Loading...
HomeMy WebLinkAbout20200035 Ver 1_Pre-Filing Information_20211015Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address:* Is this a transportation project?* Charlie Neaves cneaves@wildlandseng.com NCDMS/Wildlands Engineering Liberty Rock Mitigation Site Randolph Street Address 7280 Liberty Park Ave. Address Line 2 aty Liberty Postal / Zip axle 27298 C Yes c: No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express F- Individual Permit F- Modification F- Shoreline Stabilization Does this project have an existing project ID#?* c: Yes C No Please list all existing project ID's associated with this projects.* NCDWR Project 20200035 ver 1, USACE Action ID No. SAW-2020-00047, NCDEQ contract No. 7877-01, NCDMS ID No. 100135 State / Province / Pegion NC Country United States Do you know the name of the staff member you would like to request a meeting with? Erin Davis Please give a brief project description below and include location information.* Wildlands Engineering is providing a full -delivery stream and wetland mitigation project for NCDMS in the Cape Fear 03030003 river basin. Conceptual project information is contained in the attached technical proposal. The latest IRT correspondence regarding special measures to minimize impacts to rare mussel populations is also attached. To date, detailed design and mitigation plan preparation is in progress. The project area is located at 35.820404,-79.562675. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that Icannot submit myapplication until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * Submittal Date 5/14/2021