Loading...
HomeMy WebLinkAbout20121051 Ver 1_Stormwater Info_20131007ketchem engineering & tU'SN► DWQ # 12 -1051 NC Department of Environment and Natural Resources Division of Water Resources Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) Attn: Karen Higgins 512 N. Salisbury Street (9h floor) Raleigh, NC 27604 Re: DWQ # 12 -1051 Stormwater Management Plan Approval Water Quality Certification Approval- Condition #3 Colvin Park Subdivision Wake County, NC To Ms. Higgins: crowder surveying October 2, 2013 On December 21, 2012, we received a copy of the written 401 Water Quality Certification for the project known as Colvin Park Subdivision (DWQ #:12- 1051). Condition #3 of this Approval required that a copy of the Approved Stormwater Management Plan be submitted to your office once received from the Town of Apex. As such, please see attached Stormwater Management Plan, the signed plans and details. Sincerely, KETCHEM- CROWDER & ASSOCIATES, PLLC Brian Ketchem, P.E. Attachments: - SW Calculations, Plans, and Details 0 �(r—za AU�J LS D 7 3 Branch i �N9:liend9 4072 Barrett Dr. Raleigh, NC 27609 (919) 420 -7667 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC COLVIN PARK SUBDIVISION Stormwater Calculations 3/15/2013 ! ` bg 0 C 1 7 i s a SEAL . 0356 2 getchem- Crowder & Associates, PLLC 4072 Barrett Dr Raleigh, NC 27609 919- 420 -7667 Stormwater Management Report March 15, 2013 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC INTRODUCTION Colvin Park Subdivision is a proposed residential development located in Apex between Smith Rd and Stephenson Rd just south of Ten Ten. The project will be developed in phases and totals approximately 63 acres and is proposing 148 total homes. The site is located in the Neuse River Basin and ultimately drains to Middle Creek(C- NSW). The site is subject to the North Carolina Division of Water Quality Neuse River Basin rules for stormwater management. The development is also located in the Town of Apex Secondary Water Protection Area and will be subject to the stormwater management regulations of the Town of Apex. The purpose of this report is to demonstrate the site's proposed compliance with all stormwater regulations. Figure 1. Colvin Park Subdivision Stormwater Management Report March 15, 2013 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP DESIGN SUMMARY BMP #_, 1 - Proposed Wet Pond DRAINAGE AREA= 15.80 ACRES PERCENT IMPERVIOUS AREA = 38 % • 2.5" drawdown orifice @ 444.5 • 4' x 4' slab top cadet box, crest @ 446.7 • 36" RCP Outlet Barrel • Top of Dam = 448.5 BMP #2 - Proposed Wet Pond DRAINAGE AREA = 7.20 ACRES PERCENT IIVIPERvtous AREA = 38% • 1.5" drawdown onfice @ 449.50 • 4' x 4' slab top uilet box, crest @ 450.70 • 18" RCP Outlet Barrel • Top of Dam = 452.00 Peak Water vent Surface Freeboard Qpeak Inflow Qpeak Outflow Elevation F2-Year 446.19 2.31 40.98 0.21 ar 446.61 1.89 52.77 0.23 ear 447.12 1.38 72.32 11.5 BMP #2 - Proposed Wet Pond DRAINAGE AREA = 7.20 ACRES PERCENT IIVIPERvtous AREA = 38% • 1.5" drawdown onfice @ 449.50 • 4' x 4' slab top uilet box, crest @ 450.70 • 18" RCP Outlet Barrel • Top of Dam = 452.00 Stormwater Management Report March 15, 2013 Peak Water vent Surface Freeboard Qpeak Inflow Qpeak Outflow Elevation F?--Year 450.48 1.52 23.41 0.06 ar 450.70 1.30 29.34 0.07 ear 450.99 1.01 39.5 6.42 Stormwater Management Report March 15, 2013 COLV'IN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT ST'EPHENSON ROAD APEX, NC BMP #3 - ProRgsed Wet Pond DRAINAGE AREA = 15.7 ACRES PERCENT IMPERVIOUS AREA = 40% • 2.3" drawdown onfice @ 451.5 • 4' x 4' slab top inlet box, crest @ 454 • 36" RCP Outlet Barrel • Top of Dam = 456 BMP #4 - ProRosed Wet Pond ' DRAINAGE AREA = 3.0 ACRES PERCENT IMPERVIOUS AREA = 43% • 1.3" drawdown orifice @ 436.5 • 4' x 4' slab top inlet box, crest @ 437.75 • 18" RCP Outlet Barrel • Top of Dam = 439 Peak Water vent Surface F reeboard Qpek Inflow Qp..k Outflow Elevation FStorm ar 453.29 2.71 43.68 0.18 ar 453.74 2.26 56.25 0.20 ear 454.33 1.67 77.08 8.08 BMP #4 - ProRosed Wet Pond ' DRAINAGE AREA = 3.0 ACRES PERCENT IMPERVIOUS AREA = 43% • 1.3" drawdown orifice @ 436.5 • 4' x 4' slab top inlet box, crest @ 437.75 • 18" RCP Outlet Barrel • Top of Dam = 439 Stormwater Management Report March 15, 2013 Peak Water Storm Event Surface Freeboard Qpe.k Inflow Qpeak Outflow Elevation 2 -Year 437.35 1.65 8.63 0.04 10 -Year 437.56 1.44 11.11 0.04 100 -Year 437.87 1.13 15.23 1.86 Stormwater Management Report March 15, 2013 Stormwater Management Report COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP # 1: Design Calculations (Volume, Surface Area, and Orifice) March 15, 2013 BMP Sizing Worksheet: BMP #1 - Wet Pond Protect Name Colvin Park Protect # ' City /State Apex, NC Date 3/15/2013 Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant A..w.w..w/ Cfifwfwwwv fn thn Di0/#mnn* % Impervious Cover Permanent 3.0 4.0 5.0 Pool Depth 6.0 (feet) 7.0 8.0 9.0 10 059 049 043 035 031 029 026 20 097 079 070 059 051 046 044 30 134 108 097 083 070 064 062 40 173 143 125 105 090 082 077 50 206 173 1 50 130 109 100 092 60 240 203 171 1 51 129 1 18 1 10 70 288 240 207 179 154 135 126 80 1 336 278 238 210 186 160 142 90 1 374 310 266 1 72 34-1 211 183 167 Source WDENROWQ stomnvater tsest Management rracuces, pg a, r,inn lnaa STORMWATER BMP 1 - WET POND (25% TN Removal) Land Use Area ac % IA Imp. Area (ac) Roadway & Sidewalk 220 100 22 Lots 47 @ 3,500sf ea 380 100 38 sq ft Normal pool elevation = 4445 feet Surface area provided = 0.271 Pervious Area 980 0 0 0 Totals 15.80 Rv = 0 05 + 0 009(1) where, 6.0 DA -ieight(H) 355 ft _ength(L) 1675 ft tc (Kirpich) 10 min Total % Impervious Surface Area = 38.0 % Surface Area of Permanent Pool: Calculated depth = 30 feet Rounded Down from Option 2 SA/DA ratio = 1.65 % From Table 10 1 Minimum pond surface area (SA) _ (DA' SA/DA ratio) /100 SA = 0.261 acres 11,356 sq ft Normal pool elevation = 4445 feet Surface area provided = 0.271 acres 11,822 sq ft 1 -inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schue/er (1987) Rv = 0 05 + 0 009(1) where, Rv = Runoff coefficient, in /in I = Percent impervious Rv = 039 in /in Total runoff volume from 1 -inch precipitation Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.516 acre-ft 22,470 cu ft (Water Quality Volume) WQ Head = 16 feet Water quality pool elevation= 4461 feet Colvin Park Subdivision - BMP 1 Detention Basin Volume Verification FOREBAY Frustrum Pyramid 440 707.51 C 441 1,031.65 864.50 442 1,412.34 1,217.02 443 1,849.58 1,626.05 444 2,343.37 2,091.61 444.5 2,718.02 1,264.19 Perm Pool 445 3,192.69 1,476.09 446 3,855.61 3,518.94 446.5 4,157.49 2,002.80 447.5 4,539.23 4,346.96 VOLUME ABOVE PP (ff3) 11,344.79 TOTAL VOLUME (ff3) 18,408.17 Forebay = 21% Total Volume SA @ Perm Pool = 11,822.28 SF VOLUME ABOVE PP (113) 48.142.12 VOLUME AT PP (ff3) 33,122.25 TOTAL VOLUME (ft3)' 81,264.37 Water Quality Volume = 22,470 Water Quality Elevation = 446.1 Orifice Head = 1.6 Pre -Post Analysis Drainage Area = 15.8 acres 1 -year 24 -hour rainfall event (i = 0.1'19 in /hr) Pre - development: Q = CiA = 0.64 cfs Post - development: BMP outflow = 0.06 cfs 10 -year 24 -hour rainfall event (i = 0.21 in /hr) Pre - development: Q = CiA = 1.14 cfs Post - development: BMP outflow = 0.10 cfs 3/15/2013 POND C Acreage Totals Frustrum Pyramid 12.8 440 3,837.59 1.00 441 4,604.75 4,215.35 442 5,442.39 5,017.74 443 6,350.80 5,890.76 444 7,329.88 6,834.49 444.5 9,104.26 4,100.53 Perm Pool 445 11,035.80 5,027.28 446 12,270.113 11,647.51 446.5 13,165.37 6,357.56 447.5 14,373.41 13,764.97 VOLUME ABOVE PP (113) 36,797.33 TOTAL VOLUME (ff3) 62,856.19 Aoottomshea = 9,673.25 ft Apermpooi = 11,822.28 It Aoottom pond = 4,545.10 ft Depth = 4 ft Calculated Avg Depth = 3.4 ft Option 2 Pre - development Composite C: Surface C Acreage Totals Unimproved Area: 0.35 12.8 4.48 Roof: 1.00 0.5 0.50 Wooded Area: 0.15 1.5 0.23 Lawns: 0.20 1.0 0.20 Composite C = 0.34 ORIFICE & LEVEL SPREADER WORKSHEET STORMWATER BMP 1 WET POND (25% TN Removal) Orifice Calculator Q = Cd *A *(2gh)" (1/2) 1 Water Quality Volume Draw -down Variables WQ Volume 0 52 Acre -ft Head 1 6 ft Draw down time. 48 hrs Orifice Area = 0 04 sq ft Orifice Diameter = 2 60 in 2 Max Stage Draw -down Variables Volume Head Draw down time Orifice Area = Orifice Diameter = USE 2.5" DIAMETER Constants 22469 7 cf g = 0 53 ft (Ho /3) Cd= 172800s 5 33 sq in Q= 013 cfs Constants 1 11 Acre -ft 48142 12 cf g = 2 62 ft 0 87 ft (Ho /3) Cd= 87 5 hrs 315000s 0 03 sq ft 4 89 sq. in 2 50 in Q = 0 15 cfs ORIFICE Onfice Area = 4 91 sq in Level Spreader Sizing: F Q at 10 -yr storm = 0 29 cfs Level Spreader @ 20 ft/cfs (10' min) = 10 ft 2/11/2013 322 ft/s2 06 322 ft/s2 06 a COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP # 1: HydroCAD Routing (Summary & Hydrographs) Section 1: 2 -yr, 10-yr & 100 -yr Pond routing Section 2: 1 -yr 24 -hr & 10 -yr 24 -hr Pre/Post Routing Stormwater Management Report March 15, 2013 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC Section 1: 2 -yr, 10 -yr & 100 -yr Pond routing Stormwater Management Report Mardi 15, 2013 BMP #1 -Post - rev 1 -2 -13 Rainfall Duration= 10 min, Inten =4 76 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/17/2013 HydroCADO 10 00 s/n 07807 0 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#1 Inflow Area = 15 800 ac, 37 97% Impervious, Inflow Depth = 0 44" Inflow = 40.98 cfs @ 0 17 hrs, Volume= 0 574 of ' Outflow = 0 21 cfs @ 0 34 hrs, Volume= 0 015 af, Atten= 99 %, Lag= 10 4 min Primary = 0 21 cfs @ 0 34 hrs, Volume= 0 015 of Routing by Stor -Ind method, Time Span= 0 00-100 hrs, dt= 0 01 hrs Peak Elev= 446 19'@ 0 34 hrs Surf Area= 16,587 sf Storage= 24,861 cf Plug -Flow detention time= 32 1 min calculated for 0 015 of (3% of inflow) Center -of -Mass det time= 23 9 min ( 33 9 - 10 0 ) F° Volume Invert Avail Storage Storage Description #1 444 50' 48,116 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 44450 11,716 5645 0 0 11,716 44500 14,228 6058 6,476 6,476 15,573 446.00 16,126 6247 15,167 21,643 17,524 _ 44650 17,323 5205 8,360 30,003 27,024 44750 18,913 5390 18,112 48,116 28,671 Device Routing Invert Outlet Devices #1 Primary 440 00' 36.0" Round Culvert L= 55 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 440 00'/437 50' S=00455? Cc= 0 900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 444 50' 2.5" Vert. Orifice C= 0 600 #3 Device 1 446 70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 21 cfs @ 0 34 hrs HW=446 19' (Free Discharge) t— = Culvert (Passes 0 21 cfs of 92 16 cfs potential flow) 17-Culvert (Orifice Controls 0 21 cfs @ 6 07 fps) 3 Orifice /Grate ( Controls 0 00 cfs) BMP #1 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =4.76 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 44 42 40 38 36 34 32 30 28 26 24 3 22 0 LL 20 18 16 14 12 10 8 6 4 2 0 Pond 2P: BMP #1 Hydrograph Time (hours) � Inflow ® Primary BMP #1 -Post - rev 1 -2 -13 Rainfall Duration= 10 min, inten =613 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD810 00 s/n 07807 02012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP #1 Inflow Area = 15 800 ac, 37 97% Impervious, Inflow Depth = 0 56" Inflow = 52 77 cfs @ 0 17 hrs, Volume= 0 740 of Outflow = 0 23 cfs @ 0 34 hrs, Volume= 0 017 af, Atten= 100 %, Lag= 10 4 min Primary = 0 23 cfs @ 0 34 hrs, Volume= 0 017 of Routing by Stor -Ind method, Time Span= 0 00-100 hrs, dt= 0 01 hrs Peak Elev= 446.61' @ 034 hrs Surf Area= 17,502 sf Storage= 32,038 cf Plug -Flow detention time= 32 4 min calculated for 0 017 of (2% of inflow) Center -of -Mass det time= 23.8 min ( 33.8 - 10 0 ) Volume Invert