Loading...
HomeMy WebLinkAbout20131075 Ver 1_More Info Received_20131008State of North Carolina Department of Environment and Natural Resources 1 1 Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 —Water Quality Certification, Shoreline Stabilization FORM: SSGP 10 -2013 Shoreline Stabilization Application Form Four copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 I. Applicant Information [15A NCAC 02H .0502(a)]} 1. Owner Information Name: Steuart Key Wright Mailing Address: 214 Willowbrook Drive Wilkesboro, NC 28697 Telephone Number: 336- 977 -0757 Fax Number: E -mail Address: Steuart.wright @irvannoy.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http: / /www.saw.usace.army. mil / Portals /59 /docs /regulatory /regdocs /Permits /SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Kris Little Company Affiliation: VannoV Construction Mailing Address: 1608 Hwy 221 N inn (S F-R n W7 ? Jefferson, NC 28640 Telephone Number: 336 - 877 -6501 Fax Number: l E -mail Address: kris.little@irvannoy.com Person to receive the Certification Approval: Kris Little II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10 -2013 Page 1 of 4 etc ), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4 Location of the property (where work is to be conducted) County: Wilkes Nearest Town: Wilkesboro Subdivision name or site address (include phase /lot number): See Mailing Address: This is also Physical Address Directions to site - please include road names and numbers, landmarks, etc: _ Hwy 268: Right on Jim Caudell; Left on Higgens• Left on Willowbrook 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Residential 6 Property size (acres): 7. Lake/ river/ ocean adjacent to property: Kerr Scott Lake 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Lake is eroding bank. Mr. Wright purchased property around a year ago. This work is intended to prevent further erosion of the bank 9. Will work be conducted from land? XQ From water? XQ The intent is for the track hoe to remain on land as much as possible However boom and bucket and potentially tracks may come into contact with water 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: See attached photos /dimensions total area of disturbance small 2' to 3' below normal pool 11 Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: See attached Photos /Dimensions 5'to 6' above normal pool 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Very minimal tree impact, existing is primarily brush and clay dirt FORM. SSGP 10 -2013 Page 2 of 3 Owner /Agent's Signature* [15A NCAC 02H .0502(f)] Date Agent's signature is valid only if an authorization letter from the owner is provided. Lake (At Full Pond / Normal Water Levels Full Pond/ Normal Water Level Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10 -2013 Page 3 of 3 " �_ •1'�+ � ` dam, Fs ++t,1 �.,.. - �-d- ` - t' Fir. tom, ,+ -p' '��1r!q�';~ ^se •�i M "yi. �i. Aft It- �. t• ` I 44 lb lk Aar 7w. - 4.06 ty w �1 3� ash;' ,�` ��•�� •� � `•i,:_ \ • r. maw avi", c�?di1 et�SJ •fit � ✓ �; �,: �•,� � .�� +; +� /.� ' �f i• o ,`�' r Ob Steuart Mig" P � ��d;ic�rel p e .(Left Hand Side). 1r' - .. . fi >. ;A'e Run Cvel at Wa ing path Knock Back Bank to Hold '-� �'J,�`• Vii.` New Rip Rap +� ,: Y + ' ,' �1 i �•�`f� . Per Attached Details Tn 4 Y •' r OW wave W !` . Rip Rap Edge to Gravel z Walking Path rT ?� s t _ a men t removed on this side Ilv