HomeMy WebLinkAbout20210046 Ver 1_Site inspection Follow-up_20211026 Wetland Inspection Report
Project Num: 20210046 Version: 1 Status: Issued
Project Name: NCDOT-Replace Bridge 355 on Hartzog Ford Road Project Type: Replace bridge with bridge
County: Ashe (B-5825)
Region: Winston-Salem
Location: NCDOT-Replace Bridize 355 on Hartzog Ford Road(B-5825)
Latitude: +360 19' 01" Longitude: -81'25'23"
SW Plan Location:
Site Owner Name: NC DOT Division 11
Inspection Date: 10/25/2021
Reason for Inspection: Follow-up
Inspection Type: Site Inspection(DOT)
Inspection Contact Person: Title: Phone:
On-Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit(401 WQC)
Inspection Summary:
page 1
Site Number: 20210046 Owner: Pettviohn,Michael A.
Inspection Date: 10/25/2021 Inspection Type: Site Inspection(DOT) Reason for Visit: Follow-up
Permit(401 WOO Yes No NA NE
Does the impact(s)match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: This was a follow-up inspection to observe in-stream work related to old bridge bent removal. We allow
the excavator to enter the stream and pluck the bents out instead of building causeways for the
equipment to sit on. Causeway construction creates turbidity and has the potential to damage sensitive
aquatics. In this case, due to solid bedrock channel and shallow water, equipment was allowed to enter
and conduct the operation. The whole affair took less than three hours. A turbidity curtain was
deployed but due to a lack of stream depth, it did not perform well. There was only minor turbidness an
it was related to instream sediments.