HomeMy WebLinkAbout20131000 Ver 1_401 Application_201310131;T THE WOOTEN COMPANY ENGINEERING PLANNING ARCHITECTURE 350 Noith Cox Street Suite 26 Asheboro NC 7720' 33F. 6?E 5 ,, ?? fa. 336 526 5772 3 - i 000 LETTER OF TRANSMITTAL TO: Karen Higgins —Supervisor DATE: JOB NO.: DENR — WEBSCAPE 10/07/13 3170 -D 1650 Mail Service Center Raleigh NC 27699 -1650 RE: Town of Wingate Phase 2 Water System Improvement WE ARE SENDING: ® Attached ❑ Under separate cover via the following items: ❑ Shop Drawings F1 Prints F1 Plans ❑ Samples ❑Specifcations ❑ Copy of Letter ❑ Change Order ❑ Other: COPIES DATE NO. DESCRIPTION 1 10/01/13 17249 Check for $240.00 THESE ARE TRANSMITTED as checked below: ❑ For Signature ❑ Reviewed ❑ Revise and resubmit ❑ For your use ❑ Rejected ❑ Submit copies for distribution ® As Requested ❑ Corrected ❑ Return corrected print ❑ For Review and comment ❑ ❑ FOR BIDS DUE [ ] ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Thanks, SIGNED: COPY TO: TWC Asheboro Files M'3 �arld5 '►�u, -►N 20 1 3 1 0 0 0 V, THE WOOTEN COMPANY ENGINEERING PLANNING ARCHITECTURE 26 Asheboro NC 27203 36 f,2E 53% 336.626 5722 TO: Mike Parker 610 East Center Avenue, Suite 301 Mooresville NC 28115 WE ARE SENDING: ❑ Shop Drawings ❑ Copy of Letter LETTER OF TRANSMITTAL ,--l—b -, (��e&Js DATE: JOB NO.: 8/23/13 3170 -D RE: Town of Wingate Culvert Pines Removal — Meadow Branch ® Attached ❑ Under separate cover via the following items: ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Change Order ❑ Other: DESCRIPTION COPIES 5 DATE NO. Pre - Construction Notification (PCN) Form 0 THESE ARE TRANSMITTED as checked below: ,��vVetlb yXat, ❑ For Approval ❑ Reviewed ❑ Revise and resubmit , • For your use ❑ Rejected ❑ Submit copies for distribution • As Requested ❑ Corrected ❑ Return corrected print ❑ For Bids due ❑ M PRINTS RETURNED AFTER LOAN TO US Co n ; �vv iles -F or'[ 1 SIGNED:�� Coy �S e �0, rem YK4/ -t cs a4 u: THE August 23. 2013 WOOT N COMPANY Mr. Steven Kichefski E N G I N E E R I N G USACOE — Asheville Regulatory Field Office 151 Patton Avenue, Room 208 P L A N N I N G Asheville NC 28801 -5006 A R C H I T E C T U RE Re: Preconstruction Notification Town of Wingate Culvert Pipe Removal — Meadow Branch TWC No.: 3170 -D Dear Mr. Kichefski: On behalf of the Town of Wingate, we are submitting a Preconstruction Notification for the Culvert Pipe Removal — Meadow Branch project. Enclosed is one copy of the following items: ■ PCN Form ■ 11" x 17" Project Drawings Sheets 1 and 2 of 2 — Culvert Pipe Removal Please review the submittal and contact us with your approval, or if you have questions, comments or require additional information. Sincerely, THE WOOTEN COMPANY John C. Grey, PE Project Manager /aik Enclosures cc w /enclosures (5): Mike Parker, The Wetlands /401 Water Quality Certification Unit cc: Patrick Niland, Town of Wingate 350 North Cox Street Suite 26 Asheboro NC 27203 336.626.5322 fax 336.626.5722 o0 F v A rF90 2 0 1 3 1 0 0 0 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 a Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Culvert Pipes Removal — Meadow Branch 2b. County: Union 2c. Nearest municipality / town: Wingate 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: NA 3. Owner Information 3a. Name(s) on