Loading...
HomeMy WebLinkAbout20201510 Ver 1_B-5624 Utilities_20211025Submitted 6/3/2021 0 50'25'50' SCALE: 1"=100' 100' DATE: 03-11-2021 SHEET 2 OF 4 PERMIT DRAWING REVISIONS SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/99B-5624 100 NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 40 50 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$60 70 80 90 100 90 80 70 60 50 40 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 915 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 NC COA No. C-0890 SUNGATE DESIGN GROUP, P.A. 10 11 12 13 14 15 16 17 18 19 20 21 BRIDGE APPROACH SLABNAD 8 3/NA 2 0 0 1 FOR -LDET- SEE SHEET NO. 2B-1SEE SHEET UO5MATCHLINE -L- POT STA. 21+00.00UO-2 04 SITE 4 SITE 2 SITE 1 SITE 2 SITE 3 SITE 5 RED MOUNTAIN TIMBERCO II LLC THE NATURE CONSERVANCY THE NATURE CONSERVANCY THE NATURE CONSERVANCY EOI FO MARKER FO MARKER FO MARKER MTL MTL MTL MTLDRIVING CREEKWOODS 7:25AM 3/18/2017 WATER LEVEL = 56.90' AT TIME OF SURVEY 150.00'EXISTING R/W EXISTING R/W WOODS WOODS WOODS BST VARIES NC 211 - GREEN SWAMP RD NW 20 (-L-)15 (-L-)+58.88+96.38+33.121 2 20 (-LDET-)15 (-LDET-)2GI 2GI 2GI 2GI 15" RCP-IV 15" RCP-IV GTD GTD GTD GTD GTD EXISTING GROUND PROPOSED GRADEDS = >80 mph DS = 60 mph STA 10+44.20 BEGIN OVERLAY EL. 64.83 STA 12+00.00 BEGIN GRADE END OVERLAY PI = 12+95.00 EL = 65.12' (+)0.3053%(+)0.9046% VC = 180' K = 300 PI = 16+83.00 EL = 68.63' (+)0.9046%(-)0.5862% VC = 230' K = 154 R/R SPIKE SET IN 10" CEDAR 39.93' RT, EL. 62.57' -L- STA. 17+72.07 BM #1 R/R SPIKE SET IN 10" OAK 36.37' LT, EL. 65.22' -L- STA. 19+79.32 BM #2 -L- SKEW=90 DEG W/ 4.0' END BENT CAPS 1@85', 45" PSCG CL GP EL=68.17 CL STA 17+46 -L-, 12'12'12'12'PS4'PS4'PS8'PS4'PS8'PS8'PS8'+13.50C C C C C C C C C F F F F F F F F F F F F F F F C F C C C C C C MCNC MIN 10' DEEP MIN. ROLL PIPE @ 5' 3X1.25" SDR 11 STREAM BED DEEP BENEATH ROLL PIPE @ 10' 3X1.25" SDR 11 DEEP MIN. ROLL PIPE @ 5' 3X1.25" SDR 11 INTERCEPT EXISTING MCNC NEW HANDHOLE TO ATMC MCNC MCNC HH ATMC AT&T AT&T ABANDONED HH EXISTING AT&T HH TO INTERCEPT EXISTING ATMC HH TO INTERCEPT BELOW STREAM MCNC 10' MINIMUM BELOW STREAM AT&T 10' MINIMUM ABANDONED ABANDONED HH ATMC AT&T TRENCH OPEN TRENCH OPEN TRENCH OPEN HDD DRILL HDD DRILL HDD DRILL MCNC BOREBOUNDARYWETLAND ATMC BOREBOUNDARYWETLAND AT&T BOREBOUNDARYWETLAND MCNC TRENCH OPEN HDD DRILL TRENCH OPEN HDD DRILL TRENCH OPEN HDD DRILL HANDHOLE PLACEMENT 3'X3'X3' BORE PIT & ATMC FROM EXISTING EOP AT&T 5'X 6' BORE PIT 8' INTERCEPT EXISTING MCNC NEW HANDHOLE TO MCNC 4'X4'X3' BORE PIT Submitted 7/19/21 0 50'25'50' SCALE: 1"=100' 100' SHEET 3 OF 4 PERMIT DRAWING DATE: 03-11-2021 REVISIONS SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8/17/99B-5624 100 NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 40 50 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$60 70 80 90 100 90 80 70 60 50 40 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 