Avail Storage Storage Description #1 444 50' 48,116 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 44450 11,716 5645 0 0 11,716 44500 14,228 6058 6,476 6,476 15,573 44600 16,126 6247 15,167 21,643 17,524 44650 17,323 5205 8,360 30,003 27,024 447.50 18,913 5390 18,112 48,116 28,671 Device Routing Invert Outlet Devices #1 Primary 440 00' 36.0" Round Culvert L= 55 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 440 00'/ 437 50' S= 0.0455'f Cc= 0 900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 444 50' 2.5" Vert. Orifice C= 0 600 #3 Device 1 446 70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 23 cfs @ 0 34 hrs HW =446 61' (Free Discharge) t—J=Culvert (Passes 0 23 cfs of 96 19 cfs potential flow) 2= Orifce (Orifice Controls 0 23 cfs @ 6 82 fps) 3= Orifice /Grate ( Controls 0 00 cfs) BMP #1 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =6.13 in /hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 55 50 45 40 35 y V 30 3 O LL 25 20 15 10 Pond 2P: BMP #1 Hydrograph 0 Time (hours) 3 inflow 8 Primary BMP #1 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =8 40 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD®10 00 s/n 07807 @2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP #1 Inflow Area = 15 800 ac, 37 97% Impervious, Inflow Depth = 0 77" Inflow = 72.32 cfs @ 0 17 hrs, Volume= 1 013 of Outflow = 11.50 cis @ 0 31 hrs, Volume= 0 225 af, Atten= 84 %, Lag= 8 4 min Primary = 11 50 cfs @ 0 31 hrs, Volume= 0 225 of Routing by Stor -Ind method, Time Span= 0 00-100 hrs, dt= 0 01 hrs Peak Elev= 447 12'@ 0 31 hrs Surf Area= 18,311 sf Storage= 41,254 cf Plug -Flow detention time= 218 min calculated for 0 225 of (22% of inflow) Center -of -Mass det time= 16 3 min ( 26 3 - 10 0 ) Volume Invert Avail Storage Storage Description #1 444 50' 48,116 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Penm Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) _ 44450 11,716 5645 0 0 11,716 44500 14,228 6058 6,476 6,476 15,573 44600 16,126 6247 15,167 21,643 17,524 44650 17,323 520.5 8,360 30,003 27,024 44750 18,913 5390 18,112 48,116 28,671 Device Routing Invert Outlet Devices #1 Primary 440 00' 36.0" Round Culvert L= 55 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 440.00'/437 50' S= 0.0455'f Cc= 0.900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 444 50' 2.6" Vert. Orifice C= 0 600 #3 Device 1 446 70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =11 46 cfs @ 0 31 hrs HW=447 12' (Free Discharge) = Culvert (Passes 1146 cfs of 100 86 cfs potential flow) 2= Orifice (Orifice Controls 0 26 cfs @ 7.64 fps) 3= Orifice /Grate (Weir Controls 11 20 cfs @ 2 12 fps) BMP #1 -Post - rev 1 -2 -13 Rainfall Duration =10 min, lnten =8.40 in /hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 80 75 70 65 60 55 50 4 45 40 0 ti 35 30 25 20 15 10 5 0 0 Pond 2P: BMP #1 Hydrograph Time (hours) ■ Inflow Primary COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC Section 2: 1 -yr 24 -hr & 10 -yr 24 -hr Pre /Post Routing Stormwater Management Report March 15, 2013 BMP #1 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0 12 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#1 Inflow Area = 15 800 ac, 37 97% Impervious, Inflow Depth > 0 06" Inflow = 105 cis @ 0 17 hrs, Volume= 0 080 of Outflow = 0.06 cfs @ 100 hrs, Volume= 0 002 af, Atten= 94 %, Lag= 49 8 min Primary = 0.06 cfs @ 100 hrs, Volume= 0 002 of Routing by Stor -Ind method, Time Span= 0 00-100 hrs, dt= 0 01 hrs Peak Elev= 444.76' @ 100 hrs Surf Area= 13,024 sf Storage= 3,372 cf Plug -Flow detention time= 40 3 min calculated for 0 002 of (3% of inflow) Center -of -Mass det time= 115 min ( 44 1 - 32 6 ) Invert Avail Storage Storage Description _Volume - #1 444 50' 48,116 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum.Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 44450 11,716 5645 0 0 11,716 44500 14,228 6058 6,476 6,476 15,573 44600 16,126 6247 15,167 21,643 17,524 44650 17,323 5205 8,360 30,003 27,024 447.50 18,913 5390 18,112 48,116 28,671 Device Routing Invert Outlet Devices #1 Primary 440 00' 36.0" Round Culvert L= 55 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert = 440.00'/437 50' S= 0.0455'/' Cc= 0 900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 444 50' 2.5" Vert. Orifice C= 0 600 #3 Device 1 446 70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads rimary OutFlow Max =0 06 cfs @ 100 hrs HW =444 76' (Free Discharge) = Culvert (Passes 0 06 cfs of 76 82 cfs potential flow) 2= Orifice (Orifice Controls 0 06 cfs @ 190 fps) 3= Orifice /Grate ( Controls 0 00 cfs) BMP #1 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, lnten =0.12 in/hr Prepared by Ketchem - Crowder & Associates Printed 3118/2013 HydroCAD ®10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC U 3 O LL a 0 Pond 2P: BMP #1 Hydrograph Time (hours) lnncw Primary BMP #1 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0 21 in1hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#1 Inflow Area = 15 800 ac, 37 97% Impervious, Inflow Depth > 0 11" Inflow = 184 cfs @ 0.17 hrs, Volume= 0 140 of Outflow = 0 1Oafs @ 100 hrs, Volume= 0 004 af, Atten= 95 %, Lag= 49 8 min Primary = 0 10 cfs @ 100 hrs, Volume= 0 004 of Routing by Stor -Ind method, Time Span= 0 00-100 hrs, dt= 0 01 hrs Peak Elev= 444 96'@ 100 hrs Surf Area= 14,004 sf Storage= 5,899 cf Plug -Flow detention time= 38 3 min calculated for 0 004 of (3% of inflow) Center -of -Mass det time= 9 5 min ( 42 1 - 32 6 ) Volume Invert Avail Storage Storage Description = #1 444 50' 48,116 cf Custom Stage Data (Irregular) Listed below ;^ Elevation Surf Area Penm Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 44450 11,716 5645 0 0 11,716 44500 14,228 6058 6,476 6,476 15,573 ` 446.00 16,126 6247 15,167 21,643 17,524 44650 17,323 5205 8,360 30,003 27,024 44750 18,913 539.0 18,112 48,116 28,671 Device Routing Invert Outlet Devices #1 Primary 440 00' 36.0" Round Culvert L= 55 0' RCP, groove end projecting, Ke= 0 200 Inlet / Outlet Invert= 440 00'/ 437 50' S= 0 0455? Cc= 0 900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 444 50' 2.5" Vert. Orifice C= 0 600 #3 Device 1 446 70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 10 cfs @ 1 00 hrs HW =444 96' (Free Discharge) t— = Culvert (Passes 0 10 cfs of 79 08 cfs potential flow) 2 =Orifice (Orifice Controls 0 10 cfs @ 2 85 fps) 3 Orifice /Grate ( Controls 0 00 cfs) BMP #1 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0.21 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10-00 s/n 07807 © 2012 HydroCAD Software Solutions LLC VJ V 3 O LL Pond 2P: BMP #1 Hydrograph Time (hours) i Inflow ■ Primary COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHWON ROAD APEX, NC BMP # 1: DWQ Supplements Supplement 1: Wet Detention Basin Supplement Supplement 2: Wet Detention Basin O &M Agreement Supplement 3: Required Items Checklist Stormwater Management Report March 15, 2013 Permit (to be provided by DWQ) �. WDENR = �I> - STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part tit) must be printed, filled out and submitted along with all of the required information. jl PROJECT INFORMATION Project name COLVIN PARK SUBDIVISION Contact person BRIAN KETCHEM, PE Phone number 919- 724 -0624 Date 3115/2013 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 688,248 itz Impervious area, post- development 261,360 fI2 °10 impervious 37.97 of �° Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre - development 1 -yr, 24 -hr runoff Post- deveiopment 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre /post control of the 1 y 24hr storm peak flow required? 1 -yr, 24-hr rainfall depth Rational C, pre - development Rational C, post - development Rainfall intensity: 1 -yr, 24 -hr storm Pre - development 1 -yr, 24 -hr peak flow Post - development 1 -yr, 24 -hr peak flow Pre /Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state - required temp. pool? Elevation of the top of the additional volume 22,470 ft3 48,142 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.9 in 0.34 (unitiess) 0.60 (unitless) 0.12 in /hr OK 0.64 ft3 /sec 0.07 ft3 /sec -0.57 ft3 /sec 447.12 fmsi 444.50 fmsi 444.25 fmsl 445.00 frisl 444.00 fmsi 440.00 I'ms! 439.00 fmsi 1.00 ft N (Y or N) frnsi Form SW401 -Wet Detention Basin- Rev.94PI8 112 Parts 1. u It. Design Summan), Page 'I of 2 II, DESIGN INFORMATION Surface Areas Area, temporary pool 18,913 ft' Area REQUIRED, permanent pool 11,356 ft' SAIDA ratio 1.65 (unitless) Area PROVIDED, permanent pool, App,„_,., 11,822 if OK Area, bottom of 1 Oft vegetated shelf, Abt_a,ar 9,673 ft OK Area, sediment cleanout, top elevation (bottom of pond), At,., p�d 4,545 ft` 1.8 :1 Volumes Y (Y or N) OK Volume, temporary pool 48,142 ff OK Volume, permanent pool, Vpp,mj w 33,122 fe OK Volume, forebay (sum of forebays if more than one forebay) 7,063 fO Orifice with manual valve control Forebay % of permanent pool volume 21.3% % OK SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 1.65 ( unitiess) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10 -2b) N (Y or N) Volume, permanent pool, Vpp._,w 33,122 ft' Area provided, permanent pool, A,._pw 11,822 ft Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, dp„ (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10 -2b) Y (Y or N) Area provided, permanent pool, Ap,,_p,, 11,822 ft Area, bottom of 10ft vegetated shelf, Abt_ ,w, 9,673 ft Area, sediment deanout, top elevation (bottom of pond), Ate,,", d 4,545 fe "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 4.00 ft Average depth calculated 3.00 ft OK Average depth used in SAIDA, d.„ (Round to down to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.50 in Area of orifice (if- non - circular) in Coefficient of discharge (Co) 0.60 ( unitless) Driving head (Ho) 2.62 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) ( unitless) Length of weir (L) It Driving head (H) ft Pre - development 1 -yr, 24 -hr peak flow 0.64 R3 /sec Post - development 1 -yr, 24 -hr peak flow 1.05 ff3 /sec Storage volume discharge rate (through discharge orifice or weir) 0.06 ft3 /sec Storage volume drawdown time 3.65 days OK, draws down in 2 -5 days. Additional information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 3 :1 OK 10 :1 OK 10.0 It OK 3 :1 OK 1.8 :1 OK Y (Y or N) OK 1.0 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Orifice with manual valve control Permit (to be provided by DWQ) Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Parts 1. & II. Design Summary, Page 2 of 2 Permit Number (to be provided by DWQ) Drainage Area Number Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BUT. This maintenance record will be kept in a log in a known set location. Any deficient BW elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BW. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if F needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drawl should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash /debris is present Remove the trash/ debris The perimeter of the wet detention basin Areas of bare soil and /or erosive gullies have formed Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established Provide lime and a one -time fertilizer application Vegetation is too short or too Maintain vegetation at a height of long approximately six inches Form SW401 -Wet Detention Basin O &M -Rev 4 Page 1 of 4 Permit Number (to be provided by DWQ) Drainage Area Number BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or nprap to avoid future problems with erosion. The forebay Sediment has accumulated to a depth greater than the original design depth for Search for the source of the sediment and remedy the problem if possible Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health Plants are dead, diseased or Determine the source of the dying problem soils, hydrology, disease, etc Remedy the problem and replace plants Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying The main treatment area Sediment has accumulated to a depth greater than the original design sediment Search for the source of the sediment and remedy the problem if possible. Remove the sediment and storage depth dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over 50% of the area Consult a professional to remove and control the algal growth Cattails, phragnutes or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface Form SW401 -Wet Detention Basin O &M -Rev 4 Page 2 of 4 r Permit Number (to be provided by DWQ) Drainage Area Number BMP element: Potential problem: How I will remediate the roblem: The embankment Shrubs have started to grow Remove shrubs munediately. on the embankment Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree An annual inspection by an Make all needed repairs appropriate professional shows that the embankment needs repair if applicable) The outlet device Clogging has occurred Clean out the outlet device Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919 -733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 440 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 440 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 444 5 Sediment Removal 440 P anen Pool - - - ----------- - - Volume Sediment Removal Elevation 440 Volume Bottom Elevatio 439 ft Min. -------------------------------------- - - - - -- - - - - -- Sedirment Bottom Elevation 439 1 -ft Storage Sedimet Storage FOREBAY MAIN POND Form SW401 -Wet Detention Basin O &M -Rev 4 Page 3 of 4 Permit Number (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:COLVIN PARK BW drainage area number: Print name:Mitchell W Sanner, III - PARKER & ORLEANS HOMEBUILDERS. INC Title:Division President Address:211 James Jackson Ave Cry, NC 27513 Phone:(919) 380 -7223 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401 -Wet Detention Basin O &M -Rev.4 Page 4 of 4 Permit No (to be provided by DWQ) NIT, z�i L'',.+ a 4Yi1 ��Y Please Indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will result in a request for additional Information. This will delay final review and approval of the project Initial in the space provided to Indicate the following design requirements have been met If the applicant has designated an agent, the agent may Initial below H a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C-06 to 09 1 Plans (1" - 50' or larger) of the entire site showing - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement C-41 2 Partial plan (1" = 30' or larger) and details for the wet detention basin showing - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross - section, - Vegetation specification for planting shelf, and - Filter strip C-41 3 Section view of the wet detention basin (1" = 20' or larger) showing - Slde slopes, 31 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures C-41 4 If the basin Is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin SW Report 5 A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to venfy volume provided C-18 6 A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized SW Report 7 The supporting calculations SW Report 8 A copy of the signed and notarized operation and maintenance (O &M) agreement NIA 9 A copy of the deed restrictions (If required) SW Report 10 A soils report that is based upon an actual field investigation, sod bonngs, and Infiltration tests County soil maps are not an acceptable source of sods Information Form SW401 -Wet Detention Basin -Rev 9- 4/18/12 Part III Required Items Checklist, Page 1 of 1 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #2: Design Calculations (Volume, Surface Area, and Onfice) Stormwater Management Report March 15, 2013 BMP Sizing Worksheet: BMP #2 - Wet Pond Project Name Colvin Park Project # City/State Apex, NC Date 3/15/2013 Table 11 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant n...........► car ........... ....tie cae.r...nn* % Impervious Cover - Permanent Pool Depth (feet) 30 40 50 60 70 8.0 90 10 059 049 043 035 031 029 026 20 097 079 070 059 051 046 044 30 134 108 097 083 070 064 062 40 173 143 125 105 090 082 077 50 206 173 150 130 109 100 092 60 240 203 171 151 129 118 110 70 288 240 207 179 154 135 126 80 336 278 238 210 186 160 142 90 374 310 266 234 211 183 167 tiOUMO NUUGVK/UVVW Jj0rMWMUF OtM IIflFlfAf OU10lln Fu ., _F. .... STORMWATER BMP 2 - WET POND (25% TN Removal) Land Use Area ac % IA Imp. Area ac Roadway & Sidewalk 110 100 1 1 Lots 18 @ 3,500sf ea 160 100 16 4673 sq ft Normal pool elevation = 4495 feet Pervious Area 450 0 00 Totals 7.20 27 )A ieight(H) 22 5 ft - ength(L) 675 ft c (Kirpich) 5 min Total % Impervious Surface Area = 375 % Surface Area of Permanent Pool- Calculated depth = 35 feet SA/DA ratio = 149 % From Supplemental Form SAIDA Tables (Piedmont 85 90') Minimum pond surface area (SA) = (DA ` SA/DA ratio) /100 SA = 0.107 acres 4673 sq ft Normal pool elevation = 4495 feet Surface area provided = 0.137 acres 5949 sq ft 1 -Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0 05 + 0 009(1) where, Rv = Runoff coefficient, in /in I = Percent impervious Rv = 039 in /in Total runoff volume from 1 -inch precipitation Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.233 acre -ft 10128 cu ft WQ Head = 13 feet Water quality pool elevation= 4508 feet Colvin Park Subdivision - BMP 2 Detention Basin Volume Verification 2/1/2013 POND Frustrum Pyramid FOIZEBAY Frustrum Pyramid 44 445 1,169.65 983.61 446 263.49 446 1,591.10 1,374.98 447 537.75 392.55 447 2,073.00 1,826.75 448 880.71 702.22 448 2,615.35 2,338.93 449 1,274.85 1,071.72 449 3,254.62 2,929.17 449.5 1,533.10 701.00 Perm Pool 449.5 4,415.48 1,910.16 Perm Pool 450 1,736.46 816.86 450 5,744.74 2,532.78 450.5 2,162.01 972.68 450.5 6.036.54 2,945.02 451 2,587.56 1,185.80 451 6,328.34 3,090.93 VOLUME ABOVE PP (ff3) 2,975.34 VOLUME ABOVE PP (ff3) 8,568.73 TOTAL VOLUME (ff3) 5,842.83 TOTAL VOLUME (1113) 19,932.33 Forebay= 20% Total Volume Abonomshen = 4,529.47 ft SA ^s Perm Pool = 5.948.58 SF Aperm p_1 = 5,948.58 ft VOLUME ABOVE PP (111113) 11,544.07 Abottompond = 1,072.14 ft VOLUME AT PP (11113) 14,231.09 Depth = 5 ft TOTAL VOLUME (ff3)' 25,775.16 Calculated Avg Depth = 3.5 Option 2 Water Quality Volume = 10,128 Water Quality Elevation = 450.8 Orifice Head = 1.3 Pre -Post Analysis Drainage Area = 7.2 acres 1 -year 24 -hour rainfall event (i = 0.119 in /hr) Pre - development Composite C: Pre - development: Q = CiA = 0.23 cfs Surface C Acreage Totals Post - development: BMP outflow = 0,05 cfs Unimproved Area : 0.35 3.6 1.26 Roof: 1.00 0.1 0.10 " 10 -year 24 -hour rainfall event (i = 0.21 in/hr) Wooded Area: 0.15 2.0 0.30 Pre - development: Q = CiA = 0.41 cfs Lawns: 0.20 1.5 0.30 Post - development: BMP outflow = 0.06 cfs Composite C = 0.27 ORIFICE & LEVEL SPREADER WORKSHEET STORMWATER BMP 2 WET POND (25% TN Removal) Orifice Calculator Q = CdW(2gh) ^(112) 1 Water Quality Volume Draw -down Variables WQ Volume 0 23 Acre -ft Head 1 3 ft Draw down time 48 hrs Orifice Area = 0 02 sq ft Orifice Diameter = 1 83 in 2 Max Stage Draw -down Variables Volume 0.27 Acre -ft Head 1 5 ft Draw down time 77 hrs Orifice Area = 0.01 sq ft Orifice Diameter = 1.50 in USE 1.5" DIAMETER ORIFICE Orifice Area = Level Spreader Sizing: Q at 10 -yr storm = 0.07 cfs Level Spreader @ 50 ft/cfs (10' min) _ �—' 10127.7 cf 0 44 ft (Ho /3) 172800 s 2 63 sq in 11544.07 cf 0.50 ft (Ho /3) 277200s 1 77 sq in Constants 9= Cd= Constants 9= Cd= Q = 0 04 cfs 1 77 sq in 10 ft 2/1/2013 322 ft/s2 06 322 ft/s2 06 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #2: HydroCAD Routing (Summary & Hydrographs) Section 1: 2 -yr, 10 -yr & 100-yr Pond routing Section 2: 1 -yr 24 -hr & 10-yr 24 -hr Pre/Post Routing Stormwater Management Report March 15, 2013 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC Section 1: 2 -yr, 10 -yr & 100 -yr Pond routing Stormwater Management Report March 15, 2013 BMP #2 -Post - rev 1 -2 -13 Rainfall Duration =5 min, Inten =5 76 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD®10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#2 Inflow Area = 7 200 ac, 37 50% Impervious, Inflow Depth = 0.28" Inflow = 23 41 cfs @ 0 08 hrs, Volume= 0 167 of Outflow = 0 06 cfs @ 0 17 hrs, Volume= 0 013 af, Atten= 100 %, Lag= 5.2 min Primary = 0 06 cfs @ 0 17 hrs, Volume= 0 013 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 450 48' @ 0 17 hrs Surf Area= 8,166 sf Storage= 7,243 cf Plug -Flow detention time= 90 2 min calculated for 0 013 of (8% of inflow) Center -of -Mass det time= 86 5 min ( 91 5 - 5 0 ) Volume Invert Avail Storage Storage Description #1 449 50' 11,521 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 44950 5,884 3950 0 0 5,884 45000 7,481 426.0 3,333 3,333 7,920 45100 8,916 3710 8,188 11,521 11,431 Device Routing Invert Outlet Devices #1 Primary 449 50' 18.0" Round Culvert L= 45 0' RCP, groove end projecting, Ke= 0 200 Inlet / Outlet Invert= 449 50'/ 447.50' S= 0 0444'/' Cc= 0 900 n= 0 013, Flow Area= 177 sf #2 Device 1 449 50' 1.5" Vert Orifice C= 0.600 #3 Device 1 450 70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max--O 06 cfs @ 0 17 hrs HW=450 48' (Free Discharge) = Culvert (Passes 0 06 cfs of 5 13 cfs potential flow) 2 =Orifice (Orifice Controls 0 06 cfs @ 4 61 fps) 3=Orifice/Grate ( Controls 0 00 cfs) BMP #2 -Post - rev 1 -2 -13 Rainfall Duration =5 min, Inten =5.76 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/1812013 HydroCAD®10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 26 24 22 20 18 16 N 14 0 12 LL lit 8 6 4 2 0 3 0 1 2 Pond 2P: BMP #2 Hydrograph Time (hours) 8 Inflow as Primary i BMP #2 -Post - rev 1 -2 -13 Rainfall Duration =5 min, Inten =7 22 in/hr Prepared by Ketchem- Crowder & Associates Printed 3118/2013 HydroCAD010 00 s/n 07807 02012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP #2 Inflow Area = 7 200 ac, 37 50% Impervious, Inflow Depth = 0 35" Inflow = 29 34 cfs @ 0 08 hrs, Volume= 0 209 of Outflow = 0 07 cfs @ 0 17 hrs, Volume= 0 015 A Atten= 100 %, Lag= 5 5 min Primary = 0 07 cfs @ 017 hrs, Volume= 0.015 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 450 70'@0 17 hrs Surf Area= 8,488 sf Storage= 9,082 cf Plug -Flow detention time= 90 1 min calculated for 0 015 of (7% of inflow) Center -of -Mass det time= 86 4 min ( 914 - 5 0 ) Invert Avail Storage Storage Description _Volume #1 449 50' 11,521 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 44950 5,884 3950 0 0 5,884 45000 7,481 4260 3,333 3,333 7,920 45100 8,916 3710 8,188 11,521 11,431 Device Routing Invert Outlet Devices #1 Primary 449 50' 18.0" Round Culvert L= 45 0' RCP, groove end projecting, Ke= 0 200 Inlet / Outlet Invert= 449 50'/ 447.50' S= 0 0444T Cc= 0 900 n= 0 013, Flow Area= 177 sf #2 Device 1 449 50' 1.5" Vert. Orifice C= 0 600 #3 Device 1 450 70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 07 cfs @ 0 17 hrs HW =450 70' (Free Discharge) 1' = Culvert (Passes 0 07 cfs of 7 08 cfs potential flow) 17—Culvert (Onfce Controls 0 06 cfs @ 5 14 fps) 3 Orifice /Grate (Weir Controls 0 00 cfs @ 0 15 fps) BMP #2 -Post - rev 1 -2 -13 Rainfall Duration =5 min, Inten =7.22 in /hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 32 30 28 26 24 22 20 18 16 0 LL 14 12 10 8 6 4 2 0 0 Pond 2P: BMP #2 Hydrograph 1 2 3 Time (hours) Inflow Primary BMP #2 -Post - rev 1 -2 -13 Rainfall Duration =5 min, Inten =9 72 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD010 00 s/n 07807 @2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#2 Inflow Area = 7 200 ac, 37 50% Impervious, Inflow Depth = 0 47" Inflow = 39 50 cfs @ 0 08 hrs, Volume= 0 281 of Outflow = 6 42 cfs @ 0.15 hrs, Volume= 0 083 af, Atten= 84 %, Lag= 4 3 min Primary = 6 42 cfs @ 0 15 hrs, Volume= 0 083 of Routing by Stor -Ind method, Time Span= 0.00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 450 99'@ 015 hrs Surf Area= 8,899 sf Storage= 11,424 cf Plug -Flow detention time= 26 2 min calculated for 0 083 of (30% of inflow) Center -of -Mass det. time= 23.7 min ( 28 7 - 5 0 ) ' Invert Avail Storage Storage Description _Volume #1 449 50' 11,521 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) _ 44950 5,884 3950 0 0 5,884 45000 7,481 4260 3,333 3,333 7,920 45100 8,916 3710 8,188 11,521 11,431 Device Routing Invert Outlet Devices #1 Primary 449 50' 18.0" Round Culvert L= 45 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 449 50'/447 50' S=00444? Cc= 0 900 n= 0.013, Flow Area= 177 sf #2 Device 1 449 50' 1.5" Vert. Orifice C= 0 600 #3 Device 1 450.70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =6 33 cfs @ 0 15 hrs HW =450 99' (Free Discharge) t-- = Culvert (Passes 6 33 cfs of 9 15 cfs potential flow) =Orifice (Orifice Controls 0 07 cfs @ 5 74 fps) 3 Orifice /Grate (Weir Controls 6 26 cfs @ 175 fps) BMP #2 -Post - rev 1 -2 -13 Rainfall Duration =5 min, Inten =9.72 in /hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC t/1 V 3 O LL Pond 2P: BMP #2 Hydrograph Time (hours) F Inflow Primary COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC Section 2: 1 -yr 24 -hr & 10 -yr 24 -hr Pre/Post Routing Stormwater Management Report Mardi 15, 2013 BMP #2 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0 12 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/1812013 HydroCAD810 00 s/n 07807 02012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#2 Inflow Area = 7.200 ac, 37 50% Impervious, Inflow Depth > 0 21" Inflow = 0.51 cis @ 0 09 hrs, Volume= 0 124 of Outflow = 0 05 cfs @ 3 00 hrs, Volume= 0 007 af, Atten= 91%, Lag= 174 6 min Primary = 0 05 cfs @ 3 00 hrs, Volume= 0 007 of Routing by Stor -Ind method, Time Span= 0 00 -3.00 hrs, dt= 0 01 hrs Peak Elev= 450 21' @ 3 00 hrs Surf Area= 7,783 sf Storage= 5,057 cf Plug -Flow detention time= 105 6 min calculated for 0 007 of (6% of inflow) Center -of -Mass det time= 22.0 min ( 113 4 - 914 ) Volume Invert Avail Storage Storage Description #1 449 50' 11,521 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Penm Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 44950 5,884 3950 0 0 5,884 45000 7,481 4260 3,333 3,333 7,920 45100 8,916 3710 8,188 11,521 11,431 Routing Invert Outlet Devices _Device #1 Primary 449 50' 18.0" Round Culvert L= 45 0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 449 50'/447 50' S= 0 0444 T Cc= 0 900 n= 0 013, Flow Area= 177 sf #2 Device 1 449 50' 1.5" Vert. Orifice C= 0 600 #3 Device 1 450.70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 05 cfs @ 3 00 hrs HW=450 21' (Free Discharge) t—J=Culvert (Passes 0 05 cfs of 2 96 cfs potential flow) 2= Orifice (Orifice Controls 0 05 cfs @ 3 88 fps) 3= Orifice /Grate ( Controls 0 00 cfs) BMP #2 -Post - rev 1 -2 -13 Rainfall Duration= 1,440 min, lnten =0.92 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10-00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 0.55 0.5 0.45 0.4 0.35 0.3 3 LL 0.25 0.2 0.15 0.1 0.05 0 0 1 2 3 Pond 2P: BMP #2 Hydrograph Time (hours) ■ Inflow ■ Primary BMP #2 -Post - rev 1 -2 -13 Rainfall Duration= 1,440 min, Inten =0 21 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP #2 Inflow Area = 7 200 ac, 37 50% Impervious, Inflow Depth > 0 36" Inflow = 0 88 cfs @ 0 09 hrs, Volume= 0 217 of Outflow = 0 06 cfs @ 3 00 hrs, Volume= 0 010 af, Atten= 93 %, Lag= 174 6 min Primary = 0 06 cfs @ 3 00 hrs, Volume= 0 010 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 450 69' @ 300 hrs Surf Area= 8,470 sf Storage= 8,975 cf Plug -Flow detention time= 104 3 min calculated for 0 010 of (5% of inflow) Center -of -Mass det time= 19 4 min ( 110 8 - 914 ) Volume Invert Avail Storage Storage Description #1 449 50' 11,521 cf Custom Stage Data (Irregular) Listed below Elevation Surf.Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 44950 5,884 3950 0 0 5,884 45000 7,481 4260 3,333 3,333 7,920 45100 8,916 3710 8,188 11,521 11,431 Device Routina Invert Outlet Devices #1 Primary 449 50' 18.0" Round Culvert L= 45.0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 449 50'/447 50' S= 0 0444 'P Cc= 0 900 n= 0.013, Flow Area= 177 sf #2 Device 1 449 50' 1.5" Vert. Orifice C= 0 600 #3 Device 1 450.70' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 06 cfs @ 3 00 hrs HW =450 69' (Free Discharge) 1-1= Culvert (Passes 0 06 cfs of 6 97 cfs potential flow) = Orifice (Orifice Controls 0 06 cfs @ 5 11 fps) � ( Controls 0 00 cfs) BMP #2 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, lnten =0.21 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 sin 07807 © 2012 HydroCAD Software Solutions LLC w 3 0 LL Pond 2P: BMP #2 Hydrograph Time (hours) fnfiow ® Primary COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #2: DWQ Supplements Supplement 1: Wet Detention Basin Supplement Supplement 2: Wet Detention Basin O &M Agreement Supplement 3: Required Items Checklist Stormwater Management Report March 15, 2013 Permit No. (to be provided by DWQ) MA WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name CO LVIN PARK SUBDIVISION Contact person BRIAN KETCHEM, PE Phone number 919- 724 -0624 Date 3/15/2013 Drainage area number 2 IN. DESHW INFORMATION Site Characteristics Drainage area 313,632 fe Impervious area, post - development 117,612 fe °k impervious 0 37.5 0 Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre - development 1 -yr, 24-hr runoff Post - development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1 yr 24hr stone peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre - development Rational C, post- development Rainfall intensity: 1 -yr, 24 -hr storm Pre - development 1 -yr, 24-hr peak flow Post - development 1 -yr, 24-hr peak flow Pre/Post 'I -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state- required temp. pool? Elevation of the top of the additional volume 10,128 ft3 11,544 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.9 in 0.27 (unitless) 0.55 (unitless) 0.12 in /hr OK 0.23 ft?/sec 0.51 fe /W 0.28 ft?/sec 450.99 fmsl 449.50 fmsl 449.50 fmsl 450.00 fmsl 449.00 fmsl 444.00 fmsl 443.00 fmsl 1.00 it N (Y or N) fmsl Form SW401 -Wei Detention Basin- Rev.9- 4118112 Parts i. & il. Design Summary, Page 1 of 2 Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ap.,w Area, bottom of 1 Oft vegetated shelf, Aw- h,jf Area, sediment cleanout, top elevation (bottom of pond), A,at ond 8,916 ft3 4,673 ft 1.49 (unitless) 5,949 OK 4,529 1,072 ft' Volumes Volume, temporary pool 11,544 ft3 Volume, permanent pool, V,._p , 14,231 ft3 Volume, forebay (sum of forebays if more than one forebay) 2,867 ft3 Forebay % of permanent pool volume 20.1% % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10 -2b) Volume, permanent pool, Vl,.-pool Area provided, permanent pool, Ap,„_,,,d Average depth calculated Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap,._pod Area, bottom of 1 Oft vegetated shelf, Abc1- .11.11 Area, sediment cleanout, top elevation (bottom of pond), Abot.PlId 85 % N (Y or N) Y (Y or N) 1.49 (unitless) N (Y or N) 14,231 ft' 5,949 ft` ft ft Y (Y or N) 5,949 ft` 4,529 fe 1,072 ft "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 5.00 ft Average depth calculated 3.50 ft Average depth used in SAIDA, d.„ (Round to down to nearest 0.5ft) 3.5 ft Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if- non - circular) Coefficient of discharge (CD) Driving head (H,) Drawdown through weir? Weir type Coefficient of discharge (C",) Length of weir (L) Driving head (H) Pre - development 1 -yr, 24 -hr peak flow Post - development 1 -yr, 24 -hr peak How Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 1.50 in in' 0.60 (unitless) 1.49 ft N (Y or N) (unitless) (unilless) ft ft 0.23 ft?/sec 0.51 felsec 0.05 ft3 /sec 3.21 days Wz OK Need 3 ft min. OK OK OK, draws down in 2 -5 days. 3 :1 OK i-0:1 OK 10.0 ft OK 3 :1 OK 2.0 :1 OK Y (Y or N) OK 1.0 It OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Orifice with manual valve control Permit (to be provided by DWQ) Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Parts I. & It. Design Summary, Page 2 of 2 Permit Number: (to be provided by DWQ) Drainage Area Number Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be mmiin -dzed to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is present Remove the trash debris The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established Provide lone and a one -time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long approximately six inches Form SW401 -Wet Detention Basin O &M -Rev.4 Page 1 of 4 Permit Number (to be provided by DWQ) Drainage Area Number* BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged Unclog the pipe Dispose of the Swale sediment off -site The pipe is cracked or Replace the pipe otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion The forebay Sediment has accumulated to a depth greater than the Search for the source of the sediment and remedy the problem if original design depth for possible Remove the sediment and sediment storage dispose of it in a location where it will not cause impacts to streams or the BUT. Erosion has occurred Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems Weeds are present Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc Remedy the problem and replace plants. Provide a one -tine fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying The main treatment area Sediment has accumulated to a depth greater than the original design sediment Search for the source of the sediment and remedy the problem if possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMT Algal growth covers over Consult a professional to remove 50% of the area and control the algal growth Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basm surface Form SW401 -Wet Detention Basin O &M -Rev 4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the prob, lem: The embankment Shrubs have started to grow Remove shrubs immediately on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree An annual inspection by an Make all needed repairs appropriate professional shows that the embankment needs repair if applicable) The outlet device Clogging has occurred Clean out the outlet device Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of damage have occurred at the Contact the local NC Division of Water Quality Regional Office, or outlet the 401 Oversight Unit at 919 -733- 1786 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 444 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 446 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (dill in the blanks) Permanent Pool Elevation 449 5 Sediment Removal 446 Pe anen Pool ----------------- Volume Sediment Removal Elevation 444 Volume Bottom Elevatio 445 ft Mm ------------------------------ ---- -- - - - - -- - - - - -- Sediment Bottom Elevation 443 1 -ft Storage Sedimei Storage FOREBAY MAIN POND Form SW401 -Wet Detention Basin O &M -Rev.4 Page 3 of 4 M Permit Number (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:COLVIN PARK BMP drainage area number: 2 Print