Loading...
HomeMy WebLinkAboutNC0086550_Pretreatment Inspection_20091231.4t7A, NCDENR. North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director December 31, 2009 Mr. H. Blake Proctor Town Manager Town of Fairmont PO Box 248 Fairmont, NC 28340 Subject: Pretreatment Compliance Inspection (PCI) Town of Fairmont NPDES Permit # NC0086550 Robeson County Dear Mr. Proctor, Enclosed you will find a copy of the Pretreatment Compliance Inspection Report for the inspection that was conducted at the Fairmont Town Hall on November 5, 2009 with Nadine Blackwell (Pretreatment Coordinator, United Water), Johnny Britt (Fairmont WWTP ORC), and Kevin Taylor (Fairmont WWTP operator) to review the Fairmont Pretreatment Program records. During the PCI, Harger Lightening Protection Grounding Equipment, Inc. (IUP #001) was inspected, and Phil Huffman, Harger Purchasing Manager, provided a tour of Harger's pretreatment facilities and the production plant. The PCI report indicated that, on the day of this inspection, the Fairmont WWTP appeared to meet the pretreatment requirements as outlined in 15 A NCAC 2H..0904 for Pretreatment Programs. The report is self-explanatory and contains observations and recommendations. If you or your staff have any questions or require clarification, please do not hesitate to contact me at (910) 433-3312. [Dale Lopez Environmental Specialist Enclosure: Pretreatment Compliance Inspection (PCI) Report cc: Nadine Blackwell, United Water Dana Folley, PERCS — Pretreatment 225 Green St., Suite 714, Fayetteville, NC 28301-5043 Phone: 910-133-3300 l FAX: 910-486-0707 d Customer Service: 1-877-623-6748 Interne: www.ncwaterquality.org Dee Freeman Secretary NorC]a Caroli..na Naturally An Equal Opportunity 1 Affirmative Action Employer NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION (Complete Prior To PCI; Review Program Info Database Sheet(s)1 1. Control Authority (POTW) Name: _ Town of Fairmont WWTP 2. Control Authority Representative(s): Nadine Blackwell 3. Title(s): PT Coordinator 4. Last Inspection Date: New Program Inspection Type (Check One): ❑ PCI ❑ Audit N/A1 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ei NO N/AI Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO PCS CODING Trans.Code Main Program Permit Number MM/DD/YY N.1 J NJCI0 1018161515 10 1 J 11 1051 091 (DTIA) Inspec.Type J PI (TYPI) Inspector J s (INSP) Fac. Type 1 1 1 (FACC) 7. Current Number Of Significant Industrial Users (SIUs)? 1 SIUS 8. Current Number Of Categorical Industrial Users (CIUs)? 1 CIUS 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? Inspected 09/24/09 0 10. Number of SlUs Not Sampled By POTW in the Last Calendar Year? Not sampled yet; Harger began discharging process on September 14, 2009 11. Enter the Higher Number of 9 or 10 0 NOIN 12. Number of SIUS With No IUP, or With an Expired IUP 0 NOCM 13. Number of SIUs in SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods (Total Number of SIUs in SNC) 0 PSNC 14. Number of SIUS in SNC For Reporting During Either of the Last 2 Semi -Annual Periods 0 MSNC 15. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods 0 SNPS 16. Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2 Semi-annual Periods 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during either of the Last 2 Semi -Annual Periods? Not Been Published for Public Notice?(May refer to PAR if Excessive SIUs in SNC) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? ❑ YES NO ❑ YES I4 NO SNC for Limits: SNC for Reporting: Not Published: 0 0 0 0 ❑ YES NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ❑ YES ®.NO Is Table Adequate? ❑ YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ❑ YES ❑ NO 26. LINO to 23 - 26, list violations 27. Should any Pollutants of Concem be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: N/A, will be in the future Will in the future ❑ NO N/A, will be in the future NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their tiles, complete with supporting documents and copy ofPERCS Approva Letter, and dates consistent with Pro{grati� Info: Program Element Last Submittal Date In tile? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) ❑ Yes ❑ No 10/05/2009 /i4 Yes ❑ No Industrial Waste Survey (IWS) ❑ Yes ❑ No Will be sent by November 30, 2009 ❑ Yes ❑ No Sewer Use Ordinance (SUO) ❑ Yes ❑ No 10/28/09 sent to PERCS ❑ Yes ❑ No Enforcement Response Plan (ERP) ❑ Yes [ No 10/28/09 sent to PERCS ❑ Yes ❑ No Long Term Monitoring Plan (STMP) ❑ Yes ❑ No 08/26/09 f:1 Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name Harger Lightening & Grounding Equipment 30. IUP Number 001 31. Does File Contain Current Permit? /ZI Yes ❑ No 32. Permit Expiration Date 03/01/2014 33. Categorical Standard Applied (LE. 40 CFR, Etc.) Or N/A 40 CFR 468 (h, j, k, m) 34. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? /1 Yes ❑ No 35. Does, File Contain an Inspection Completed Within Last Calendar Year? i1 Yes ❑ No (09/24/2009) 36. a. Does the File Contain a Slug/Spill Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. •Yes @No b. ►SYes ■No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic Organic Management Plan (TOMP)? ❑Yes❑NoION/A 38. a. Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. ►SYes ■No b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP, including flow? ❑ Yes ►1 No 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ❑ Yes ❑ No NE 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required by IUP, including flow? ®Yes❑No❑N/A 4l b. During the Most Recent Semi -Annual Period, Did SIU submit all reports on time? ®Yes❑No❑N/A 42a. For categorical lUs with Combined Wastestream Formula (CWF), does file include process/dilution flows as Required by .IUP? ❑Yes❑No®N/A 42b. For categorical lUs with Production based limits, does file include production rates and/or flows as Required by IU.P? ®Yes❑No❑N/A 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? I1 Yes ❑ No 43b. During the Most Recent Semi -Annual Period, Did the POTW W :Identify All Reporting Non -Compliance from SIU Sampling? ®Yes❑No❑N/A 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? c. If applicable, Did POTW resample within 30 days of becoming aware of SIU limit violations in the POTW's sampling of the SIU? a.❑Yes❑No®N/A The CIU was aware of reporting req. b.❑Yes❑No®N/A c.❑Yes❑No®N/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes I1 No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? ❑Yes❑No®N/A NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑NoON/A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑No®N/A 50. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? a.❑Yes❑No®N/A b.❑Yes❑No®N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? ❑ Yes No FILE REVIEW COMMENTS: 1. The IWS was not completed, but will be completed by the end of November 2009. 2. STMP: The POTW aeration basin was sampled during the week of this PCI; the POTW Influent and the Effluent were planned to be sampled on a quarterly basis. The sludge to disposal sampling and analyses will be performed next year. 3. Harger's Slug Control Plan was in the process. 4. The Town of Fairmont's WWTP routinely received wastewater from the following locations: • Town of Fairmont, • Fair Bluff, • Boardman, Poctorville, • Orrum Middle School • (maybe by the end of November 2009) Cerro Gordo. NC DWQ Pretreatment;Compliance Inspection (PCI) Form Updated 7/25/07 Page 3 4 INDUSTRY INSPECTION PCS CODING: Trans.Code L NJ Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac. Type JNIC101018J615►5101 1111051091 J I 1 J S [ J 2 1 (DTIA) (TYPI) (INSP) (FACC) 1. Industry Inspected: 2. Industry Address: Harger Lightening & Grounding 12779 Highway 130 East Fairmont, NC 28340 3. Type of Industry/Product: Manufacturing of lightningprotection and grounding equipment 4. Industry Contact: Rich Macary/Phil Huffman Title Operations Manager/Purchasing Manager Phone: (910) 628-9400 and (910) 628- 5284 Fax: (910) 628-8888 5. Does the POTW Use the Division Model Inspection Form or Equivalent? `1 YES ❑ NO On the day of this PCI visit to Harger, the PT, Coordinator did not perform an inspection, the reason being that one was performed on 09/24/2009. 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES .❑ NO B. Plant Tour ❑ YES ❑ NO - C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: There was 1 to 2 micrometers of tin coated onto the copper wire. 2 gauge copper wire was annealed and drawn down to 16 gauge wire. Reagents: 93% sulfuric acid, Liquichlor 12.5% (bleach), 50% NaOH (caustic). 