915 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 NC COA No. C-0890 SUNGATE DESIGN GROUP, P.A. 21 22 23 24 25 NAD 8 3/NA 2 0 0 1 FOR -LDET- SEE SHEET NO. 2B-2 UO3 SEE SHEET UO4MATCHLINE -L- POT STA. 21+00.00SITE 5 SITE 3 EOI FO MARKER WOODS WOODS THE NATURE CONSERVANCY 150.00'EXISTING R/W EXISTING R/W THE NATURE CONSERVANCY NC 211 - GREEN SWAMP RD NW BST VARIES (TYP) 27'25 (-L-)+00.00+23.002 GTD EXISTING GROUND PROPOSED GRADE (-)0.5862%PS4'PS4'12'12'C C C F F F F F F C F F DEEP MIN. ROLL PIPE @ 5' 3X1.25" SDR 11 INTERCEPT EXISTING MCNC NEW HANDHOLE TO MCNC HH ATMC AT&T ABANDONED HH EXISTING AT&T HH TO INTERCEPT EXISTING ATMC HH TO INTERCEPT HH TRENCH OPEN TRENCH OPEN TRENCH OPEN HDD DRILL HDD DRILL HDD DRILL MCNC BOREBOUNDARYWETLAND ATMC BOREBOUNDARYWETLAND AT&T BOREBOUNDARYWETLAND AT&T ATMC TRENCH OPEN HDD DRILL HDD DRILL TRENCH OPEN TRENCH OPENHDD DRILL INTERCEPT EXISTING MCNC NEW HANDHOLE TO MCNC 4'X4'X3' BORE PIT HANDHOLE PLACEMENT 3'X3'X3' BORE PIT & ATMC FROM EXISTING EOP AT&T 5'X 6' BORE PIT 8' Submitted 6/3/2021 B-5624 NEU ENVIRONMENTAL PERMIT NARRATIVE AT&T (Telephone): AT&T has an U/G fiber optic cable is in conflict throughout the project along the (North side) of NC 211 (Green Swamp Road). AT&T is encroaching within the NCDOT R/W. AT&T will place a new U/G conduit (fiber optic) cable that follows along the (North side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+82 +/- and -L- Sta. 24+39 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Yuri Moody; Email yuri.moody@genxcgroup.com, Phone 786-519-4809. ATMC (Telephone): ATMC has an U/G fiber optic cable is in conflict throughout the project along the (South side) of NC 211 (Green Swamp Road). ATMC is encroaching within the NCDOT R/W. ATMC will place a new U/G conduit (fiber optic) cable that follows along the (South side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+82 +/- and -L- Sta. 24+39 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Michael Barry; Email bmichael@atmc.com; Phone 910-755-1709. MCNC (Telephone): MCNC has an U/G fiber optic cable is in conflict throughout the project along the (North side) of NC 211 (Green Swamp Road). MCNC is encroaching within the NCDOT R/W. MCNC will place a new U/G conduit (fiber optic) cable that follows along the (North side) of NC 211 (Green Swamp Road) inside the NCDOT R/W by directional bore and trenching. New cables will tie back into existing lines by placing two new handholes at the bore pit locations. Handhole locations are at -L- Sta. 10+30 +/- and -L- Sta. 25+05 +/-. This bore will produce no permanent impacts to the wetlands. All stations are approximate in this report. Contact: Mr. Brett Boger; Email brettboger@telics.com Phone 336 -692-6477. Conclusion (Total Impacts due to Utilities): Permanent Fill in Wetlands 0.00 acres Hand Clearing in Wetlands 0.00 acres Submitted 6/3/2021