name:Mitchell W Sanner, III - PARKER & ORLEANS HOMEBUILDERS, INC Title:Division President Address:211 James Jackson Ave Cary NC 27513 Phone:(919) 380 -7223 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401 -Wet Detention Basin O &M -Rev 4 Page 4 of 4 Permit No (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met If the applicant has designated an agent, the agent may initial below If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C-06 to 09 1 Plans (1" - 50' or larger) of the entire site showing - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (Include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement C41 2 Partial plan (1" = 30' or larger) and details for the wet detention basin showing - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross- section, - Vegetation specification for planting shelf, and - Fitter strip C-41 3 Section view of the wet detention basin 0" = 20' or larger) showing - Side slopes, 31 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures C-41 4 If the basin is used for sediment and erosion control during construction, dean out of the basin is specified on the plans prior to use as a wet detention basin SW Report 5 A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided C -18 6 A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized SW Report 7 The supporting calculations SW Report 8 A copy of the signed and notarized operation and maintenance (O &M) agreement N/A 9 A copy of the deed restrictions (if required) SW Report 10 A soils report that is based upon an actual field investigation, soil borings, and infiltration tests County soil maps are not an acceptable source of soils information Form SW401 -Wet Detention Basin -Rev 9- 4/18/12 Part III Required Items Checklist, Page 1 of 1 Stormwater Management Report COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #3: Design Calculations (Volume, Surface Area, and Orifice) March 15, 2013 BMP Sizing Worksheet: BMP #3 - Wet Pond Proiect Name Colvin Park Project # Cily/State Apex, NC Date 3/15/2013 Table 10.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant C#iwinnnv in the piotimAnt % Impervious Cover Permanent Pool Depth 3.0 4.0 5.0 6.0 (feet) 7.0 8.0 9.0 10 059 049 043 035 031 029 026 20 097 079 070 059 051 046 044 30 134 108 097 083 070 064 062 40 1 73 143 125 105 090 082 077 50 206 173 1 50 130 1 09 100 092 60 240 203 171 151 129 118 1 10 70 288 240 207 1 79 154 135 126 80 336 278 238 210 186 160 142 90 374 310 266 234 1 211 183 1 167 Source NC1JENR/1JVVQ btormwater best Management rracuces, pg a, „p111 1 m STORMWATER BMP 3 - WET POND (25% TN Removal) Land Use Area ac % IA Imp. Area ac Roadway 8r Sidewalk 200 100 20 Lots 50 + 2 ex @ 3,500s 415 100 42 Pervious Area 955 0 00 Totals 15.7 1 6.2 DA Height(H) 35 ft Length(L) 1450 ft .c (Kirpich) 10 min Total % Impervious Surface Area = 39.5 % Surface Area of Permanent Pool: Assumed depth = 30 feet SA/DA ratio = 1.71 % From Table 10 1 Minimum pond surface area (SA) _ (DA " SA/DA ratio) /100 SA = 0.268 acres 11695 sq ft Normal pool elevation = 4515 feet Surface area provided = 0.269 acres 11726 sq ft 1 -Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0 05 + 0 009(1) where, Rv = Runoff coefficient, in /in I = Percent impervious Rv = 041 in /in Total runoff volume from 1 -inch precipitation Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.530 acre -ft 23105 cu ft WQ Head = 16 feet Water quality pool elevation= 4531 feet Colvin Park Subdivision - BMP 3 Detention Basin Volume Verification FOREBAY Frustrum Pyramid _,`� "E; *_W�4a W� EMS 448 733.45 '11 . - 449 1,195.80 955.25 450 1,738.05 1,458.50 451 2,354.99 2,038.73 451.5 2,687.43 1,259.69 Perm Pool 452 3,034.93 1,429.71 453 3,775.25 3,398.36 454 4,576.21 4,169.31 455 5,550.21 5.055.38 VOLUME ABOVE PP (ff3) 14,052.77 TOTAL VOLUME (ff3) 19,764.94 Forebay = 21% Total Volume SA @ Perm Pool = 11,726.20 SF VOLUME ABOVE PP (ff3) 58,308.40 VOLUME AT PP (1113) 26,602.79 TOTAL VOLUME (ff3)' 86,895.59 Water Quality Volume = 23,105 Water Quality Elevation = 453.1 Orifice Head = 1.6 Pre -Post Analysis Drainage Area = 7.2 acres 1 -year 24 -hour rainfall event (i = 0.119 in /hr) Pre - development Q = CiA = 0.59 cfs Post- developmei BMP outflow = 0.12 cfs " 10 -year 24 -hour rainfall event (i = 0.21 in /hr) Pre - development Q = CiA = 1,04 cfs Post- developmei BMP outflow = 0.16 cfs 3/15/2013 POND Surface C Frustrum Pyramid Unimproved Area: 0.35 2.0 0.70 17. 0.1 447.5 3,753.32 4.4 448 4,188.24 1,984.40 449 5,109.00 4,641.00 450 6,097.07 5,595.76 451 7,149.10 6,616.11 451.5 9,038.77 4,037.74 Perm Pool 452 11,092.16 5,023.98 453 12,402.29 11,741.13 454 13, 770.30 13, 080.33 455 15,059.68 14, 410.18 VOLUME ABOVE PP (ff3) 44,255.63 TOTAL VOLUME (ff3) 67,130.64 Aoottom shelf = 9,504.09 It Ap,m pooh = 11,726.20 ft Aeottom oond ° 4,486.77 ft Depth = 3.5 ft Calculated Avg Depth = 3.0 ft Option 2 Pre - development Composite C: Surface C Acreage Totals Unimproved Area: 0.35 2.0 0.70 Roof. 1.00 0.1 0.10 Wooded Area: 0.15 4.4 0.66 Lawns: 0.20 0.7 0.14 Composite C = 0.22 ORIFICE & LEVEL SPREADER WORKSHEET STORMWATER BMP 3 WET POND (25% TN Removal) Orifice Calculator Q = CdW(2gh) ^(112) 1 Water Quality Volume Draw -down Variables WQ Volume 0 53 Acre -ft 23104 95 cf Head 16 ft 0.53 ft (Ho/3) Draw down time 48 hrs 172800s Orifice Area = 0 04 sq ft 5 50 sq in Orifice Diameter = 2 65 in 1 Max Stage Draw -down- Variables Volume 1 34 Acre -ft Head 3 5 ft Draw down time 108 hrs Orifice Area = 0 03 sq ft Orifice Diameter = 2 30 in USE 2.3" DIAMETER ORIFICE Orifice Area = Level Spreader Sizing: Q at 10 -yr storm = 0 20 cis Level Spreader @ 50 ft/cfs (10' min) _ Constants 9= Cd= Constants 58308 4 cf g = 1.17 ft (Ho /3) Cd= 388800s 4 15 sq in Q= 015cfs 4 15 sq in 10 ft 3/15/2013 322 ft/s2 06 322 ft/s2 06 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #3: HydroCAD Routing (Summary & Hydrographs) Section 1: 2 -yr, 10 -yr & 100 -yr Pond routing Section 2: 1 -yr 24 -hr & 10 -yr 24 -hr Pre/Post Routing Stormwater Management Report March 15, 2013 COLV IN PARK SUBDIVMION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC Section 1: 2 -yr, 10 -yr & 100 -yr Pond routing Stormwater Management Report March 15, 2013 BMP #3 -Post - rev 1 -2 -13 Rainfall Duration= 10 min, Inten =4 76 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP #3 Inflow Area = 15 700 ac, 39 49% Impervious, Inflow Depth = 0 47" Inflow = 43 68 cfs @ 0 17 hrs, Volume= 0 612 of Outflow = 0 18 cfs @ 0 34 hrs, Volume= 0 042 af, Atten= 100 %, Lag= 10 4 min Primary = 0 18 cfs @ 0 34 hrs, Volume= 0 042 of Routing by Stor -Ind method, Time Span= 0 00 -3.00 hrs, dt= 0 01 hrs Peak Elev= 453 29' @ 0 34 hrs Surf Area= 16,921 sf Storage= 26,527 cf Plug -Flow detention time= 910 min calculated for 0 042 of (7% of inflow) Center -of -Mass det time= 83 5 min (93 5 - 10 0 ) Volume Invert Avail Storage Storage Description #1 451 50' 58,292 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 45150 10,718 6200 0 0 10,718 45200 14,170 6930 6,202 6,202 18,352 45300 16,281 7140 15,213 21,415 20,807 45400 18,453 7340 17,356 38,771 23,222 45500 20,610 6440 19,522 58,292 33,116 Device Routing Invert Outlet Devices #1 Primary 447 50' 36.0" Round Culvert L= 60 0' RCP, groove end projecting, Ke= 0 200 Inlet / Outlet Invert= 447 50' / 447.00' S= 0 00837 Cc= 0 900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 45150' 2.3" Vert. Orifice C= 0 600 #3 Device 1 454 00' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 18 cfs @ 0 34 hrs HW =453 29' (Free Discharge) L = Culvert (Passes 0 18 cfs of 80.51 cfs potential flow) , 2_Orifice (Orifice Controls 0 18 cfs @ 6 28 fps) 3 Orifice /Grate ( Controls 0 00 cfs) BMP #3 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =4.76 in /hr Prepared by Ketchem - Crowder & Associates Printed 3/18/2013 HydroCAD ®10 00 s/n 07807 @2012 HydroCAD Software Solutions LLC w J 3 0 LL Pond 2P: BMP #3 Hydrograph Time (hours) F Inflow Primary BMP #3 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =6 13 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD®10 00 s/n 07807 @2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP #3 Inflow Area = 15.700 ac, 39 49% Impervious, Inflow Depth = 0 60" Inflow = 56 25 cfs @ 0 17 hrs, Volume= 0 788 of Outflow = 0 20 cfs @ 0 34 hrs, Volume= 0 048 af, Atten= 100 %, Lag= 10 4 min Primary = 0 20 cfs @ 0 34 hrs, Volume= 0 048 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 453 74'@ 0 34 hrs Surf Area= 17,879 sf Storage = 34,183 cf Plug -Flow detention time= 91 1 min calculated for 0 048 of (6% of inflow) Center -of -Mass det time= 83 5 min ( 93 5 - 10 0 ) Volume Invert Avail Storage Storage Description #1 451 50' 58,292 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 45150 10,718 6200 0 0 10,718 452.00 14,170 6930 6,202 6,202 18,352 45300 16,281 7140 15,213 21,415 20,807 45400 18,453 7340 17,356 38,771 23,222 45500 20,610 6440 19,522 58,292 33,116 Device Routing Invert Outlet Devices #1 Primary 447 50' 36.0" Round Culvert L= 60 0' RCP, groove end projecting, Ke= 0 200 Inlet / Outlet Invert= 447 50'/ 447 00' S= 0 0083'/' Cc= 0 900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 45150' 2.3" Vert. Orifice C= 0 600 #3 Device 1 454 00' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads rimary OutFlow Max =O 20 cfs @ 0 34 hrs HW =453 74' (Free Discharge) = Culvert (Passes 0 20 cfs of 85 73 cfs potential flow) 2= Orifce (Onfce Controls 0 20 cfs @ 7 04 fps) 3= Orifice /Grate ( Controls 0 00 cfs) BMP #3 -Post - rev 1 -2 -13 Rainfall Duration =90 min, lnten =6.93 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 60 55 50 45 40 35 U c 30 LL 25 20 15 10 5 0 0 i 2 3 Pond 2P; BMP#3 Hydrograph Time (hours) Inflow a Primary BMP #3 -Post - rev 1 -2 -13 Rainfag Duration =10 min, Inten =8 40 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD ®10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#3 Inflow Area = 15 700 ac, 39 49% Impervious, Inflow Depth = 0 83" Inflow = 77 08 cfs @ 0 17 hrs, Volume= 1 080 of Outflow = 8.08 cfs @ 0 32 hrs, Volume= 0 214 af, Atten= 90 %, Lag= 8 9 min Primary = 8 08 cfs @ 0 32 hrs, Volume= 0 214 of Routing by Stor -Ind method, Time Span= 0.00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 454 33' @ 032 hrs Surf Area= 19,169 sf Storage= 45,247 cf Plug -Flow detention time= 40 0 min calculated for 0 213 of (20% of inflow) Center -of -Mass det time= 34 6 min ( 44 7 - 10 0 ) Invert Avail Storage Storage Description _Volume #1 451 50' 58,292 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Penm Inc Store Cum.Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 45150 10,718 6200 0 0 10,718 45200 14,170 6930 6,202 6,202 18,352 45300 16,281 7140 15,213 21,415 20,807 45400 18,453 7340 17,356 38,771 23,222 45500 20,610 644.0 19,522 58,292 33,116 Device Routing Invert Outlet Devices #1 Primary 447 50' 36.0" Round Culvert L= 60 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 447 50'/447 00' S= 0 0083 'f Cc= 0 900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 451 50' 2.3" Vert. Orifice C= 0 600 #3 Device 1 454 00' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =8 05 cfs @ 0 32 hrs HW=454 33' (Free Discharge) t-17—culvert (Passes 8 05 cfs of 92 30 cfs potential flow) 2 =10rifce (Orifice Controls 0 23 cfs @ 7 96 fps) 3 Orifice /Grate (Weir Controls 7 82 cfs @ 188 fps) BMP #3 -Post - rev 1 -2 -13 Rainfall Duration =90 min, Inten =8.40 in /hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 85 80 75 70 65 60 55 50 45 o 40 LL 35 30 25 20 15 10 5 0 0 1 2 3 Pond 2P: BMP #3 Hydrograph Time (hours) TInflow M Primary COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC Section 2: 1 -yr 24 -hr & 10 -yr 24 -hr Pre/Post Routing Stormwater Management Report March 15, 2013 BMP #3 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0 12 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD810 00 s/n 07807 02012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#3 Inflow Area = 15 700 ac, 39 49% Impervious, Inflow Depth > 0 21" Inflow = 1.12 cfs @ 0 17 hrs, Volume= 0 271 of Outflow = 0 12 cfs @ 3 00 hrs, Volume= 0.018 af, Atten= 89 %, Lag= 169 8 min Primary = 0 12 cfs @ 3 00 hrs, Volume= 0 018 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 452 31' @ 300 hrs Surf.Area= 14,835 sf Storage= 10,992 cf Plug -Flow detention time= 104 8 min calculated for 0 018 of (7% of inflow) Center -of -Mass det time= 22 8 min ( 115 4 - 92 6 ) Invert Avail Storage Storage Description _Volume #1 451 50' 58,292 cf Custom Stage Data (Irregular) Listed below Elevation Surf-Area Penm Inc Store Cum.Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 451.50 10,718 6200 0 0 10,718 452.00 14,170 693.0 6,202 6,202 18,352 " 45300 16,281 7140 15,213 21,415 20,807 45400 18,453 7340 17,356 38,771 23,222 45500 20,610 6440 19,522 58,292 33,116 Device Routing Invert Outlet Devices #1 Primary 447 50' 36.0" Round Culvert L= 60 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 447 50'/447 00' S=000837 Cc= 0 900 n= 0 013, Flow Area= 7.07 sf #2 Device 1 45150' 2.3" Vert Orifice C= 0 600 #3 Device 1 454 00' 48.0" Horiz Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 12 cfs @ 3 00 hrs HW =452 31' (Free Discharge) t— = Culvert (Passes 0 12 cfs of 67 48 cfs potential flow) 2= Orifice (Orifice Controls 0 12 cfs @ 4 08 fps) 3 Orifice /Grate ( Controls 0 00 cfs) BMP #3 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0.12 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC N V O LL Pond 2P; BMP #3 Hydrograph Time (hours) a Inflow B Primary BMP #3 -Post - rev 1 -2 -13 Rainfall Duration= 1,440 min, lnten =0 21 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP #3 Inflow Area = 15 700 ac, 39 49% Impervious, Inflow Depth > 0.36" Inflow = 196 cfs @ 0 17 hrs, Volume= 0 474 of Outflow = 0.16 cfs @ 3 00 hrs, Volume= 0 025 af, Atten= 92 %, Lag= 169 8 min Primary = 0 16 cfs @ 3 00 hrs, Volume= 0 025 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 452 88' @ 3 00 hrs Surf Area= 16,018 sf Storage= 19,519 cf Plug -Flow detention time= 103 4 min calculated for 0 025 of (5% of inflow) Center -of -Mass det time= 20 0 min ( 112 6 - 92 6 ) Volume Invert Avail Storage Storage Description #1 45150' 58,292 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 45150 10,718 6200 0 0 10,718 45200 14,170 6930 6,202 6,202 18,352 45300 16,281 7140 15,213 21,415 20,807 45400 18,453 7340 17,356 38,771 23,222 45500 20,610 6440 19,522 58,292 33,116 Device Routing Invert Outlet Devices #1 Primary 447.50' 36.0" Round Culvert L= 60 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 447 50'/447 00' S= 0 0083 '/' Cc= 0 900 n= 0 013, Flow Area= 7 07 sf #2 Device 1 45150' 2.3" Vert. Orifice C= 0 600 #3 Device 1 454 00' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 16 cfs @ 3 00 hrs HW =452 88' (Free Discharge) = Culvert (Passes 0 16 cfs of 75 21 cfs potential flow) 2= Orifice (Orifice Controls 0 16 cfs @ 5 45 fps) 3= Orifice /Grate ( Controls 0 00 cfs) BMP #3 -Post - rev 1 -2 -13 Rainfall Duration =1, 440 min, lnten =0.21 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC a U 0 0 1 LL Pond 2P: BMP #3 Hydrograph Time (hours) ! Inflow ■ Primary COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #3: DWQ Supplements Supplement 1: Wet Detention Basin Supplement Supplement 2: Wet Detention Basin O &M Agreement Supplement 3: Required Items Checklist Stormwater Management Report March 15, 2013 Permit (to be provided by DWQ) I. PROJECT INFORMATION Project name COLVIN PARK SUBDIVISION Contact person BRIAN KETCHEM, PE Phone number 919- 724 -0624 Date 3/15/2013 Drainage area number II. DESIGN INFORMATION WDENR Drainage area STORMWATER MANAGEMENT PERMIT APPLICATION FORM Impervious area, post - development 401 CERTIFICATION APPLICATION FORM % impervious WET DETENTION BASIN SUPPLEMENT Design rainfall depth This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name COLVIN PARK SUBDIVISION Contact person BRIAN KETCHEM, PE Phone number 919- 724 -0624 Date 3/15/2013 Drainage area number II. DESIGN INFORMATION Site Characteristics Drainage area 683,892 f? Impervious area, post - development 270,072 ftz % impervious 39.49 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre- development 1 -yr, 24 -hr runoff Post - development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre /post control of the 1yr 24hr storm peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre - development Rational C, post- development Rainfall intensity: 1 -yr, 24 -hr storm Pre - development 1 -yr, 24 -hr peak Ilow Post - development 1 -yr, 24 -hr peak flow PrelPost 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 'I Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation. Sediment storage provided Is there additional volume stored above the state - required temp. pool? Elevation of the top of the additional volume 23,105 ft3 58,308 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.9 in 0.20 (unitless) 0.52 (unitless) 0.12 in /hr OK 0.59 ft3 /sec 1.12 ft3 /sec 0.53 ft3 /sec 454.33 fmsl 451.50 fmsl 451.25 fmsl 452.00 fmsl 451.00 fmsl 447.50 fmsl 446.50 fmsl 1.00 ft N (Y or N) fmsl Forrn SW40I -Wet Detention Basin- Rev.9- 4118/12 Parts I. & 11. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) 1II DESIGN INFORMATION 3 :1 Surface Areas 85 % Area, temporary pool 20,610 ftz Area REQUIRED, permanent pool 11,695 flz SAIDA ratio 1.71 (unitless) Area PROVIDED, permanent pool, Apenn�od 11,726 ft` OK Area, bottom of 10ft vegetated shelf, Ab, shI„ 9,504 ft Area, sediment cleanout, top elevation (bottom of pond), Abotyond 4,487 ft' Volumes 11,726 ftz Volume, temporary pool 58,308 ft' OK Volume, permanent pool, VP,. P., 26,603 ft3 Volume, forebay (sum of forebays if more than one forebay) 5,712 ft3 Foeebay % of permanent pool volume 21.5% % OK SAIDA Table Data 3 :1 Design TSS removal 85 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 1.71 (unidess) Average depth (used in SAIDA table): OK Calculation option 1 used? (See Figure 10 -2b) N (Y or N) Volume, permanent pool, Vpe<,,,yw, 2503 ft' Area provided, permanent pool, Apes, -Poo, 11,726 ftz Average depth calculated ft Need 3 ft min. Average depth used in SA /DA, dov, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10 -2b) Y (Y or N) Area provided, permanent pool, Ape _pwj 11,726 ft` Area, bottom of 10ft vegetated shelf, Awl shelf 9,504 ftz Area, sediment cleanout, top elevation (bottom of pond), Aborpond 4,487 ftz "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 3.50 It Average depth calculated 3.00 ft OK Average depth used in SAIDA, dav, (Round to down to nearest 0.5ft) 3.0 ff OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.30 in Area of orifice (if- non - circular) in Coefficient of discharge (Co) 0.60 (unitless) Driving head (Ho) 2.83 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C,v) ( unitless) Length of weir (L) ft Driving head (H) ft Pre - development 1 -yr, 24 -hr peak flow 0.59 ft3 /sec Post- development 1 -yr, 24 -hr peak flow 1.12 ft3 /sec Storage volume discharge rate (through discharge orifice or weir) 0.12 ft3 /sec Storage volume drawdown time 4.50 days OK, draws down in 2 -5 days. Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow 8. orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build out? Drain mechanism for maintenance or emergencies is: Form SW40I -Wei Detention Basin- Rev.9- 4/18/12 Parts I. 3 !I. Design Summary, Page 2 of 2 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK Y C( or N) OK 1.5 ft OK Y (Y or N) OK `( (Y or N) OK Y (Y or N) OK Orifice with manual valve control Form SW40I -Wei Detention Basin- Rev.9- 4/18/12 Parts I. 3 !I. Design Summary, Page 2 of 2 Permit Number- (to be provided by DWQ) Drainage Area Number Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be m,nin- zed to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is present Remove the trash debris The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide hme and a one -time fertilizer application Vegetation is too short or too long Maintain vegetation at a height of approximately six inches Form SW401 -Wet Detention Basin O &M -Rev 4 Page 1 of 4 Permit Number (to be provided by DWQ) Drainage Area Number BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged Unclog the pipe. Dispose of the swale sediment off -site The pipe is cracked or Replace the pipe otherwise damaged Erosion is occurring in the Regrade the swale if necessary to swale smooth it over and provide erosion control devices such as reinforced turf matting or nprap to avoid future problems with erosion. The forebay Sediment has accumulated to a depth greater than the Search for the source of the sediment and remedy the problem if original design depth for possible Remove the sediment and sediment storage dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred Provide additional erosion protection such as reinforced turf matting or nprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand If pesticide is used, wipe it on the plants rather than s ra The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health Plants are dead, diseased or Determine the source of the dying problem soils, hydrology, disease, etc. Remedy the problem and replace plants Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present Remove the weeds, preferably by hand If pesticide is used, wipe it on the plants rather than spraying The main treatment area Sediment has accumulated to a depth greater than the original design sediment Search for the source of the sediment and remedy the problem if possible. Remove the sediment and storage depth dispose of it in a location where it will not cause impacts to streams or the BMP Algal growth covers over 50% of the area Consult a professional to remove and control the algal growth Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface Form SW401 -Wet Detention Basin O &M -Rev 4 Page 2 of 4 Permit Number. (to be provided by DWQ) Drainage Area Number BMP element: Potential problem: How I will remediate the problem; The embankment Shrubs have started to grow Remove shrubs immediately on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Cloggmg has occurred Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919 -733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 447.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 448 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation 4515 Sediment Removal 448 Pe anen Pool -------------- - - Volume Sediment Removal Elevation 447 5 Volume Bottom Elevatio 447 ft Mm. ------------------------------------ - - - - -- - - - - -- Sediment Bottom Elevation 446 5 1 -ft Storage Sedimei Storage FOREBAY MAIN POND Form SW441 -Wet Detention Basin O &M -Rev 4 Page 3 of 4 r Permit Number- (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:COLV IN PARK BMP drainage area number: 3 Print name:Mitchell W Sanner, III - PARKER & ORLEANS HOMEBUILDERS, INC Tttle:Division President Address:21 I James Jackson Ave Cary NC 27513 Phone:(919) 380 -7223 S ignature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president 1, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires, Form SW401 -Wet Detention Basin O &M -Rev 4 Page 4 of 4 Permit No (to be provided by DWQ) ��# ?I � ° ' ! `� fy �, , , v Jk2Y. �s{3 .F- �`. y i77`+.?