10 employees at the CIU, for lightening protection & grounding: residential and commercial interwoven into the building. Copper, tin, and aluminum were the main metals that were used at the CIU. 40 CFR 468: a copper forming operation only. Aluminum/copper alloy processed were heated, stretched, anneal, spooling, and electroplated. The water rinse was in the electroplating process only. Harger's daily flow limit = 5,000 GPD. The wastewater flow was measured by a propeller type flow meter. The flow meter was calibrated by LT Technologies (508) 588-9972. Thy oor tna i;apl = E eclitoite it ghat t} .CiLlir l7h aflofi- 'iTrtettr-because it was not originally installed correctly; and, during the week efore t sPCC the error ifillation was corrected. The bath flowed to pH adjustment for the precipitation of metals, then to filtration (copper and tin), then backwash into the effluent discharge tank (in which a grab .sample was taken for the effluent 001 discharge) NC DWQ Pretreatment C mplirnce Inspection (PCI) Form Upilatcd 7.'25107 Page 4 ti PCI COMPLETED BY: 4-4 OVERALL SUMMARY AND COMMENTS: Comments: The SUO and the ERP were submitted to PERCS and were being processed for approval. Requirements: Recommendations: As according to the proposed time table that the Town submitted to the PERCS unit: Please submit 1) the Industrial Waste Survey (IWS) by November 30, 2009, 2) the Headworks Analysis by August 31, 2010. NOD: ❑ YES ® NO NOV: ❑ YES ® NO QNCR: ❑ YES I NO POTW Rating: Satisfactory V 1V�arginal Unsatisfactory ATE: 12/31/2009 Reviewed by : �cile/nhat. " Date: 1/ `4 // D NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 5 United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 • Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES ' yr/mo/day Inspection 1 I NI 2 15I. 3.1 N00086550 111 .121 09/11/05 117 Type Inspector Fac Type 1810 191 SI 201 I • • IIII IIII III66 Remarks 21IIII I11111111111111111111.III IIIIIIII Inspection Work Days Facility Self -Monitoring Evaluation Rating • B1 QA - - -- Reserved---------- 67I 2.0 169 701 31 •711 I 721 N I 731 1174 751 1 I 1 1 1 1 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Fairmont Regional WWTP , Off' US Hwy 74 Fairmont NC 28340 Entry Time/Date 10:30 AM 09/11/05 Permit Effective Date 09/11/01 Exit Time/Date 03:00 PM' 09/11/05 Permit Expiration Date 14/07/31 Name(s) of Onsite Representative(s)fTitles(s)/Phone and Fax Number(s) /// Johnny J Britt/ORC/910-628-0064/ . Other Facility Data Name, Address of Responsible OfficialfTitle/Phone and Fax Number Johnny J Britt,PO Box 248 Fairmont NC Contacted 283400248/Superintendent/910-628-0064/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Pretreatment . Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) • • Name(s) and Sigikture(s) of Inspector(s) ( Agency/Office/Phone and Fax Numbers Date Dale Lopez �! (` FRO WQ//910-433-3300 Ext.712/ / d� i0 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page # 1 31 NPDES NC0086550 111 121 yr/mo/day 09/11/05 Inspection Type 17. 18I PI (cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Enclosed you will find a copy of the Pretreatment Compliance Inspection Report for the inspection that was conducted at the Fairmont Town Hall on November 5, 2009 with Nadine Blackwell (Pretreatment Coordinator, United Water), Johnny Britt (Fairmont_WWTP ORC), and Kevin Taylor (Fairmont WIMP operator) to review the Fairmont Pretreatment Program records. During the PCI, Harger Lightening Protection Grounding Equipment, Inc. (IUP #001) was inspected, and Phil Huffman, Harger Purchasing Manager, provided a tour of Harger's pretreatment facilities and the production plant. The PCI report indicated that, on the day of this inspection, the Fairmont WWTP appeared to meet the pretreatment requirements as outlined in 15 A NCAC 2H..0904 for Pretreatment Programs. The SUO and the ERP were submitted to PERCS and were being processed for approval. Recommendations: As according to the proposed time table that the Town submitted to the PERCS unit, please submit: 1) the Industrial Waste Survey (IWS) by November 30, 2009, 2) the Headworks Analysis by August 31, 2010. The report is self-explanatory and contains observations and recommendations. If you or your staff have any questions or require clarification, please do not hesitate to contact me at (910) 433-3312. Page # 2