Loading...
HomeMy WebLinkAboutFSM worksheet_Har 54NORTH CAROLINA DEPARTMENT OF TRANSPORTATION FIELD SCOPING MEETING WORKSHEET Design-Bid-Build Process TIP No.: N/A WBS No.: BP6.R017 Field Scoping Meeting Date: 10/27/2021  Division: 6 Location: Virtual with site visits prior to FSM  Route: SR 1130 (Norrington Rd) County: Harnett  Project Description: Replace Bridge No. 54 over Big Gully on SR 1130  Tier: Sub-Regional Funding: State  Municipality: N/A  Attendees   Name Phone No. Email  Division Project Development Engineer Steve Kendall 910-364-0603 sdkendall@ncdot.gov  Div. Bridge Program Manager (outgoing) Christy Huff 910-364-0682 chuff@ncdot.gov  Div. Bridge Program Manager (incoming) Adam Britt 910-364-0696 atbritt@ncdot.gov  Asst Div. Bridge Program Manager Jason Hatfield 910-364-0694 jrhatfield@ncdot.gov  Resident Engineer Donavon Hunt 910-364-0608 dhunt3@ncdot.gov  Division Bridge Maintenance Mike Fisher 910-364-0670 mdfisher@ncdot.gov  Division Environmental Officer Greg Price 910-364-0603 gwprice2@ncdot.gov  Division Utility Coordinator John Walters 910-639-7345 jcwalters@ncdot.gov  Simpson Engineers, Project Manager David Simpson  dsimpson@simpsonengr.com  Simpson Engineers Martha Register  mregister@simpsonengr.com  Simpson Engineers Mark Averette  maverette@simpsonengr.com  Simpson Engineers Sandra Stepney  sstepney@simpsonengr.com  Mott McDonald Tim Jordan  Tim.Jordan@mottmac.com  VHB Engineering Frank Fleming  ffleming@vhb.com  VHB Engineering Brandon Barham  bbarham@vhb.com  Subsurface Utility Engineering (SAM) Freddie Bunn  fbunn@sam.biz  Subsurface Utility Engineering (SAM) Matthew Ward  Matthew.Ward@sam.biz  HDR, INC Kenneth Bussey  Kenneth.Bussey@hdrinc.com  HDR, INC Rzepka, Mike  Mike.Rzepka@hdrinc.com       Gary Jordan (USFWS), Travis Wilson (NCWRC) & Hannah Sprinkle (NCDENR-DWR) provided comments prior to the meeting.        Existing Features Feature Bridged: Big Gully  Bridge Clear Deck Width: 27.6 (Ft.) Approach Roadway width: 25 (Ft.) 5’ shoulders w/ 1’ paved  Bridge Length: 53 (Ft.) Deck Width (Out To Out): 29.3 (Ft.)  Water Depth: 5 (Ft.) Height Bed-To-Crown: 13 (Ft.)  Year Built: 1972 Posted: SV - 18 TTST - 26  Superstructure: 18” Prestressed Concrete Channel Beam Substructure: EBs & IBs: PPC Caps with Timber piles Pier Type: 1@30’-8”, 1@30’, 1@30’-8”  Temp. Shored:  Historic High Water (Elev. to the Exist. Structure): TBD Status: Structurally Deficient  PRI: DP: 0 SR: 44.50 School Bussing crossings per day:  Posted Speed Limit Vicinity: 55 mph  Detour Off-Site  Stage Construction  New Alignment  On-site   Detour listed below is in conflict with BR-0082 (Harnett 56). The let date for Bridge 56 is 2/15/2023. Description Of Detour Route: SR 1130 Norrington Rd to Clark Rd. W on Clark Rd to NC 27. SW on NC 27 to Nursery Rd. S on Nursery Rd to Darroch Rd. SE on Darroch Rd back to Norrington Rd.  Approximate Length Of Detour? 10.2 miles (8.2 additional miles)  Improvements Needed To Road(s) On Detour?  Div. Traffic Eng. Recommend Off-site detour signing? Trailblazing with Street/Road names  Improvements Needed To Bridges On Detour? Replacement of Bridge 56, No other improvements needed.  Are future plans for upgrading this roadway either at or in the vicinity of this project?  Are Bridges On Detour Currently Programmed? Yes. Harnett 56  Are There EMS Or Business Access Issues?  