�'r ' -� � a lw;�!I . � u� �� a� � ����.. ,. �, " s � .�,.�, •� ....�r�.:.c#�.:�*�fa����� �!v..s.>����2� *r+, ^ "�i:��+�.,'.,����`_3.. �.� us: �.su�,.y_,...��::,.�'�'# �..3.c._���,s��..=�.Es.. .a,:,. ,_.+��a.�•r:.� � .. Please indicate the page or plan sheet numbers where the supporting documentation can be found An Incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to Indicate the following design requirements have been met If the applicant has designated an agent, the agent may Initial below If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C-06 to 09 1 Plans (1" - 50' or larger) of the entire site showing - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement C-42 2 Partial plan (1" = 30' or larger) and details for the wet detention basin showing - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross- section, - Vegetation specification for planting shelf, and - Fitter strip C42 3 Section view of the wet detention basin (1" = 20' or larger) showing - Side slopes, 31 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures C42 4 If the basin is used for sediment and erosion control during construction, clean out of the basin Is specified on the plans prior to use as a wet detention basin SW Report 5 A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided C-18 6 A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized SW Report 7 The supporting calculations SW Report 8 A copy of the signed and notarized operation and maintenance (0 &M) agreement N/A 9 A copy of the deed restrictions (If required) SW Report 10 A soils report that is based upon an actual field Investigation, soil bonngs, and Infiltration tests County soil maps are not an acceptable source of soils information Form SW401 -Wet Detention Basin -Rev 9- 4/18/12 Part III Required Items Checklist, Page 1 of 1 Stormwater Management Report COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #4: Design Calculations (Volume, Surface Area, and Orifice) March 15, 2013 BMP Sizing Worksheet: BMP #4 - Wet Pond Proiect Name Colvin Park Proiect # City /State Apex, NC Date 3/15/2013 Table 10.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant 0 w _i C#fwlnnwv in }he Didu4mnnt % Impervious Cover Permanent Pool Depth (feet) 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 059 049 043 035 031 029 026 20 097 079 070 059 051 046 044 30 134 108 097 083 070 064 062 40 1 73 143 125 105 090 082 077 50 206 173 150 130 1 09 100 092 60 240 203 171 1 51 129 118 1 10 70 288 240 207 179 154 135 126 80 336 278 238 210 186 160 142 90 374 310 1 266 234 211 183 167 Source NCDENR/DWQ Stormwater Best Management rracnces, pg o, /Apni i aaa STORMWATER BMP 4 - WET POND (25% TN Removal) Land Use Area ac % IA Imp. Area ac Roadway & Sidewalk 080 100 08 Lots 4 + 2ex @ 3,500s 050 100 05 2405 sq ft Normal pool elevation = 4365 feet Pervious Area 170 0 00 Totals 3.00 Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) 1.3 DA Height(H) 46 ft Length(L) 1450 ft tc (Kirpich) 10 min Total % Impervious Surface Area = 43.3 % ' Surface Area of Permanent Pool: Calculated depth = 30 feet Rounded Down from Option 2 SA/DA ratio = 1.84 % From Table 10 1 Minimum pond surface area (SA) _ (DA " SA/DA ratio) /100 SA = 0.055 acres 2405 sq ft Normal pool elevation = 4365 feet Surface area provided = 0.114 acres 4973 sq ft 1 -Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0 05 + 0 009(1) where, Rv = Runoff coefficient, in /in I = Percent impervious Rv = 044 in /in Total runoff volume from 1 -inch precipitation Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.110 acre -ft 4792 cu ft WQ Head = 08 feet Water quality pool elevation= 4373 feet Colvin Park Subdivision - BMP 4 Detention Basin Volume Verification POND FOREBAY Frustrum Pyramid Frustrum Pyramid 432 616.58 433 274.92 433 951.82 778.16 434 522.15 391.98 434 1,359.07 1,149.42 435 820.81 665.87 435 1,838.32 1,592.67 436 1,177.42 993.77 436 2,389.56 2,107.93 436.5 1,424.94 649.61 Perm Pool 436.5 3,547.89 1,47436 Perm Pool 437 1,590.02 753.36 437 4,678.91 2,050.19 438 2,060.57 1,820.22 438 5,507.39 5,087.53 VOLUME ABOVE NWL (03) 2,573.58 VOLUME ABOVE NWL (ff3) 7,137.72 TOTAL VOLUME (ff3) 5,274.82 TOTAL VOLUME (ff3) 14,240.75 Forebay= 22% Total Volume Aboffomsh.f = 3,566.98 ft SA @ Perm Pool = 4,972.83 SF Aperm pool = 4,972.83 ft VOLUME ABOVE PP (ff3) 9.711.30 Abon mpond = 1,138.73 ft VOLUME AT PP (ff3) 12,514.96 Depth = 4 ft TOTAL VOLUME (ft3)- 19,515.56 Calculated Avg Depth = 3.1 ft Option 2 Water Quality Volume = 4,792 Water Quality Elevation = 437.3 Orifice Head = 0.8 Pre -Post Analysis Drainage Area = 7.2 acres " 1 -year 24 -hour rainfall event (i = 0.119 in /hr) Pre - development Composite C: Pre - development Q = CiA = 0.17 cfs Surface C Acreage Totals Post - developmef BMP outflow = 0.03 cfs Unimproved Area: 0.35 0.0 0.00 Roof: 1.00 0.1 0.10 * 10 -year 24 -hour rainfall event (i = 0.21 in /hr) Wooded Area: 0.15 1.7 0.26 Pre - development Q = CiA = 0,30 cfs Lawns: 0.20 1.2 0.24 Post - developmef BMP outflow = 0.03 cfs Composite C = 0.20 ORIFICE & LEVEL SPREADER WORKSHEET STORMWATER BMP 4 WET POND (25% TN Removal) Orifice Calculator Q = Cd *A *(2gh) "(1/2) 1 Water Quality Volume Draw -down Variables WQ Volume 0 11 Acre -ft 47916 cf Head 0 8 ft 0.26 ft Draw down time 48 hrs 172800s Orifice Area = 0 01 sq ft 162 sq in Orifice Diameter = 144 in 1 Max Stage Draw -down Variables Volume 0 22 Acre -ft 9711 298 cf Head 15 ft 0 50 ft Draw down time 86 hrs 309600s Orifice Area = 0 01 sq ft 1 33 sq in Orifice Diameter = 1 30 in Q = USE 1.3" DIAMETER ORIFICE Orifice Area = 4 15 sq. in Level Spreader Sizing: Q at 10 -yr storm = 0 04 cfs Level Spreader @ 50 ft/cfs (10' min) = 10 ft 3/15/2013 Constants g = 322 ft/s2 Cd= 06 Constants g = 322 ft/s2 Cd= 06 0 03 cfs COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #4: HydroCAD Routing (summary & xydrographs) Section 1: 2 -yr, 10 -yr & 100 -yr Pond routing Section 2: 1 -yr 24 -hr & 10 -yr 24 -hr Pre/Post Routing Stormwater Management Report March 15, 2013 COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC Section 1: 2 -yr, 10 -yr & 100 -yr Pond routing Stormwater Management Report March 15, 2013 BMP #4 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =4 76 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#4 Inflow Area = 3 000 ac, 43 33% Impervious, Inflow Depth = 0 48" Inflow = 8 63 cfs @ 0 17 hrs, Volume= 0 121 of Outflow = 0 04 cfs @ 0.34 hrs, Volume= 0 009 af, Atten= 100 %, Lag= 10 4 min Primary = 004 cfs @ 034 hrs, Volume= 0 009 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 437 35'@ 0 34 hrs Surf Area= 6,798 sf Storage= 5,238 cf Plug -Flow detention time= 90.9 min calculated for 0 009 of (8% of inflow) Center -of -Mass det. time= 83 5 min ( 93 5 - 10 0 ) Volume Invert Avail Storage Storage Descnption #1 436 50' 9,810 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) _ 43650 4,973 3716 0 0 4,973 43700 6,367 4004 2,828 2,828 6,753 43800 7,615 4220 6,982 9,810 8,225 Device Routing Invert Outlet Devices #1 Primary 432 00' 18.0" Round Culvert L= 48 0' RCP, groove end projecting, Ke= 0 200 Inlet / Outlet Invert= 432.00'/ 430 00' S= 0.0417'/' Cc= 0 900 n= 0.013, Flow Area= 1 77 sf #2 Device 1 436 50' 1.3" Vert. Orifice C= 0 600 #3 Device 1 437 75' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 04 cfs @ 0 34 hrs HW =437 35' (Free Discharge) t- = Culvert (Passes 0 04 cfs of 22 80 cfs potential flow) 2_Orifice (Onfce Controls 0 04 cfs @ 4 28 fps) 3 Orifice /Grate ( Controls 0 00 cfs) BMP #4 -Post - rev 1 -2 -13 Rainfall Duration =90 min, Inten =4.76 in /hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD ®10.00 s/n 07807 O 2012 HydroCAD Software Solutions LLC N V 3 O LL Pond 2P; BMP#4 Hydrograph Time (hours) Inflow ® Primary BMP #4 -Post - rev 1 -2 -13 Rainfall Duration= 10 min, Inten =6 13 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD010 00 s/n 07807 02012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#4 Inflow Area = 3 000 ac, 43 33% Impervious, Inflow Depth = 0 62" Inflow = 11 11 cfs @ 0 17 hrs, Volume= 0 156 of Outflow = 0 04 cfs @ 0 34 hrs, Volume= 0 010 af, Atten= 100 %, Lag= 10 4 min Primary = 0.04 cfs @ 0 34 hrs, Volume= 0 010 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 437 56'@0 34 hrs Surf Area= 7,068 sf Storage= 6,750 cf Plug -Flow detention time= 91 1 min calculated for 0 010 of (7% of inflow) Center -of -Mass det. time= 83 5 min ( 93 5 - 10 0 ) Volume Invert Avail Storage Storage Description #1 436 50' 9,810 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Penm Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic-feet) (cubic -feet) (sq -ft) 43650 4,973 3716 0 0 4,973 437.00 6,367 4004 2,828 2,828 6,753 43800 7,615 4220 6,982 9,810 8,225 Device Routing Invert Outlet Devices #1 Primary 432 00' 18.0" Round Culvert L= 48 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 432 00' /430 00' S=00417? Cc= 0 900 n= 0 013, Flow Area= 177 sf #2 Device 1 436 50' 1.3" Vert. Orifice C= 0 600 #3 Device 1 437 75' 48.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =O 04 cfs @ 0 34 hrs HW =437 56' (Free Discharge) = Cuivert (Passes 0 04 cfs of 23 33 cfs potential flow) 2=Orifice (Orifice Controls 0 04 cfs @ 4 83 fps) 3=Orifice/Grate ( Controls 0 00 cfs) BMP #4 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =6.13 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC a� U 3 0 LL Pond 2P: BMP#4 Hydrograph Time (hours) ■ Inflow ■ Primary BMP #4 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =8 40 in/hr Prepared by Ketchem - Crowder & Associates Printed 3/18/2013 HydroCADO 10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#4 Inflow Area = 3 000 ac, 43 33% Impervious, Inflow Depth = 0 85" Inflow = 15 23 cfs @ 0 17 hrs, Volume= 0 213 of Outflow = 1 86 cfs @ 0 31 hrs, Volume= 0 036 af, Atten= 88 %, Lag= 8 8 min Primary = 186 cfs @ 0 31 hrs, Volume= 0 036 of Routing by Stor -Ind method, Time Span= 0.00 -3 00 hrs, dt= 0 01 hrs Peak Elev= 437 87' @ 0 31 hrs Surf Area= 7,459 sf Storage= 8,935 cf Plug -Flow detention time= 42 2 min calculated for 0 036 of (17% of inflow) Center -of -Mass det time= 36 5 min ( 46 5 - 10.0 ) Volume Invert Avail Storage Storage Description #1 436 50' 9,810 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Penm Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 43650 4,973 3716 0 0 4,973 43700 6,367 4004 2,828 2,828 6,753 43800 7,615 4220 6,982 9,810 8,225 Device Routing Invert Outlet Devices #1 Primary 432 00' 18.0" Round Culvert L= 48 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 432 00'/430 00' S= 0 0417 T Cc= 0 900 n= 0 013, Flow Area= 177 sf #2 Device 1 436 50' 1.3" Vert. Orifice C= 0 600 #3 Device 1 437 75' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =1 85 cfs @ 0 31 hrs HW =437 87' (Free Discharge) = Culvert (Passes 185 cfs of 24 08 cfs potential flow) 2 =Orifice (Orifice Controls 0 05 cfs @ 5 53 fps) 3 =Orifice /Grate (Weir Controls 180 cfs @ 1 15 fps) BMP #4 -Post - rev 1 -2 -13 Rainfall Duration =10 min, Inten =8.40 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 17 16 15 14 13 12 11 10 N 9 0 6 LL 7 6 5 4 3 2 1 0 0 Pond 2P; BMP#4 Hydrograph 1 2 3 Time (hours) 3 Inflow M Primary COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC Section 2: 1 -yr 24 -hr & 10 -yr 24 -hr Pre /Post Routing Stormwater Management Report Mardi 15, 2013 BMP #4 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0 12 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD®10 00 s/n 07807 4 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#4 Inflow Area = 3 000 ac, 43 