Recorded Deed: Town of Wingate 3b. Deed Book and Page No. Db. 417, Pg. 540 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3918 Highway 74 East 3e. City, state, zip: Wingate , NC, 28174 3f. Telephone no.: 704- 233 -4411 3g. Fax no.: 704- 233 -4412 3h. Email address: admin @wingatenc.com a Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name John C Grey, P E 5b Business name (if applicable) The Wooten Company 5c Street address 350 N Cox Street, Suite 26 5d City, state, zip Asheboro, NC, 27203 5e Telephone no 336 - 626 -5322 5f Fax no 336 -626 -5722 5g Email address jgrey@thewootencompany com Page 2 of 11 PCN Form — Version 1 3 December 10, 2008 Version B. Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 09012006 1 b Site coordinates (in decimal degrees) Latitude 35 0048 Longitude - 80 2646 (DD DDDDDD) ( -DD DDDDDD) 1c Property size 15 00 acres 2 Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Meadow Branch proposed project 2b Water Quality Classification of nearest receiving water C 2c River basin Yadkin - Pee Dee 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application This project site is the existing culvert crossing along Meadow Branch near the Town of Wingate's Abandoned WWTP 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 30 linear feet 3d Explain the purpose of the proposed project To remove existing culvert crossing of Meadow Branch and install a ford crossing to eliminate ponding upstream caused by beaver dams at the culvert Town will still need sporadic access across creek 3e Describe the overall project in detail, including the type of equipment to be used This project will remove four 42" CMP's from the existing crossing of Meadow Branch and install a permanent ford crossing in location Track mounted excavators will be utilized to remove the culverts, debris and install materials necessary for the ford crossing Erosion control devices will be implemented to keep sedimentation onsite 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / El Yes ❑ No Unknown project (including all prior phases) in the pasty Comments 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown, this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 4 of 11 PCN Form — Version 1 3 December 10, 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ®T Excavation Meadow Branch ® PER ❑ INT ® Corps ® DWQ 32 35 S2 ®P ❑ T Ford Crossing Meadow Branch ® PER ❑ INT ® Corps ® DWQ 32 10 S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 45 31 Comments Temporary impact is in the same location as the permanent impact Page 5 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑ PEI T 4f. Total open water impacts 0 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a I 5b I 5c 5d 5e Pond ID I Proposed use or purpose mber nu of pond Wetland Impacts (acres) I Stream Impacts (feet) Flooded I Filled I Excavated I Flooded I Filled I Excavated Upland (acres) Flooded P1 P2 5f. Total 0 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a Project is in which protected basin? 6b 6c 6d Buffer impact number — Reason Permanent(P)or for Temporary T im act 61 ❑P ❑T B2 ❑P ❑T B3 ❑P ❑T 61 Comments ❑ Neuse ❑ Tar - Pamlico ❑ Other ❑ Catawba ❑ Randleman 6e I 6f I 6g Buffer Zone 1 impact Zone 2 impact Stream name mitigation (square feet) (square feet) required'? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 6h Total buffer impacts 0 Page 6 of 11 PCN Form — Version 1 3 December 10, 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Limited width of travel lane of ford crossing to minimize stream disturbance 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Disturbance will be kept to a minimum Temporary stone dams and pumps will be utilized to keep sedimentation onsite 2. Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this projects ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a if using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No Comments This procect is not adjacent to a protected riparian buffer 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why This project does not require a Stormwater management Plan because it qualifies as a Low Densiy project It meets all requiements for low density projects 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? ❑ Phase ii ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been El ® No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered 'yes" to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered 'yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description The proposed improvements do not affect the development potential of the area 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? E:1 Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website was used to identify threatened and endangered species in Union County, North Carolina 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? http / /www habitat noaa gov /protection /efh /newlnv /index html 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NCDCR historic preservation website, google earth, Union County GIS 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ® Yes ❑ No 8b If yes, explain how project meets FEMA requirements The project will install a ford crossing in place of existing culverts Crossing will be installed at existing stream bed height so no flooding will be realized because of crossing 8c What source(s) did you use to make the floodplain determination? NCB Flood Maps Patnck Niland Applicant/Agent's Signature Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter from the applicant is provided ) Date Page 11 of 11 PCN Form —Version 1 3 December 10, 2008 Version V II u1 O C0 G O F- N�4 To Wingate, NC I VICINITY MAP NTS SitePlanSheetl .dgn 8/19/2013 4:39:03 PM q9a 30"cMP Inv. 49156 / b MP Inv 490.71 42 C I�\ r 9 �� A '9S. o�� n s , ... . 47� .... .. X kE'Inv." 491.83 491 00..- 492 -. _ _._ -_ r p({ `f ...._.. ...494 OV9/ ...__...495 - ..._....... ;. TEMPORARY STONE DAM ,. (SEE NOTE 1) r IG■ xD90120,06 Tor r. o' W :'ncie i Oc: 411. -IC 54e FORD CROSSING (SEE DETAIL) f Y ,. PROPOSED CREEK BANKS (TYP. BOTH SIDES) NOTES 1. INSTALL TEMPORARY STONE DAM SIMILAR TO TEMP STREAM CROSSING DETAIL TO PROVIDE DEWATERED AREA FOR CROSSING. CONTRACTOR SHALL PIPE AND PUMP STREAM FLOW AROUND WORK AREA. IF STREAM BANKS DESTABILIZE DURING CONSTRUCTION, CONTRACTOR SHALL RESTABILIZE WITH GRASS AND EROSION CONTROL MATTING. REMOVE EXISTING 42" CMP AND FILL MATERIAL TO I YZ PROVIDE CREEK CHANNEL L SITE PLAN SCALE 1" = 20' z a o_ 0 w = "€ C) W S J O 2 W cr W d CL J, Lij J M U W 20 i0 0 20 0 , SCALE: 1" 6 20' X Z z L00 cNL Ww� �wz J¢O ry ZZ0 LL i iu -a -� F SITE PLAN SCALE 1" = 20' z a o_ 0 w = "€ C) W S J O 2 W cr W d CL J, Lij J M U W 20 i0 0 20 0 , SCALE: 1" 6 20' EDGES OF ROADWAY EX STREAM BANKS - 2 1 SLOPE (TYP) i CLASS B RIPRAP, V -6" MIN THICKNESS PLACE OVER FILTER FABRIC CARRY RIPRAP TO TOP OF EX STREAM BANK EL 6" OF 2 " -3" COARSE AGGREGATE OVER ROADWAY CLASS B RIPRAP, V -6" MIN THICKNESS FILTER FABRIC BENEATH ALL RIPRAP K � DetallSheet dan 8/19/2013 4 37 26 AS REQD FOR CLASS B RIPRAP OVERLAID WITH STREAM DEPTH N 6" OF 2 " -3" COARSE AGGREGATE C EXTEND COARSE AGGREGATE PLAN h UP EXCAVATED ROADWAY ,x ABOVE STREAM BANKS 1 I - NOTES • I I CREEK BANKS TO A MINIMUM RIPRAP EX STREAM 1 INSTALL TEMPORARY CROSSING PROTECTION BOTTOM , OF 2" TO 10' 3" COARSE AS SHOWN IN "TEMPORARY STREAM CROSSING" AS REQD FOR DETAIL ON EROSION CONTROL DETAIL SHEET STREAM DEPTH ONCE AREA IS STABILIZED, INSTALL STREAM C FORD CROSSING FOR PERMANENT ACCESS PLAN ACROSS STREAM EX STREAM 2 KEEP DISTURBANCE OF TERRAIN WITHIN BANKS CREEK BANKS TO A MINIMUM RIPRAP EX STREAM ALL DISTURBED AREAS WITHIN BANKS BOTTOM , OF 2" TO 10' 3" COARSE _ STREAM BED I AGGREGATE \-61 SLOPE CLASS B RIPRAP — 10' FILTER FABRIC MIN SECTION �t1 V -6" MIN SECTION ji STREAM FORD CROSSING NOT TO SCALE CONSTRUCTION EASEMENT 10' 0" RIPRAP AND SAND MIN BAGS KEYED 1' -6" t MIN INTO STREAM 12" #57 WASHED H BANKS AND BED �'� STONE � o TOP OF_/ FLOW BANKS 8 MIL POLYETHYLENE FABRIC RIPRAP AND SAND BAGS KEYED 1'-6" MIN INTO STREAM BANKS AND BED — 8 MIL POLYETHYLENE I FABRIC TOP OF BANK `1 EX STREAM BED -7 I 10-01, MIN - TEMP 24" T4 42" CMP I PIPELINE CROSSING STREAM PLAN TEMP RIPRAP APRON _ CONSTRUCTION EASEMENT I TEMP STONE DAM 12" #57 WASHED STONE --1 NOTES 1 STONE FOR DAM AND CROSSING TO BE CLASS B RIPRAP UNLESS OTHERWISE NOTED ON PLANS 2 CULVERT SIZE AND NUMBER AS SHOWN ON PLANS 3 WHEN TEMPORARY CROSSING FILTER I FABRIC � � I TEMP 24" RD, Q C STREAM BANKS PS Ww¢ / mw�3 O N 097 ¢Z a0 w 1 ILL DEWATERING BASIN o (STONE FILTER BASIN) - TEMP 24" T4 42" CMP I PIPELINE CROSSING STREAM PLAN TEMP RIPRAP APRON _ CONSTRUCTION EASEMENT I TEMP STONE DAM 12" #57 WASHED STONE --1 NOTES 1 STONE FOR DAM AND CROSSING TO BE CLASS B RIPRAP UNLESS OTHERWISE NOTED ON PLANS 2 CULVERT SIZE AND NUMBER AS SHOWN ON PLANS 3 WHEN TEMPORARY CROSSING FILTER I FABRIC � � I TEMP 24" IS NO LONGER NEEEDED, REMOVE TEMP CMP, DAM, AND SANDBAGS AND RIPRAP ALL SANDBAGS DISTURBED AREAS WITHIN Q TO 42" STREAM BANKS E CD _ DEWATERING BASIN Z W - -! (STONE FILTER BASIN) W/ 2 1 SIDE SLOPES C) m l TEMP STONE w W DAM TEMP RIPRAP W APRON - TEMP 24" T4 42" CMP I PIPELINE CROSSING STREAM PLAN TEMP RIPRAP APRON _ CONSTRUCTION EASEMENT I TEMP STONE DAM 12" #57 WASHED STONE --1 NOTES 1 STONE FOR DAM AND CROSSING TO BE CLASS B RIPRAP UNLESS OTHERWISE NOTED ON PLANS 2 CULVERT SIZE AND NUMBER AS SHOWN ON PLANS 3 WHEN TEMPORARY CROSSING FILTER I FABRIC � � I TEMP 24" IS NO LONGER NEEEDED, REMOVE TEMP CMP, DAM, AND SANDBAGS AND RIPRAP ALL SANDBAGS DISTURBED AREAS WITHIN PIPELINE CROSSING STREAM TO 42" STREAM BANKS SECTION CMP TEMPORARY STREAM CROSSING NTS O 3 = U a 3 > c O o u w cc G W > a o c a oZ o w > J U 0 �- U 3 Y U nFYl+ Ei RSF '.HECK[D fit JC nano NO 91700 N�[ AUGUST201 C4[ AS NOTE 'I(T 2 0r 2 2