORARY OR PERMANENT DITCH BY J LINING SLOPE WITH 12" RIP RAP A,' NEW CONSTRUCTION ROPE ATTACHED TO SKIMMER AND 12" MIN. ANCHORED TO EMBANKMENT \i� SKIMMER NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. GRAVEL CONSTRUCTION ENTRANCE A I *IF THE TEMPORARY SEDIMENT BASIN WILL BE CONVERTED TO A PERMANENT STORMWATER BASIN OF GREATER DEPTH, THE BAFFLE HEIGHT SHOULD BE BASED ON THE POOL DEPTH DURING USE AS A TEMPORARY SEDIMENT BASIN. NO SCALE 4� PFTwM- OSTSF,I, `\IL�IIJAII� F��NG "HOG WIRE" ATTACHED 1 / TO POSTS WITH y LENGTHS OF WIRE HORIZONTAL METAL POST WIRED SECURELY TO VERTICAL POSTS MAINTENANCE BAFFLE INSTALLATION - STEP 1 INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRE REPAIRS IMMEDIATELY. bE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE \ PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BOTTOM OF BAFFLE IN BAFFLES DURING CLEANOUT, AND TRENCH AND TRENCH FILLED REPLACE IF DAMAGED DURING WITH SOIL AND COMPACTED CLEANOUT OPERATIONS. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. PERSPECTIVE VIEW TOP OF BAFFLE SHOULD BE 6" HIGHER THAN THE BOTTOM OF THE SPILLWAY DRAINAGEAFTER THECONTRIBUTINGBAFFLE INSTALLATION - STEP 2 DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. NOTES: 1. DRIVE STEEL FENCE POST AT LEAST 18" INTO SOLID GROUND. 2. WOOD POSTS ARE NOT ACCEPTABLE. 3. USE STAPLES V APART TO ATTACH FABRIC TO "HOG WIRE." 4. BAFFLE SPACED AS PER APPROVED PLAN. BAFFLE INSTALLATION NO SCALE 2' MIN. COMPACTED SOIL> . . . . . . . . . . . . . . . . . . . . . . . . . 6' TYPICAL TEMPORARY OR PERMANENT DITCH CLASS B STONE PAD 4'X4'XVMIN. EM O EMBANKMENT SKIMMER ROPE ATTACHED TO SKIMMER AND ANCHORED TO EMBANKMENT V MIN. 2 - 1 -III-III-III- SKIMMER SEDIMENT BASIN NO SCALE CONSTRUCTION: PVC END CAP PVC VENT PIPE SCHEDULE 40 MAINTENANCE: PVC ELBOW PVC PIPE 1. CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF ORGANIC MATTER AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL 1. INSPECT SKIMMER/RISER SEDIMENT BASINS AT LEAST ALL OBJECTIONABLE MATERIAL TO THE DESIGNATED DISPOSAL AREA. PLACE TEMPORARY SEDIMENT CONTROL WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR WATERSURFACE 0 MEASURES BELOW BASIN AS NEEDED. GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES PVC END CAP o FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. TO ONE-HALF HEIGHT OF THE FIRST BAFFLE. PULL THE 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY SKIMMER TO ONE SIDE SO THAT SEDIMENT PVC PIPE EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE �" SCHEDULE 40 STONE ENERGY TIMBER. SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND HOLES IN PVC TEE z ORIFICE PLATE PVC PIPE DISSIPATER THE SKIMMER OR THE FIRST CELL. MAKE SURE UNDERSIDE IF RISER BASIN: VEGETATION GROWING IN THE BOTTOM OF THE BASIN PVC TEE DOES NOT HOLD DOWN THE SKIMMER. FLEXIBLE 3.1. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURERS INSTRUCTIONS, OR AS DESIGNED. 2. REPAIR THE BAFFLES IF THEY ARE DAMAGED. HOSE 3.2. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE RISER RE -ANCHOR THE BAFFLES IF WATER IS FLOWING STRUCTURE. ATTACH THE FLEXIBLE JOINT TO THE RISER STRUCTURE AND POSITION THE SKIMMER OVER THE UNDERNEATH OR AROUND THEM. EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. 3. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE BOTTOM SURFACE IS WATER IN THE BASIN, USUALLY JERKING ON THE EMERGENCY SPILLWAY IF SKIMMER BASIN: ROPE WILL WAKE THE SKIMMER BOB UP AND DOWN '- AND THE RESTORE END VIEW FRONT VIEW 3.3. PLACE THE BARREL (TYPICALLY 4-INCH SCHEDULE 40 PVC PIPE) ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS THISDIOESDGE NOTWORK,PRUILLTHD ESKIMMEROVOERTO SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE THE SIDE OF THE BASIN AND REMOVE THE CLOGGED PIPE. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE MAINTENANCE: AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO SKIMMER TO SEE IF IT IS CLOGGED, IF SO REMOVE THE RAISE THE PIPE FROM THE FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. DEBRIS. INSPECT SKIMMERS AT LEAST WEEKLY MINIMUM SAMDE EMBANKMENT. 