Loading...
HomeMy WebLinkAboutCredit Release Task 3ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Qaaltty October 27, 2021 Shawn Wilkerson DWR Project #: 2019-01570 Wildlands Holdings V, LLC Orange County (via electronic mail: swilkersonkwildlandseng com ) Re: Perry Hill II Mitigation Banking Instrument (MBI) Perry Hill II Bank Parcel Credit Release — Task 3 Dear Mr. Wilkerson: On June 17, 2021, the Division of Water Resources (DWR) received an As -Built Report from Wildlands Holdings V, LLC (Wildlands) for the Perry Hill Il Mitigation Site. On October 4, 2021, Katie Merritt with DWR requested additional information to complete her review of the report. On October 5, 2021, Wildlands provided Ms. Merritt with the information requested. According to the As -Built survey submitted with the As -Built Report, there are slight adjustments in the total amounts of Riparian Buffer credits as well as Nutrient Offset credits as compared to the approved Bank Parcel Development Package. The subject site has generated 32,984 ft2 of buffer restoration credits, 11,618.436 ft2 of buffer enhancement credits and 590,391 ft2 (30,807.380 lbs-nitrogen and 1,984.233 lbs-phosphorus) of nutrient offset credits. The credits being released have been modified to reflect any changes to the creditable acreage as proposed in the BPDP. On October 20, 2021, DWR received a performance bond (#107501176) issued to Wildlands from Travelers Casualty and Surety Company of America, in the amount of $100,000, to cover monitoring and maintenance at the subject site. The term of this bond applies beginning October 12, 2021 and ends with the approval of the Year 1 Monitoring Report by the DWR. Future credit releases will be dependent on both the renewal of this performance bond and the annual monitoring reports. In accordance with the MBI, signed on September 14, 2020, the following Project Milestones have been met and the corresponding credits shall be released: Task/Milestones Credit 3) Monitoring Financial Assurance Posted & Approval of As -Built Report 10% By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above -referenced tract and therefore the following credits are released: • 10% of the Neuse buffer Restoration credits (0.10 x 32,984 ft2 = 3,298.40 ft2) plus 2,676.400 ft2 yields 5,974.80 ft2 of credits now available to sell • 10% of the Neuse buffer Enhancement via Cattle Exclusion credits (0.10 x 11,618.436 ft2 = 1,161.844 ft2) plus 88.852 ft2 yields 1,250.696 ft2 of credits now available to sell. • 10% of the Nitrogen nutrient offset credits (0.10 x 30,807.380 lb-N = 3,080.738 lb-N) minus 102.28 lb-N yields 2,978.458 lb-N credits now available to sell. North Carolina Department of Environmental Quality Division of Water Resources Q N�ATH cnRouNn 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 oewem o�im�memei a�ai` r 919.707.9000 Perry Hill II Mitigation Site Wildlands October 27, 2021 10% of the Phosphorus nutrient offset credits (0.10 x 1,984.233 lb-P = 198.423 lb-P) minus 6.588 lb-P yields 191.835 lb-P credits now available to sell. Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Upper and Lower Falls Watersheds within the Neuse River Basin pursuant to 15A NCAC 02B .0703 which became effective on April 1, 2020. Additionally, the riparian buffer credits must be used for authorized impacts in the Neuse River Basin according to guidelines in the Consolidated Buffer Mitigation Rule, 15A NCAC 02B .0295, which became effective on November 1, 2015. Please feel free to call me at (919) 707-3637 if you have any questions regarding this correspondence. Sincerely, EDocuSigned by: V A43C72700,BrD543Ems— Katie Merritt 401 & Buffer Permitting Branch cc:File Copy (Katie Merritt) Ashley Yarsinske (Wildlands) — via electronic mail Page 2 of 2