33% Impervious, Inflow Depth > 0 21" Inflow = 0 22 cfs @ 0 17 hrs, Volume= 0 053 of Outflow = 0 03 cfs @ 3 00 hrs, Volume= 0 004 af, Atten= 89 %, Lag= 169 8 min Primary - 0 03 cfs @ 3 00 hrs, Volume= 0 004 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0.01 hrs Peak Elev= 436 88'@ 3 00 hrs Surf Area= 6,041 sf Storage= 2,167 cf Plug -Flow detention time= 107 2 min calculated for 0 004 of (7% of inflow) Center -of -Mass det time= 25 2 min ( 117 8 - 92 6 ) Volume Invert Avail Storage Storage Description #1 436 50' 9,810 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Perim Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 43650 4,973 3716 0 0 4,973 43700 6,367 4004 2,828 2,828 6,753 43800 7,615 4220 6,982 9,810 8,225 Device Routing Invert Outlet Devices #1 Primary 432 00' 18.0" Round Culvert L= 48 0' RCP, groove end projecting, Ke= 0 200 Inlet/ Outlet Invert= 432 00'1430 00' S= 0 0417 '/' Cc= 0 900 n= 0 013, Flow Area= 177 sf #2 Device 1 436 50' 1.3" Vert. Orifice C= 0 600 #3 Device 1 437 75' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 03 cfs @ 3 00 hrs HW =436 88' (Free Discharge) t- Culvert (Passes 0 03 cfs of 21.62 cfs potential flow) 2= 0rifice (Orifice Controls 0 03 cfs @ 2 76 fps) r 3 Orifice /Grate ( Controls 0 00 cfs) BMP #4 -Post - rev 1 -2 -13 Rainfall Duration =1,440 min, Inten =0.12 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD® 10.00 s/n 07807 © 2012 HydroCAD Software Solutions LLC N U O LL Pond 2P: BMP#4 Hydrograph Time (hours) Inflow ® Primary BMP #4 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0 21 in/hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCADO 10 00 s/n 07807 C 2012 HydroCAD Software Solutions LLC Summary for Pond 2P: BMP#4 Inflow Area = 3 000 ac, 43.33% Impervious, Inflow Depth > 0 37" Inflow = 0 39 cfs @ 0.17 hrs, Volume= 0 094 of Outflow = 0 03 cfs @ 3 00 hrs, Volume= 0 005 af, Atten= 91 %, Lag= 169 8 min Primary = 0 03 cfs @ 3 00 hrs, Volume= 0 005 of Routing by Stor -Ind method, Time Span= 0 00 -3 00 hrs, dt= 0.01 hrs Peak Elev= 437 14'@ 3 00 hrs Surf Area= 6,548 sf Storage= 3,840 cf Plug -Flow detention time= 104 8 min calculated for 0 005 of (6% of inflow) Center -of -Mass det time= 217 min ( 114 4 - 92 6 ) Volume Invert Avail Storage Storage Description #1 436.50' 9,810 cf Custom Stage Data (Irregular) Listed below Elevation Surf Area Penm Inc Store Cum Store Wet Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 43650 4,973 3716 0 0 4,973 43700 6,367 4004 2,828 2,828 6,753 43800 7,615 4220 6,982 9,810 8,225 Device Routing Invert Outlet Devices #1 Primary _ 432 00' 18.0" Round Culvert L= 48 0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 432.00'/430 00' S= 0 0417'/' Cc= 0 900 n= 0.013, Flow Area= 177 sf #2 Device 1 436 50' 1.3" Vert. Orifice C= 0 600 #3 Device 1 437 75' 48.0" Horiz. Orifice /Grate C= 0 600 Limited to weir flow at low heads Primary OutFlow Max =O 03 cfs @ 3 00 hrs HW =437 14' (Free Discharge) t— = Culvert (Passes 0 03 cis of 22 30 cfs potential flow) 2 =Orifice (Onfice Controls 0 03 cfs @ 3 70 fps) 3 Orifice /Grate ( Controls 0 00 cfs) BMP #4 -Post - rev 1 -2 -13 Rainfall Duration= 1, 440 min, Inten =0.21 in /hr Prepared by Ketchem- Crowder & Associates Printed 3/18/2013 HydroCAD ®10 00 s/n 07807 © 2012 HydroCAD Software Solutions LLC 0 a 0 0 0 0. 0. 0. U V. 0 U. 0. 0. 0. 0 0 0 0. 0 Pond 2P; BMP#4 Hydrograph VO 1 2 3 Time (hours) Inflow ® Primary COLVIN PARK SUBDIVISION STORMWATER MANAGEMENT REPORT STEPHENSON ROAD APEX, NC BMP #4: DWQ Supplements Supplement 1: Wet Detention Basin Supplement Supplement 2: Wet Detention Basin O &M Agreement Supplement 3: Required Items Checklist Stormwater Management Report March 15, 2013 Permit No. (to be provided by DWQ) NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name COLVIN PARK SUBDIVISION Contact person BRIAN KETCHEM, PE Phone number 919- 724-0624 Date 3/15/2013 Drainage area number 4 II. DESIGN INFORMATION Site Characteristics Drainage area 130,680 fe Impervious area, post- development 56,628 ft % impervious 43.33 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre- development 1 -yr, 24 -hr runoff Post - development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre /post control of the lyr 24hr storm peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre - development Rational C, post - development Rainfall intensity: 1 -yr, 24 -hr storm Pre- development 1 -yr, 24 -hr peak flow Post - development 1 -yr, 24 -hr peak flow Pre /Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of I Oft vegetated shelf elevation Sediment deanou4, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state - required temp. pool? Elevation of the Lop of the additional volume 4,792 ft3 9,711 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) 2.9 in 0.20 (unitless) 0.56 (unidess) 0.12 in /hr OK 0.17 ft3 /sec 0.22 ft3 /sec 0.05 ft3 /sec 437.87 fmsl 436.50 fmsl 436.00 fmsl 437.00 fmsl 436.00 fmsl 432.00 fmsl 431.00 fmsl '1.00 ft N (Y or N) fmsi Form SW401 -Wet Detention Basin- Rev.9- 4/1 811 2 Parts I. 3, II. Design Summary, Page 'I of 2 II. DESIGN INFORMATION Surface Areas Area. temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Apempool Area, bottom of 1 Oft vegetated shelf, Abot shell Area, sediment cleanout, top elevation (bottom of pond), Ab t ,.d Volumes Volume, temporary pool Volume, permanent pool, Voef11,_pd Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain /Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10 -2b) Volume, permanent pool, Vpem _pool Area provided, permanent pool, Ap,. -P , Average depth calculated Average depth used in SAIDA, day, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10 -2b) Area provided, permanent pool, Ap ,_pwl Area, bottom of 1 Oft vegetated shelf, Abo, shelf Area, sediment cleanout, top elevation (bottom of pond), Aboayond 7,568 ft3 2,405 ft' 1.84 ( unitless) 4,973 ft` OK 3,567 ft` 1,139 ft` 9,711 ft3 OK 12,515 ft3 2,701 ft3 21.6% % OK 85 % N (Y or N) Y (Y or N) 1.84 ( unifless) N (Y or N 12,515 ft' 4,973 W It It Y (Y or N) 4,973 ft 3,567 ft 1,139 ft2 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 4.00 It Average depth calculated 3.10 It Average depth used in SAIDA, dam„ (Round to down to nearest 0.5ft) 3.0 it Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if- non - circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C,y) Length of weir (L) Driving head (H) Pre- development 1 -yr, 24 -hr peak Flow Past - development 1 -yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -our? Drain mechanism for maintenance or emergencies is: _ Y (Y or N) 1.30 in in' 0.60 ( unifless) 1.37 It N (Y or N) (unitless) (unidess) ft It 0.17 ft3/sec 0.22 ft3lsec 0.03 ft'/sec 3.58 days Need 3 It min. OK OK OK, draws down in 2 -5 days. Permit (to be provided by DWQ) Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Parts I. & II. Design Summary, Page 2 of 2 3 :1 OK 10 :1 OK 10.0 ft OK 3 J OK 2.2 :1 OK Y (Y or N) OK 1.0 It OK Y (Y or N) OK. Y (Y or N) OK. Y (Y or N) OK Orifice with manual valve control Permit (to be provided by DWQ) Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Parts I. & II. Design Summary, Page 2 of 2 Permit Number- (to be provided by DWQ) Drainage Area Number Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BUF. This maintenance record will be kept in a log in a known set location. Any deficient BNT elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMF. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash debris is present Remove the trash/ debris The perimeter of the wet Areas of bare soil and /or Regrade the soil if necessary to detention basin erosive gullies have formed remove the gully, and then plant a ground cover and water until it is established Provide lime and a one -time fertilizer application. Vegetation is too short or too Maintam vegetation at a height of long approximately six inches Form SW401 -Wet Detention Basin O &M -Rev 4 Page 1 of 4 Permit Number (to be provided by DWQ) Drainage Area Number BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or nprap to avoid future problems with erosion. The forebay Sedunent has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for sediment storage. possible. Remove the sediment and dispose of it m a location where it will not cause impacts to streams or the BMP Erosion has occurred Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying problem- soils, hydrology, disease, etc. Remedy the problem and replace plants Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if ongunal design sediment possible Remove the sediment and storage depth dispose of it in a location where it will not cause impacts to streams or the BMP Algal growth covers over Consult a professional to remove 500 of the area and control the algal growth Cattails, phragmutes or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface Form SW401 -Wet Detention Basin O &M -Rev 4 Page 2 of 4 Permit Number (to be provided by DWQ) Drainage Area Number* BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately on the embankment Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of damage have occurred at the Contact the local NC Division of Water Quality Regional Office, or outlet the 401 Oversight Unit at 919 -733- 1786 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 432 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 433 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 436 5 - Sediment Removal .4 33 Pe anen Pool -------------- - - Volume Sediment Removal Elevation 432 Volume Bottom Elevatio 432 ft Min Sediment Bottom Elevation 431 1 f Storage Sednmei Storage FOREBAY MAIN POND Form SW401 -Wet Detention Basin O &M -Rev 4 Page 3 of 4 Permit Number (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:COLVIN PARK BMP drainage area number: 4 Print name:Mitchell W Sanner, III - PARKER & ORLEANS HOMEBUILDERS INC Title:Division President Address:21 I James Jackson Ave Cary, NC 27513 Phone:(919) 380 -7223 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401 -Wet Detention Basin O &M -Rev 4 Page 4 of 4 Permit No (to be provided by DWQ) Please Indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial In the space provided to Indicate the following design requirements have been met If the applicant has designated an agent, the agent may Initial below ff a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C-06 to 09 1 Plans (1" - 50' or larger) of the entire site showing - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement C42 2 Partial plan (1" = 30' or larger) and details for the wet detention basin showing - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross - section, - Vegetation specification for planting shelf, and - Filter strip C42 3 Section view of the wet detention basin (1" = 20' or larger) showing - Side slopes, 31 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures C-42 4 If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin SW Report 5 A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided C-18 6 A construction sequence that shows how the wet detention basin well be protected from sediment until the - entire drainage area is stabilized SW Report 7 The supporting calculations SW Report 8 A copy of the signed and notarized operation and maintenance (0 &M) agreement N/A 9 A copy of the deed restrictions (if required) SW Report 10 A soils report that is based upon an actual field investigation, soil bonngs, and infiltration tests County soil maps are not an acceptable source of soils information Form SW401 -Wet Detention Basin -Rev 9.4/18112 Part III Required Items Checklist, Page 1 of 1