HomeMy WebLinkAbout20211554 Ver 1_ePCN Application_20211025DW R
mrlsloa of ware. Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 1, 2021 Ver 4.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
Yes
No
Is this project a public transportation project?*
Yes No
Change only if needed.
BIMS # Assigned*
Version#*
20211554
1
Is a payment required for this project?
No payment required
What amout is owed?*
Fee received
$240.00
Fee needed - send electronic notification
$570.00
Reviewing Office*
Select Project Reviewer*
Washington Regional Office - (252) 946-6481
Robert Tankard:eads\rbtankard
Information for Initial Review
1a. Name of project:
Pasquotank County C& D Landfill
la. Who is the Primary Contact?*
McDowell & Associates/Attn: Mr. Pat McDowell
1 b. Primary Contact Email: * 1c. Primary Contact Phone:*
patmcdow@aol.com (252)338-4598
Date Submitted
10/25/2021
Nearest Body of Water
Halls Creek
Basin
Pasquotank
Water Classification
SC
Site Coordinates
Latitude:
Longitude:
36.236972
-76.267333
A. Processing Information
County (or Counties) where the project is located:
Pasquotank
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
Pre -Filing Meeting Information
Is this a courtesy copy notification?*
Yes No
ID#
Version
Pre -fling Meeting or Request Date
9/30/2020
Attach documentation of Pre -Filing Meeting Request here:
Click the upload button or drag and drop files here to attach document
DWR Pre -Filing Request Form-10-25-21 PCN Submittal.pdf
File type must be PDF
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?
Yes
No
1 b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
39 - Commercial/Institutional Developments
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
974KB
401 Water Quality Certification - Express
Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?"
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1 h. Is the project located in any of NC's twenty coastal counties?
Yes No
1 i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?"
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Pasquotank County
2b. Deed book and page no.:
500/551
Yes No
Yes No
2c. Contact Person:
Brad Gardner, Director of Solid Waste
2d.Address
Street Address
317 Pritchard Street
Address Line 2
City
Elizabeth City
Postal / Zip Code
27909
2e. Telephone Number:
(252)3354105
2g. Email Address:*
gardnerb@pasquotank.nc.us
4. Agent/Consultant (if applicable)
4a. Name:
George H. Wood, CEP, PWS
4b. Business Name:
Environmental Professionals, Inc.
4c.Address
Street Address
224 Colington Ridge
Address Line 2
City
Kill Devil Hills
Postal / Zip Code
27948
4d. Telephone Number:
(252)423-1234
4f. Email Address:
obxwood@yahoo.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Elizabeth City
2. Project Identification
State / Province / Region
NC
Country
USA
2f. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2a. Property Identification Number:
2b. Property size:
8901 66231B
207
2c. Project Address
Street Address
983 Simpson Ditch Road
Address Line 2
City
State / Province / Region
Elizabeth City
NC
Postal / Zip Code
Country
27909
USA
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Halls Creek
3b. Water Resources Classification of nearest receiving water:*
SC
3c. What river basin(s) is your project located in?*
Pasquotank
3d. Please provide the 12-digit HUC in which the project is located.
030102050502
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:"
The 207-acre Pasquotank County C&D Landfill site is improved with landfill cells, recycling center, transfer site, recreational areas, infrastructure improvements, and unimproved areas.
General use adjacent to the site is agriculture and residential. The 1.05-acre site is an unimproved wooded area.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
+/- 75 acres
4g. List the total estimated linear feet of all existing streams on the property:
0
4h. Explain the purpose of the proposed project:
The Pasquotank County C&D Landfill is a current operation off of Simpson Ditch Road which is authorized by the North Carolina Division of Solid Waste by a Life of Site permit issued
December 29, 2016. The permit has been amended several times to approve the expansions necessary to accommodate the increase in C&D materials generated by storms and
increased construction. This expansion is expected to provide capacity for 6 to 12 years.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The improvement of the site will commence with the construction of an impermeable base to manage the runoff from the C&D material. Bulldozers, dump trucks, and backhoes will be used
to develop the base and then the the cell walls. The perimeters of the cell wall will be landward of silt fencing while vegetation is allowed to permanently stabilize the slopes.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2009-00250
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): George H. Wood, PWS
Agency/Consultant Company: Environmental Professionals, Inc.
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
June 14,2021
6. Future Project Plans
6a. Is this a phased project?*
Yes No
6b. If yes, explain.
Depending on the generation of construction debris and the anticipated lifetime of the facility, additional cells may be required.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
Unknown at present
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries
Open Waters Pond Construction
2. Wetland Impacts
Buffers
2a. Site #* (?) 2a1 Reason (?) 2b. Impact type*(?) 2c. Type of W.* 2d. W. name* 2e. Forested* 2f. Type of Jurisdicition* 2g• Impact
F��7(>) area*
fill to expand cell P Bottomland Hardwood Forest cell expansion Yes Corps 0.274
acres)
2g. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.274
2i. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
2g. Total Permanent Wetland Impact
0.274
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Of the +/- 75 acres at the site only 0.274 are proposed to be impacted to provide for cell wall construction.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The cell expansion has been silted to avoid and minimize impacts. The cell wall will be stabilized, and a silt fence employed at the base of the wall until
vegetation is adequate for stabilization.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
DWR Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
Hidden Lake Mitigation Bank
3b. Credits Purchased/Requested (attach receipt and letter)
Type: Quantity:
Non -riparian wetland 0.548
3c. Comments
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
Does not meet the locational requirement.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government Stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
State Stormwater Programs
Phase II Coastal Counties
HWQ or ORW Other
u
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federallstatellocal) funds or the use of public (federallstate) land?*
Yes No
1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
Comments: *
The environmental review is managed under the North Carolina Division of Waste Management.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
Any expansion will be contained in the lined cell, and no additional fill in wetlands are currently foreseen.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Web Site Review
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
No in -water impacts
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Web Site - No structures at the site
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
Yes No
8c. What source(s) did you use to make the floodplain determination?*
Firm Panel #3720890000K
Date: December 21, 2018
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Pasquotank C&D Landfill - Misc Documents-10-25-21.pdf 7.38MB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
I intend to electronically sign and submit the PCN form.
Full Name:
George H. Wood, CEP, PWS
Signature
6;" "I Ph- Oq
Date
10/25/2021