3.4. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH q IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, AND AFTER EACH SIGNIFICANT (1/2 INCH CONSTRUCTION EQUIPMENT. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION OR GREATER) RAINFALL EVENT AND THE DAM AFTER THE EMBANKMENT IS COMPLETE. CLEARED WITH A PLUMBERS SNAKE OR BY FLUSHING REPAIR IMMEDIATELY. EMERGENCY SPILLWAY 3.5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURERS INSTRUCTIONS OR AS DESIGNED. , WITH WATER. BE SURE AND REPLACE THE ORIFICE 3.6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BEFORE REPOSITIONING THE SKIMMER. IF THE SKIMMER IS CLOGGED WITH 2 BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED TRASH AND THERE IS WATER IN THE 1 PIT OR SUPPORT. BE SURE TO ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS 5. CHECKTHE FABRIC LINED SPILLWAY FOR DAMAGE AND BASIN, USUALLY JERKING ON THE ROPE BARREL PIPE WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT WILL WAKE THE SKIMMER BOB UP AND III = SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE DOWN AND DISLODGE THE DEBRIS AND _ 14. f EARTHEN SPILLWAYS --INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTENT POSSIBLE. THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION RESTORE FLOW. IF THIS DOES NOT -III-I ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING WORK, PULL THE SKIMMER OVER TO THE III- III -III- / CRITICAL TO THE SUCCESSFUL OPERATION OF THE SPILLWAY. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS SIDE OF THE BASIN AND REMOVE THE _ OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS CLOGGED DEBRIS. ALSO CHECK THE SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8-INCH FROM THE SKIMMER AND POOL AREAS. ORIFICE INSIDE THE SKIMMER TO SEE IF III -III -III -III -III IS CLOGGED; IF SO REMOVE THE STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. D DEBRIS. -III-III-III-III-I THE WIDTH OF THE FABRIC MUST BE ONE PIECE, NOT JOINED OR SPLICED; OTHERWISE WATER CAN GET UNDER THE 6. FREEZING WEATHER CAN RESULT IN ICE FORMING IN FABRIC. IF THE LENGTH OF THE FABRIC IS INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY, MULTIPLE SECTIONS, THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE IF THE SKIMMER ARM OR BARREL PIPE IS SPANNING THE COMPLETE WIDTH, MAY BE USED. THE UPPER SECTION(S) SHOULD OVERLAP THE LOWER SECTION(S) SO TAKEN IN THE WINTER TO PREVENT THE SKIMMER CLOGGED, THE ORIFICE CAN BE THAT WATER CANNOT FLOW UNDER THE FABRIC. SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH FROM PLUGGING WITH ICE. REMOVED AND THE OBSTRUCTION STAPLES OR PINS. CLEARED WITH A PLUMBERS SNAKE OR STABILIZED OUTLET 5. INLETS --DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR BY FLUSHING WITH WATER. BE SURE DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT -LADEN WATER TO THE UPPER END OF THE POOL AREA TO AND REPLACE THE ORIFICE BEFORE IMPROVE BASIN TRAP EFFICIENCY. REPOSITIONING THE SKIMMER. 6. EROSION CONTROL --CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL OTHER DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER CONSTRUCTION. 7. INSTALL POROUS BAFFLES. 8. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. SEDIMENT BASIN CONSTRUCTION & MAINTENANCE NOTES PROVIDE STABLE TRANSITION FROM TEMPORARY OR PERMANENT DITCH BY LINING SLOPE WITH 12" RIP RAP COIR FIBER BAFFLES (TYP.) STEEL POSTS (QUANTITY VAR.) RISER STRUCTURE STONE ENERGY f WOOD STAKE DISSIPATOR OR METAL POST SKIMMER (SIZE VAR.) ROPE �N,T 4 PERSPECTIVE VIEW 0 Q Z z O2 g w - TRASH RACK INLET ZONE 25% OF SURFACE AREA FIRST CHAMBER 25 % OF SURFACE AREA SECONDCHAMBER 25 % OF SURFACE AREA OUTLETZONE 25 % OF SURFACE AREA TOP OF EMBANKMENT RISER STRUCTURE SKIMMER EMERGENCY SPILLWAY BARREL PIPE y,5 op�s�oq^ '�L•, - Ti n _ u_ n. a F It 41 STABILIZED ANIT-SEEP ANTIFLOTATION CLASS B STONE PAD OUTLET COLLAR BLOCK BELOW SKIMMER CUT-OFF SECTIONAL VIEW (4x4x1 MIN.' TRENCH 2' DEEP NOTES: 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. 3. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO EMBANKMENT 1 FT. FROM BOTTOM OF BASIN. 4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. SEDIMENT BASIN WITH BAFFLES - SEE CALCULATION TABLE FOR DEPTH, SIDE -SLOPES, FLOW LINERS, ETC NOTES: 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. L /91►11A►1_1►Is] INSPECT TEMPORARY DIVERSIONS AT LEAST WEEKLY AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION DITCH. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND CHENNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. TEMPORARY DIVERSION DITCH NO SCALE NO SCALE MIN. 10 GA. LINE WIRES A, 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE* 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE FRONT VIEW NO SCALE NOTE: SKIMMER TO BE TETHERED O LL /CLASS 1 RIP -RAP (SEE SECTION THRU BASIN BELOW) INVERT CLASS 1 RIP -RAP HEADWALL I I w o �000 0 o FLOW PIP o 0 000000 0o 0 00000OpO�000 00 / SEDIME/V STORAGE AREA -�� #5 WASHED STONE. 1' THICKx 3' HIGH MIN // / / I I \ \\\\ �� 0 PERSPECTIVE VIEW SKIMMER NO SCALE MAINTENANCE INSPECT ROCK DOUGHNUT INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (% INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. TO PROVIDE SATISFACTORY INLET PROTECTION EFFICIENCY, REMOVE SEDIMENT FROM THE SEDIMENT POOL AREA WHEN THE VOLUME IS DECREASED BY HALF. THIS WILL HELP PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN. STABILIZE EXCAVATED MATERIAL APPROPRIATELY. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE STRUCTURE DURING SEDIMENT REMOVAL. REMOVE DEBRIS FROM THE INLET AND REPLACE STONE AS NEEDED. IF THE INLET WAS COVERED WITH WIRE MESH THE MESH SHOULD BE CLEANED OF DEBRIS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND DISPOSE OF SEDIMENT PROPERLY. BRING THE DISTURBED AREA TO THE GRADE OF THE DROP INLET. SMOOTH AND COMPACT IT AS NEEDED. APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET WITH GROUND COVER. NOTES ENGINEERING POST OFFICE BOX 91727 RALEIGH, NORTH CAROLINA 27675 PHONE: 919.610.1051 FIRM NC LICENSE NUMBER C-4222 IIII 1 1 I 'C" ENCLOSURE F �� H C, .. ESSI ` •Nq �. E =_ ENTRY UNIT O33 ,_ ` I �; A' r0 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER SEDIMENT STORAGE EXCAVATION AND DISPOSAL OF SPOIL. PIPIE INVERT, MAX DIA. PIPE IS 36" 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE FLOOD STORAGE ZONE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP AREAS TO BE DISTURBED RIP -RAP HEADWALL (CUT, FILL, ETC.) 1' 2' HIGHER ON EACH END WHERE IT TIES INTO THE = EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIPRAP IIII= I SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 1' °00 U O NATURAL GROUND FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 IIIII F MINIMUM 1 5' 00c �00 000 3' S� $� FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT II�III; <o� o °DOO 00 O FLOW OR DIVERSIONS. 15II III_I II ==11III= DSD FILTER FABRIC 3. A 1 FOOT THICK LAYER OF NC DOT #5 OR #57 STONE -IIIII- CLASS 1 RIP -RAP SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE DIMENSIONS ARE MAX. SEDIMENT DEPTH (CLEAN OUT POINT) RIPRAP. MINIMUM ACCEPTABLE #57 WASHED STONE UNLESS OTHERWISE 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED NOTED. AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. SECTION THRU BASIN, FILTER, AND CULVERT PIPE 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN 12-1/2 GA. RMEDIATE ES GRADE MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL EVENT, MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE o F FILL SLOPE COLLAPSE, TEAR, DECOMPOSE, OR m o WIRE FENCE OPTIONAL IF 6' BECOME INEFFECTIVE, REPLACE IT N STEEL POST SPACING IS USED. PROMPTLY. REMOVE THE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ** FOR REPAIR OF SILT FENCE ADEQUATE STORAGE VOLUME FOR THE m x,a.. GRADE NEXT RAIN AND TO REDUCE PRESSURE FAILURES, USE No. 57 WASHED ON THE FENCE. TAKE CARE TO AVOID 4 _ STONE. FOR ANCHOR WHEN UNDERMINING THE FENCE DURING SILT FENCE IS PROTECTING CLEANOUT. REMOVE ALL FENCING _ SKIRT TRENCH (BACKFILL CATCH BASIN. MATERIALS AND UNSTABLE SEDIMENT o TRENCH AND COMPACT DEPOSITS AND BRING THE AREA TO THOROUGHLY) GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS PLACE 12" OF THE FABRIC ALONG BEEN PROPERLY STABILIZED. THE BOTTOM AND SIDE OF THE TRENCH; EXTEND WIRE 6" MIN. INTO TRENCH - SIDE VIEW NOTES: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 3. INSPECT SILT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 4. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 5. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENCE NO SCALE STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. HORSESHOE ROCK PIPE INLET PROTECTION NO SCALE LENGTH (La) MAINTENANCE INSPECT PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF THE STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. FILTER BLANKET SECTION OUTLET Do 3Do La W RIP RAP d CLASS A SKIMMER 6" 1.5' 6' 4.5' 9„ RIPRAP TEMP. CLASS A 24" 6' g' 6' 9„ PIPE 1 RIPRAP RIPRAP ENERGY DISSIPATOR NO SCALE CALL 48 HOURS BEFORE YOU DIG _ r I NORTH CAROLINA ONE -CALL CENTER 1-800-632-4949 ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FRANKLIN COUNTY, NCDEQ, AND NCDOT STANDARDS AND SPECIFICATIONS. REVISION HISTORY REV DESCRIPTION DATE BY # 1 NCDEQ COMMENTS 10/19/2021 FLM ORIGINAL PLAN SIZE: 24" X 36" SCALE ADJUSTMENT THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 1" I I IF IT IS NOT 1 INCH ON THIS SHEET, ADJUST YOUR SCALE ACCORDINGLY SITE CLEARING PLANS SUNSET DR FRANKLIN COUNTY, NC DATE: 09-09-2021 SCALE: AS SHOWN DESIGNED BY: FLM APPROVED BY: PROJECT NO.: 21041 EROSION & SEDIMENT CONTROL DETAILS C�5 SHEET 5 OF 8 © 2021 THIS DRAWING SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION OF FLM ENGINEERING, INC. FOR DISTURBED AREAS, DITCHES, SHOULDERS, SLOPES (MAX 3:1): DATE TYPE PLANTING RATE AUG 15-NOV 1 TALL FESCUE 300 LBS/ACRE NOV 1-MAR 1 TALL FESCUE & ABRUZZI RYE 300 LBS/ACRE MAR 1-APR 15 TALL FESCUE 300 LBS/ACRE APR 15-JUN 30 HULLED COMMON BERMUDAGRASS 25 LBS/ACRE 125 LBS/ACRE (TALL FESCUE), 35 JUL 1-AUG 15 TALL FESCUE AND BROWNTOP MILLET LBS/ACRE (BROWNTOP MILLET), 30 OR SORGHUM-SUDAN HYBRIDS *** LBS/ACRE (SORGHUM-SUDAN HYBRIDS) *** TEMPORARY: RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW MORE THAN 12, IN HEIGHT BEFORE MOWING; OTHERWISE, FESCUE MAY BE SHADED OUT. FOR DISTURBED AREAS, DITCHES, SHOULDERS, SLOPES (3:1 TO 2:1): DATE TYPE PLANTING RATE SERICEA LESPEDEZA (SCARIFIED) AND MAR 1 - JUN 1 USE THE FOLLOWING COMBINATIONS: 50 LBS/ACRE MAR 1 - APR 15 ADD TALL FESCUE 120 LBS/ACRE MAR 1 - JUN 30 OR ADD WEEPING LOVE GRASS 10 LBS/ACRE OR ADD HULLED COMMON MAR 1 -JUN 30 25 LBS/ACRE BERMUDAGRASS 120 LBS/ACRE (TALL FESCUE); 35 JUN 1 - SEPT 1 TALL FESCUE AND BROWNTOP MILLET LBS/ACRE (BROWNTOP MILLET); 30 OR SORGHUM-SUDAN HYBRIDS *** LBS/ACRE (SORGHUM-SUDAN HYBRIDS) SERICEA LESPEDEZA (UNHULLED - 70 LBS/ACRE (SERICEA LESPEDEZA), SEPT 1 - MAR 1 UNSCARIFIED) AND TALL FESCUE 120 LBS/ACRE (TALL FESCUE) NOV 1 - MAR 1 AND ABRUZZI RYE 25 LBS/ACRE *** TEMPORARY: RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW MORE THAN 12IN HEIGHT BEFORE MOWING, OTHERWISE, FESCUE MAY BE SHADED OUT. MIXTURE AGRICULTURAL 2 TONS/ACRE (3 TONS/ACRE LIMESTONE IN CLAY SOILS) FERTILIZER 1,000 LBS/ACRE - 10-10-10 500 LBS/ACRE - 20% SUPERPHOSPHATE ANALYSIS 2 TONS/ACRE - SMALL GRAIN MULCH STRAW ASPHALT EMULSION AT 300 ANCHOR GALS/ACRE FOR LATE WINTER AND SOIL AMENDMENTS EARLY SPRING: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 3 TON/ACRE (6,000 LB/ACRE) GROUND AGRICULTURAL SEEDING MIXTURE. LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER RYE (GRAIN) - 120 LB/ACRE ANNUAL LESPEDEZA* (KOBE IN PIEDMONT AND MULCH: COASTAL PLAIN, KOREAN IN MOUNTAINS) - 50 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH 400 