Are There Any Railroad Crossings On Detour? No  Should Work Zone Pedestrian Access Be Maintained During Construction? Yes/No  Utilities Overhead Utility Lines  In Conflict  Cable Lines  In Conflict   Based on the past history near this project site, what is the Estimated Time Required to complete Utility Adjustments? Months  Is There Any Future Utility Construction Anticipated In The Project Area: No     Environmental Wetlands At Site: Yes Comments:  Endangered Species In County: Cape Fear Shiner (no Habitat), Red-cockaded woodpecker (no habitat) & Rough-leafed loosestrife (habitat).  T&E species effect: American Alligator (habitat)  Trout Watershed: No Natural Heritage Area: Yes  CAMA County: No Primary Nursery Area: No  Moratoria: No Which species: Duration:  Permits discussion: NW3  Water Quality Classification: WS IV, Sw 303d: No  Coast Guard Permit? No Drainage Basin: Cape Fear River Riparian Buffer Rules: No  Is The Project Site In Or Near Any Of The Following:  National Forest: No Wildlife Refuge: No  State, County, Or Local Park: No Wild And Scenic River: No  Airport: No Recreation or Power Generation: No  Water Supply Reservoir: No Nutrient Sensitive Waters: No  Public Use Boat Ramp: No Cemeteries: No  VAD/Farmland Protection: No Game Lands: No  Known Or Potential Historic Properties In The Area: No  Architecture: No Survey Archaeology: No survey  Is the Bridge Structure Itself, or any part thereof, considered Historic: No  Impacts to a Church, Community Center, Or Other Public Facility? No  Is this a Statewide Bicycle Route or a Local Non-Marked Bicycle Route: Yes/No  Comments:  Geotechnical Are There Any Historical and/or Vibration Sensitive Structures Near By? No:  Are There Any Known Landfills and/or Geo-environmental Hazard Sites at/or Within Close Proximity To The Project Site? No  Are Any Impacts Anticipated To Natural Springs Or Artesian Wells? No  Possible Foundation Type: H-piles (18”) End Bents: Interior Bents:   Hydraulics FEMA Approval? Yes (MOA ) Limited Detail Study – maintain road grade  Is There Unusual Scour Potential? Yes Is Protection Needed? standard end bent protection  Are Banks Stable? Yes Is Protection Needed? standard end bent protection  Appreciable Amount Of Large Debris? Low  Placement Of Bents In The Water Be Allowed: Yes Where: 5 ft min. offset from existing interior bent  Structure Type: Bridge Superstructure Type: 21” cored slab If girder; why? N/A  Length Of Structure: 53 ft Min. Number Of Spans: 3 Span Arrangement: 17.667’, 18’ & 17.583’  Waive offset: No; use 5 ft offsets EB Cap: 2’-6” Skewed: 90  Add’l Comments:   Items To Be Discussed / Resolved At FSM By Attendees Off-Site  Stage Construction  New Alignment  On-site   Environmental Document Prepared by: Simpson (Reviewed & Submitted by DEO) Federal CE Checklist  State Minimum Criteria Checklist  prepared by TBD  AADT: 950 vpd (2019) NHS: No Tier: Sub-Regional Func. Class: Minor Collector  Bridge Min. Clear Deck Width Recommended by Div.: 30’-10” ft CRW (Out to Out dimension 33 ft)  Roadway lane width: 11’ with 3’ shoulders  Extension of Paved shoulders:  Pave to face of guardrail and taper 8:1 to travel lane/paved shoulder? Yes  Min. Pavement Surface Course: Existing Roadway: 23 (ft)  Pavement Marking: Thermo existing Pavement Markers: Raised  Will Railroad Involvement Be Required: No Method of Clearing: TBD  Truck Percentage: 6% per BIR Reasonable Safe Speed per SIR: 55 mph  Liquidated damages: will be imposed after _ _ days of closure/construction. Amt: $ _ _ per day  CEI by? NCDOT/On-Call R/W by? NCDOT/ PEF R/W monuments? Pin & Cap  Salvageable materials: TBD – Keep Sheet Piles – Contact / Coordinate with Mike Fisher.        Removal of previous structure remnant abutments/piers: Yes- remove or break off any existing piles 1’ below the mud line.  Sequencing priority in construction? N/A  Let Date:  Comments: Action Items: