Loading...
HomeMy WebLinkAbout20201510 Ver 1_B-5624 10-25-21 UBO Clearing Survey_20211025 (2)From:Farrell, Sean C To:Shaver, Brad E CIV USARMY CESAW (US); Sprinkle, Hannah H; Westphal, Anneliese; Herndon, T. Mason Subject:Fw: B-5624 10-25-21 UBO Clearing Survey Date:Monday, October 25, 2021 3:29:20 PM Attachments:B-5624 10-25-21 UBO Clearing Survey.pdf B-5624 Utilities.pdf 20211025 Pictures.pdf Brad and Hannah, We are still working to determine why the clearing occurred at this stage. Thankfully it does not appear to extend beyond the limits of temporary impact permitted for the detour. I have asked ATMC to get out tomorrow with hand tools to retrieve the plume of material that appears to have eroded from the bore pit on the shoulder. We have a meeting tomorrow morning with Construction and Environmental staff to draft changes to standard operating procedures related to oversight of utility relocations. I will keep you updated with those developments. I will also send photos of the cleanup and one of us can take you out there whenever works with your schedules. Thanks, Sean From: Stewart, Alex D <adstewart2@ncdot.gov> Sent: Monday, October 25, 2021 1:57 PM To: Farrell, Sean C <scfarrell@ncdot.gov>; Koltiska, Jake <jkoltiska@ncdot.gov> Cc: Bailey, John L <jlbailey@ncdot.gov>; McBryan, Sean R <srmcbryan@ncdot.gov>; Westphal, Anneliese <awestphal@ncdot.gov>; Jetton, Joseph C <jcjetton@ncdot.gov>; Rivenbark, Jason A <jarivenbark1@ncdot.gov>; Sleeper, Lonny A <lasleeper@ncdot.gov> Subject: RE: B-5624 10-25-21 UBO Clearing Survey Sean: See the attached UBO clearing survey, UBO plans, and pictures that Sean and John took of the location earlier today. All of the clearing that took place appears to fall within the temporary fill in wetlands area and there will be additional clearing that will take place during the life of this project. Jake: Please coordinate with ATMC to have them recover the lost material and pursue vegetation efforts through coordination with the agencies as soon as possible. Thank you, Alex D. Stewart, PE Resident Engineer Resident Engineer’s Office - Wilmington (910) 231-6528 cell From: McBryan, Sean R <srmcbryan@ncdot.gov> Sent: Monday, October 25, 2021 1:18 PM To: Stewart, Alex D <adstewart2@ncdot.gov>; Koltiska, Jake <jkoltiska@ncdot.gov> Cc: Bailey, John L <jlbailey@ncdot.gov> Subject: B-5624 10-25-21 UBO Clearing Survey Good afternoon Alex and Jake, Please see the attached survey of the clearing performed by UBO contractors for the B-5624 project. You will see that we cleared 0.133 AC in a “Temporary Fill in the Wetland Area” and 0.073 AC in a “Non-wetland Area.” Also, John took some pictures of the cleared area at the time of this survey. There are quite a few, so is there a spot that we can upload them to on the S drive that would be easy for everyone to access? Thank you, Sean McBryan Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.