GALLONS/ACRE OF ASPHALT *OMIT ANNUAL LESPEDEZA WHEN DURATION OF EMULSION, NETTING, OR A MULCH ANCHORING TOOL. TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE MAINTENANCE: SEEDING DATES. REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. MOUNTAINS: ABOVE 2500 FEET: FEB. 15 - MAY 15 RESEED, REFERTILIZE, AND MULCH IMMEDIATELY BELOW 2500 FEET: FEB. 1 -MAY 1 FOLLOWING EROSION OR OTHER DAMAGE PIEDMONT: JAN. 1 - MAY 1 COASTAL PLAIN: DEC. 1 -APR. 15 FOR SUMMER: SEEDING MIXTURE. GERMAN MILLET*- 40 LB/ACRE *IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE SEEDING DATES: MOUNTAINS: MAY 15 -AUG. 15 PIEDMONT: MAY 1 -AUG. 15 COASTAL PLAIN: APR. 15 -AUG. 15 SOIL AMENDMENTS. FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 3 TON/ACRE (6,000 LB/ACRE) GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH 400 GALLONS/ACRE OF ASPHALT EMULSION, NETTING, OR A MULCH ANCHORING TOOL. REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE FOR FALL: SOIL AMENDMENTS. FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY SEEDING MIXTURE: 3 TONS/ACRE (6,000 LB/ACRE) GROUND AGRICULTURAL RYE (GRAIN) - 120 LB/ACRE LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER SEEDING DATES: MULCH: MOUNTAINS: AUG. 15 -DEC. 15 COASTAL PLAIN AND PIEDMONT: AUG. 15 - DEC. 30 APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH 400 GALLONS/ACRE OF ASPHALT EMULSION, NETTING, OR A MULCH ANCHORING TOOL. REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. SEEDBED PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF SEEDBED PREPARATION: AVAILABLE. LIMING - APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. NOT KNOWN, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE 6.106 RATE OF 1 TO 1 1/2 TONS/ACRE ON COARSE -TEXTURED SOILS AND 2-3 TONS/ACRE ON FINETEXTURED SOILS IS USUALLY 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND SUFFICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS UNIFORM. WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. 4. APPLY AGRICULTURAL LIME, FERTILIZER AN SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (*SEE BELOW). FERTILIZER - BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT POSSIBLE, APPLY A 10-10-10 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX GRADE FERTILIZER AT 700-1,000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE INCHES DEEP. TOP 4-6 INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. SURFACE ROUGHENING - IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 31 ON THE CONTOUR BEFORE SEEDING (PRACTICE 6.03, SURFACE ROUGHENING). 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. *APPLY: AGRICULTURAL LIMESTONE- 2 TONS/ACRE MINIMUM OR PER SOIL TEST TEMPORARY SEEDING SCHEDULE FERTILIZER - 10-10-10 ANALYSIS @ 1,000 LBS/ACRE NO SCALE SUPERPHOSPHATE - 500 LBS/ACRE OF 20% ANALYSIS MULCH - 2 TONS (+/- 80 BALES) STRAW/ACRE ANCHOR - USE LIQUID ASPHALT @ 400 GALS/ACRE OR EMULSIFIED ASPHALT @ 300 GALS/ACRE PERMANENT SEEDING SCHEDULE NO SCALE ....T ... ........... i NOTES: - 2"-5" (5 CM-12.5 CM) W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W MATTING TO BE INSTALLED PER PLAN -12"- (30 CM) 1 I 6" I (15 CM) -6"-I 2 (15 CM) O 3CM) r(7!5 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30Cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON BLANKET TYPE. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: "IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. DETAIL AND LANGUAGE PROVIDED BY NORTH AMERICAN GREEN REV. 1/2004 MAINTENANCE: 1. INSPECT SLOPE MATTING AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (Z INCH OR GREATER) RAIN FALL EVENT. REPAIR IMMEDIATELY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE SLOPE MATTING. 3. ANY AREAS OF THE SLOPE MATTING THAT ARE DAMAGED OR NOT INCLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE SLOPE MATTING AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. SLOPE INSTALLATION NO SCALE 40 R ROLLMAK" ROLLED EROSION CONTROL Specification Sheet - VMax° SC2S01 Turf Reinforcement Mat DESCRIPTION The composite turf reinforcement mat (C-TRM) shall be a ma- chine -produced mat of 70% straw and 30% coconut fiber matrix 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30Cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON BLANKET TYPE. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: "IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. DETAIL AND LANGUAGE PROVIDED BY NORTH AMERICAN GREEN REV. 1/2004 MAINTENANCE: 1. INSPECT SLOPE MATTING AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (Z INCH OR GREATER) RAIN FALL EVENT. REPAIR IMMEDIATELY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE SLOPE MATTING. 3. ANY AREAS OF THE SLOPE MATTING THAT ARE DAMAGED OR NOT INCLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE SLOPE MATTING AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. SLOPE INSTALLATION NO SCALE 40 R ROLLMAK" ROLLED EROSION CONTROL Specification Sheet - VMax° SC2S01 Turf Reinforcement Mat DESCRIPTION The composite turf reinforcement mat (C-TRM) shall be a ma- chine -produced mat of 70% straw and 30% coconut fiber matrix Thickness ASTM D6525 0.62 in. Incorporated into permanent three-dimensional turf reinforce- (15.7S mm) ment matting. The matrix shall be evenly distributed across the Resiliency ASTM 6524 95.2% entire width of the matting and stitch bonded between a heavy Density ASTM 0792 0.891 g/cma duty UV stabilized nettings with 0.50 x 0.50 inch (1.27 x 1.27 cm) openings, an ultra heavy UV stabilized, dramatically corrugated Mass/Unit Area ASTM 6566 16.13 oz/sy (crimped) intermediate netting with 0.5 x 0.5 inch (1.27 x 1.27 cm) 1548 g/sm) openings, and covered by an heavy duty UV stabilized nettings ASTM 04355/ with 0,50 x 0.50 inch (1.27 x 1.27 Cm) openings. The middle UV Stability ty 1000 HR 100% corrugated netting shall form prominent closely spaced ridges Porosity ECTC Guidelines 99% across the entire width of the mat. The three nettings shall he stitched together on 1.50 inch (3.81cm) centers with UV stabilized Stiffness ASTM 01388 222.65 oz-in. polypropylene thread to form permanent three-dimensional turf reinforcement matting. All mats shall he manufactured with Light Penetration ASTM D6567 4.1% a colored thread stitched along both outer edges as an overlap guide for adjacent mats. Tensile Strength - MD ASTM 06818 709lbs/ft (10.51 kN/m) The SC250 shall meet Type SA, SE, and SC specification require- Elongation - MD ASTM D6818 23.9% ments established bythe Erosion Control Technology Council (ECTC) and Federal Highway Administration's (FHWA) FP-03 Tensile Strength - TO ASTM 06818 7121bs/ft Section 713.18 (10.56 kN/m) Elongation - TO ASTM 06818 36.9% 70%Straw Fiber 0.351b/sq yd Biomass Improvement ASTM D7322 441% Matrix (0,19 kg/sm) 30% Coconut Fiber 0.15 Ibs/sq yd (0.08 kg/sm) Top and Bottom, UV -Stabilized 51b/1000 sq ft r Polypropylene (2.44 kg/too sm) Netting Short Duration Long Duration Middle, Corrugated UV -Stabilized 24 lb/1000 sf Polypropylene h1.7 kg/too sm) Phase 1: Unvegetated 3.0 psf (144 Pa) 2.5 psf (120 Pa) Thread Polypropylene, UV Stable Phase 2: Partially Vag. 8.0 psf (383 Pa) 8.0 psf (383 Pa) Phase 3: Fully Veg. 10.0 psf (480 Pa) 8.0 psf (383 Pa) Unvegetated Velocity 9.5 fps (2.9 ni Width 6.5 ft (2.0 m) Vegetated Velocity 15 fps (4.6 m/s) Length 55.5it(16.9 m) Weight ±10 % 34lbs (15.42 kg) Area 40 sq yd (33.4 sm) NORTH AMERICAN GREEN SC250 EROSION CONTROL BLANKET NO SCALE gt,-� AII ^,I , -4 NOTES 1. ALL SLOPES GREATER THAN 3:1 MUST BE PREPARED VIA SURFACE ROUGHENING (VIA STAIR -STEP GRADING, GROOVING, OR TRACKING) TO FACILITATE STABILIZATION, UNLESS AN EROSION CONTROL BLANKET WILL BE USED. 2. IMMEDIATELY SEED AND MULCH ROUGHENED AREAS TO OBTAIN OPTIMUM SEED GERMINATION AND GROWTH. 3. LIMIT ROUGHENING WITH TRACKED MACHINERY TO SANDY SOILS TO AVOID UNDUE COMPACTION OF THE SOIL SURFACE. 