Loading...
HomeMy WebLinkAbout20131098 Ver 2_Riparian Buffer Authorization_201310101 ® State of North Carolina 2013 Department of Environment and Natural Resources WfT OFNR dt� Division of Water Resources Division of Water Resources �ANpSANO OR OuAt,rr S, Ug'ATERR 15A NCAC 02B.0233 (8)(b),.0243 (8)(b),.0250 (l 259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10 -2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1a. Name of project: Stewart Parkway Swing Project 1 b. County: Beaufort 1c. Nearest municipality: City of Washington 1d. Subdivision name: 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. X Yes ❑ No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ❑ No 2. Owner Information 2a. Name on Recorded Deed: City of Washington 2b. Deed Book and Page No. 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 2d. Responsible Party (for Corporations): 2e. Street address: 310 West Main Street 2f. City, state, zip: Washington, NC 27889 2g. Telephone no.: 252- 975 -9367 x 224 2h. Fax no.: 252 - 946 -8433 2i. Email address: gqv 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name (if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 10 -2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 105010372 1 b. Site coordinates (in decimal degrees): Latitude: 35.54251 Longitude: 77.05891 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Pamlico River 2b. Water Quality Classification of nearest receiving water: SC; NSW 2c. River basin: Tar - Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is a grassy area. It is used as a small open space along the waterfront. 3b. Attach an 8'/ x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/ x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet-of all existing streams (intermittent and perennial) on the property: —1,925 Linear of perennial water frontage on Pamlico River 3e. Explain the purpose of the proposed project: Additional swings on the waterfront. 3f. Describe the overall project in detail, including the type of equipment to be used: Install matching swings on the waterfront along Stewart Parkway. We will not exceed 6 swings over the next 6 years. The swings will be located parallel to the Pamlico River and placed along the grass on Stewart Parkway. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? X Yes ❑ No ❑ Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Roberto Scheller Agency/ Consultant Company: Other: DWQ 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 2011 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? X Yes ❑ No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. Phase 2 of Festival Park required encroachment into Tar - Pamlico Riparian Buffer for playground. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes X No 6b. If yes, explain. FORM: BA 10 -2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The footprint of the swing is the minimal region needed to safely support the swing structure. 1. Buffer Impacts 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? 1 a. Project is in which protected basin? ❑ Neuse X Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MIUST fill out Section D of this form. Buffer impact number — Permanent (P) or Temporary T Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) 131 ❑ P ❑ T Playground Allowable Pamlico River ❑ Yes X No 48 sq ft B2 ❑ P ❑ T Total buffer mitigation required: ❑ Yes ❑ No ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 63 ❑ P ❑ T 2f. Comments: ❑ Yes ❑ No 134 ❑ P ❑ T ❑ Yes __❑ No 135 ❑ P ❑ T ❑ Yes [:]No 66 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The footprint of the swing is the minimal region needed to safely support the swing structure. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The swing will be constructed in a manner that will have the minimal footprint needed to safely support the swing structure. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes X No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer-that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 swing 48 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10 -2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of X Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1 a. If due to site constraints, a BMP other than a level spreader is proposed, please provide a X Yes ❑ No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP public (federal /state) land? Manual and attach a BMP Supplement Form. 1 b. F. Supplementary Information by First Class Mail via the US Postal Service: 1. Environmental Documentation OR NC DWR, Transportation Permitting Unit 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the use of X Yes ❑ No Raleigh, NC 27604 public (federal /state) land? For all other projects sent by delivery service 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes X No OR Karen Higgins environmental document pursuant to the requirements of the National or State (North NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center Carolina) Environmental Policy Act (NEPA/SEPA)? Raleigh, NC 27699 - 1650 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA'final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes X No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Ian I � 1n Applicant/Agent's Printed Name A plicant/Agent's Signature D (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send this completed form and accompanying documents to the following: For government transportation projects sent For government transportation projects sent by First Class Mail via the US Postal Service: by delivery service (UPS, FedEx, etc.): NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1650 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604 For all other projects sent by First Class Mail For all other projects sent by delivery service via the US Postal Service (UPS, FedEx, etc.): Karen Higgins OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604 FORM: BA 10 -2013 Page 4 of 4 , 4 7 gmt.- 7 Y, MS, Proposed Project Location 6 N 0 ob; ' klll'�L z p'? 1 0':' 9' z e T" '..P r•�° "!•1:1�'." _ ^,,.a' v� .L •rt �n yew -,3: �.,. }' m Tom' W:? '&W Lev Z' I. -7— V t-" An n tr mag etic Dec at n b4'� vi$L'l fZr 4 -k L "�: : 4 $1 NFI%' SCALE 1:8000 0 100 200 300 400 500 600 YARDS N 0 1000 FEET 0 100 200 300 400 500 METERS 10* Copynght (C) 1998, Maptech, Inc