Loading...
HomeMy WebLinkAbout20211555 Ver 1_Pre-Filing Meeting Information_20211025Submission Completed Page 1 of 2 DWR Pre -Filing Meeting Request Form Contact Name * Contact Email Address* Project Owner* Project Name* Project County* Owner Address: * Is this a transportation project?* Yes No NORTH CAROLINA Enrlrnnmertfal Quality Kevin Thomas Kthomas@cecinc.com Aberdeen Carolina & Western Railway (ACWR) Midland East Rail Yard Cabarrus Street Address 967 NC Hwy 211 E. Address Line 2 City Candor Postal / Zip Code 27229 Type(s) of approval sought from the DWR: © 401 Water Quality Certification - Regular ❑ Individual Permit ❑ Shoreline Stabilization Does this project have an existing project ID#? * Q Yes No State / Province / Region NC Country USA Please list all existing project ID's associated with this projects.* SAW-2011-00854 ❑ 401 Water Quality Certificc ❑ Modification https:Hedocs.deq.nc.govIForms/Formishowformsubmission/d8363 dOd-699a-4b75-b99f-ad... 8/19/2021 Submission Completed Page 2 of 2 Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* The proposed project involves the construction of a transload rail yard to serve the ACWR Midland East s NC HWY 24/27 W in the Town of Midland, Cabarrus County, North Carolina. The proposed transload rail constructed in the southern portion of the property adjacent to the existing rail line. **This is NOT a DOT project; however, I had to select Yes for transportation project in order to attach files **A Schweinitz's Sunflower survey will be conducted within the USFWS optimal survey window, as reques PM Krysta Stygar.** Please attach the documentation you would like to have the meeting about. PJD SAW 201100854v3.pdf 2.53MB Draft —Midland East - 2 Facility - Syn... 1.97MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * E Vl,l T+-/v*,}5 Submittal Date 8/19/2021 https:Hedocs.deq.nc.govIForms/Formishowformsubmission/d8363 dOd-699a-4b75-b99f-ad... 8/19/2021