4. PERIODICALLY CHECK THE SEEDED SLOPES FOR RILLS AND WASHES. FILL THESE AREAS SLIGHTLY ABOVE THE ORIGINAL GRADE, THEN RESEED AND MULCH AS SOON AS POSSIBLE. SURFACE ROUGHENING NO SCALE GRAVEL R ROLLMAK" WIT ROLLED EROSION CONTROL Specification Sheet - EroNet" S7S1 Erosion Control Blanket DESCRIPTION The short-term single net erosion control blanket shall be a machine- o.5o in. produced mat of 100p7o agricultural straw with a functional longevity Thickness ASTM 06525 (12.7 mm) of up to 12 months. (NOTE: functional longevity may vary depending Resiliency ECTC Guidelines 78.8 % upon climatic conditions, soil, geographical location, and elevation). Water Absorbency ASTM D1117 301% The blanket shall he of consistent thickness with the straw evenly Mass/Unit Area ASTM 06475 9.76 oz/sy distributed over the entire area of the mat, The blanket shall be (332 g/sm) covered on the top side with a lightweight photodegradable Swell ECTC Guidelines 5% polypropylene netting having an approximate 0.50 x 0.50 in. (1.27 x Smolder Resistance ECTC Guidelines yes 1.27 cm) mesh. The blanket shall be sewn together on 1.50 inch (3.81 Stiffness ASTM D1388 6.81 cl cm) centers with degradable thread. The blanket shall be manufac- Light Penetration ASTM D6567 6.0% tured with a colored thread stitched along both outer edges (approxi- 122.41bs/ft mately 2-5 inches IS-12,5 cm] from the edge) as an overlap guide for Tensile Strength - MO ASTM D6818 (1,81 kN/m) adjacent mats. Elongation - MO ASTM D6818 36.1% 79.2 Its/ft The S75 shall meet Type LC specification requirements established by Tensile Strength - TO ASTM D6818 (1.171(N/m) the Erosion Control Technology Council (ECTC) and Federal Highway Administration's (FHWA) FP-03 Section 713.17 Elongation - TO ASTM D6818 26.8% Biomass Improvement ASTM 07322 307% Matrix 100%Straw Fiber 0.5lbs/sq yd (0.27 kg/sm) Unvegetated Shear " Stress 1.55 psf (74 Pa) Netting Top side only, lightweight 1.5 Ib/1000 sq ft Unvegetated Velocity 5.00 fps (1.52 m/s) photodegradable (0.73 kg/100 sm) Thread degradable p p •8.11 Slope Gradients (5) Width 6.67 ft (2.03 m) ft(2.4 m) 16 ft (4.87 m) Slope Length (L) < 3:1 3:1- 2:1 >_ 2:1 - 20 ft (6 m) 0,029 N/A N/A Length 108 ft (32.92 m) 112 ft (34.14 m) 108 ft (32.92 m) 20-SO ft 0.11 N/A N/A Weight ± 10% 40 Ibs (18.14 kg) 50 Its; (22.68 kg) 961hs (43.54 kg) >- 50 ft (15.2 m) 0.19 N/A N/A 100 sq yd 100 yd 192 sq yd NTPEP Large -Scale Slope Testing Area 80 sq yd (66.9 sm) (165.5 sm) ASTM D6459 - 0-factor = 0.012 Flow Depth Manning's n <- 0.50 ft(0.15 m) 0.Oss 0.50 - 2.0 ft 0.055-0.021 >- 2.0 ft (0.60 m) 0.021 Tensor International Corporation Suite 500 hwinds Parkway Tensacr Alpharetta, GA 30009 NORTH AMERICAN GREEN' e rsarcu p.co tensartorp.mm Tensor mtemational corporation warrants that at the time of delil the product furnished hereuntler shall conform to the specification stated herein. Any other warranty inducting erchantahlllty and fitness for a particular purpose, are hereby executed. If the product does not meet spedficationson this pageand Tenser is notified prior to Installation, Tensar will replace the product at no cost to the customer. This product specifiatian supersedes all prior specifications for the product des,ribedaboveand isnotappi le toany pn,ducts shipped prior ro lanoary1, 2012. 02013, Tensar International corporation EC RMX MPOS ES7s 6.13 NORTH AMERICAN GREEN S75 EROSION WELL VEGETATED OR OTHERWISE STABILIZED AREA GRAVEL PAD CONTROL BLANKET NO SCALE FILTER BAG r VlVlr CLAMPS I91LTAI SILT BAG NO SCALE FILTER BAGS MAY BE USED TO FILTER WATER PUMPED FROM EXCAVATIONS PRIOR TO DISCHARGING. FILTER BAGS SHALL BE MADE FROM NON -WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR% THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHOULD BE FLOATING AND SCREENED. FILTER BAGS SHALL BE LOCATED IN WELL -VEGETATED (GRASSY) AREAS AND DISCHARGED ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE FLOW PATH SHALL BE PROVIDED. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE FILTER BAG IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY FLOATING BECOMEY2 FULL. SPARE REPLACEMENT BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE INTAKE FAILED OR ARE % FULL. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED. CALL 48 HOURS BEFORE YOU DIG _ r i NORTH CAROLINA ONE -CALL CENTER 1-800-632-4949 ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FRANKLIN COUNTY, NCDEQ, AND NCDOT STANDARDS AND SPECIFICATIONS. ENGIN EERING POST OFFICE BOX 91727 RALEIGH, NORTH CAROLINA 27675 PHONE: 919.610.1051 FIRM NC LICENSE NUMBER C-4222 ``, 111111 i1f,f77 �-1 CAq O . FESSI Q E 0337705 lc ) °I,- ' 29 NGI NEEP. • T• ..... •fit.. REVISION HISTORY REV DESCRIPTION DATE BY 1 NCDEQ COMMENTS 10/19/2021 FLM ORIGINAL PLAN SIZE: 24" X 36" SCALE ADJUSTMENT THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 1" I I IF IT IS NOT 1 INCH ON THIS SHEET, ADJUST YOUR SCALE ACCORDINGLY SITE CLEARING PLANS SUNSET DR FRANKLIN COUNTY, NC DATE: 09-09-2021 SCALE: AS SHOWN DESIGNED BY: FLM APPROVED BY: PROJECT NO.: 21041 EROSION &SEDIMENT CONTROL DETAILS C�6 SHEET 6 OF 8 © 2021 THIS DRAWING SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION OF FLM ENGINEERING, INC. ■ GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A 3O O O OC SANDBAGS (TYP.) O O OR STAPLES 10 MIL O SILT FENCE SIDE SLOP LPILSTC SANDBAGS (TYP.) O 5 00 0 OR STAPLES (TYP `I �< Oo C A CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS ■ SANDBAGS (TYP.) OG STAPLES ION SOMAUSrI ENGINEERING A.1 SIDELB I (TYP-) SECTION B-BI SANDBAGS (TYP.) NOTES: OR STAPLES 1. ACTUAL LOCATION DETERMINED IN FIELD CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) 2. THE CONCRETE WASHOUT WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 PLAN INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 WON ' C •' N 0 rt�� car"IIna NORTH CAROLINA ONE -CALL CENTER 1-800-632-4949 POST OFFICE BOX 91727 RALEIGH, NORTH CAROLINA 27675 PHONE: 919.610.1051 FIRM NC LICENSE NUMBER C-4222 �H C. �OQ�FESSI E = O. 030i &\ I �: z 4A REVISION HISTORY REV DESCRIPTION DATE BY 1 NCDEQ COMMENTS 10/19/2021 FLM ORIGINAL PLAN SIZE: 24" X 36" SCALE ADJUSTMENT THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 1" I I IF IT IS NOT 1 INCH ON THIS SHEET, ADJUST YOUR SCALE ACCORDINGLY SITE CLEARING PLANS SUNSET DR FRANKLIN COUNTY, NC DATE: 09-09-2021 SCALE: AS SHOWN DESIGNED BY: FLM APPROVED BY: PROJECT NO.: 21041 NCGO1 SELF -INSPECTION, RECORDKEEPING & REPORTING © 2021 THIS DRAWING SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION OF FLM ENGINEERING, INC. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FRANKLIN COUNTY, NCDEQ, AND NCDOT STANDARDS AND SPECIFICATIONS. G7 SHEET 7 OF 8 PART III PART III PART III ■ SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of Stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment e Within 24 hours, an oral or electronic notification. deposition in a e Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated . A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions a Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 MOM C •' N 0 rt�� car"IInsna NORTH CAROLINA ONE -CALL CENTER 1-800-632-4949 E ENGINEERING POST OFFICE BOX 91727 RALEIGH, NORTH CAROLINA 27675 PHONE: 919.610.1051 FIRM NC LICENSE NUMBER C-4222 �H Cqq P FESSI E = =_ O. 03377o 5 I.Q 4A, REVISION HISTORY REV DESCRIPTION DATE BY 1 NCDEQ COMMENTS 10/19/2021 FILM ORIGINAL PLAN SIZE: 24" X 36" SCALE ADJUSTMENT THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 1" I I IF IT IS NOT 1 INCH ON THIS SHEET, ADJUST YOUR SCALE ACCORDINGLY SITE CLEARING PLANS SUNSET DR FRANKLIN COUNTY, NC DATE: I 09-09-2021 SCALE: AS SHOWN DESIGNED BY: FILM APPROVED BY: PROJECT NO.: 21041 NCGO1 GROUND STABILIZATION & MATERIAL HANDLING © 2021 THIS DRAWING SHALL NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION OF FLM ENGINEERING, INC. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FRANKLIN COUNTY, NCDEQ, AND NCDOT STANDARDS AND SPECIFICATIONS. C-8 SHEET 8 OF 8