Loading...
HomeMy WebLinkAboutNCS000408_02_Graham-CSWMP-Report 2017rev. August 2021_20210917COMPREHENSIVE STORMWATER MANAGEMENT PLAN FOR THE CITY OF GRAHAM JUNE 2017 CONTACT INFORMATION UPDATED AUGUST 2021 TABLE OF CONTENTS Tableof Contents.............................................................................................................ii Definitions....................................................................................................................... v 1 Storm Sewer System Information............................................................................. 6 1.1 MS4 Conveyance System.................................................................................... 6 1.2 Land Use Composition Estimates: ........................................................................ 6 1.3 Estimate Methodology: ......................................................................................... 6 1.4 TMDL Identification............................................................................................... 6 2 Receiving Streams.................................................................................................... 8 3 Existing Water Quality Programs.............................................................................. 9 3.1 Local Programs: ................................................................................................... 9 3.2 State Programs: .................................................................................................... 9 4 Permitting Information............................................................................................. 10 5 Co -Permitting Information....................................................................................... 12 6 Reliance on other government entity to satisfy one or more permit obligations...... 13 7 Stormwater Management Program......................................................................... 14 7.1 Public Education and Outreach on Storm Water Impacts ................................... 14 7.1.1 BMP Summary Table....................................................................................... 14 7.1.2 Target Audience.............................................................................................. 15 7.1.3 Target Pollutant Sources................................................................................. 15 7.1.4 Outreach Program........................................................................................... 15 7.1.5 Decision Process............................................................................................. 15 7.1.6 Evaluation........................................................................................................ 15 7.2 Public Involvement and Participation.................................................................. 16 7.2.1 BMP Summary Table....................................................................................... 16 7.2.2 Target Audience.............................................................................................. 17 7.2.3 Participation Program...................................................................................... 17 7.2.4 Decision Process............................................................................................. 17 7.2.5 Evaluation........................................................................................................ 17 7.3 Illicit Discharge Detection and Elimination.......................................................... 18 7.3.1 BMP Summary Table....................................................................................... 18 7.3.2 Storm Sewer System Map............................................................................... 19 7.3.3 Regulatory Mechanism.................................................................................... 19 7.3.4 Enforcement: ................................................................................................... 19 7.3.5 Detection and Elimination................................................................................ 19 7.3.6 Non Stormwater Discharges............................................................................ 20 7.3.7 Outreach.......................................................................................................... 20 7.3.8 Decision Process............................................................................................. 20 7.3.9 Evaluation........................................................................................................ 20 7.4 Construction Site Stormwater Runoff Control ..................................................... 20 7.5 Post -Construction Storm Water Management in New Development and Redevelopment.................................................................................................. 21 7.5.1 BMP Summary Table....................................................................................... 21 7.5.2 Stormwater Management Options................................................................... 22 7.5.3 Non -Structural BMP's...................................................................................... 22 7.5.4 Structural BMPs............................................................................................... 22 7.5.5 Regulatory Mechanism.................................................................................... 22 7.5.6 Operation and Maintenance............................................................................. 22 7.5.7 Education.........................................................................................................22 7.5.8 Decision Process............................................................................................. 23 7.5.9 Evaluation........................................................................................................ 23 7.6 Pollution Prevention/Good Housekeeping for Municipal Operations .................. 24 7.6.1 BMP Summary Table....................................................................................... 24 7.6.2 Affected Operations......................................................................................... 25 7.6.3 Training............................................................................................................25 7.6.4 Maintenance and Inspections.......................................................................... 25 7.6.5 Vehicular Operations....................................................................................... 26 7.6.6 Waste Disposal................................................................................................ 26 7.6.7 Flood Management Projects............................................................................ 26 7.6.8 Decision Process............................................................................................. 26 7.6.9 Evaluation........................................................................................................ 26 7.7 Total Maximum Daily Loads (TMDL).................................................................. 27 7.7.1 BMP Summary Table....................................................................................... 27 7.7.2 Determination of TMDL's................................................................................. 28 7.7.3 Establishing a Water Quality Recovery Plan .................................................... 28 7.7.4 Decision Process............................................................................................. 28 7.7.5 Evaluation........................................................................................................ 28 IV DEFINITIONS BMP — Best Management Practice also known as a Stormwater Control Measure Category 4b Plan — An EPA approved plan that is an alternative to a TMDL DEMLR — Division of Energy, Mining, and Land Resources DEQ — Department of Environmental Quality (formerly DENR) EPA — Environmental Protection Agency Illicit Discharge — Any discharge to an MS4 that is not entirely composed of stormwater. Exceptions include discharges from NPDES-Permitted industrial sources and discharges from fire -fighting activities MS4 — Municipal Separate Storm Sewer System. A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins curbs, gutters, ditches, manmade channels, or storm drains) NPDES — National Pollutant Discharge Elimination System SCM — Stormwater Control Measure TMDL — Total Maximum Daily Load v COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 1 STORM SEWER SYSTEM INFORMATION Population Served: 14,812 (2016 Estimate from the NC Office of Budget & Management) Annual Growth Rate: 4.7% Jurisdictional and MS4 Service Areas: Jurisdictional area: 9.39 square miles, MS4: 9.39 square miles 1.1 MS4 CONVEYANCE SYSTEM The City of Graham MS4 consists of a combination of storm drain piping, roadside ditches, and sheet flow. New developments are required by City ordinance to have curb and gutter drainage systems and high density developments are required to treat the first 1" of runoff from the developed property. City streets are maintained by the City's Street Department, which is housed in the Public Works Department. State roads are maintained and managed by NCDOT. 1.2 LAND USE COMPOSITION ESTIMATES; Residential: 50.04% Commercial: 23.20% Industrial: 6.52% Open Space: 20.24% 1.3 ESTIMATE METHODOLOGY. The land use estimate was based on the zoning within the jurisdictional area as of June 2009. The Piedmont Triad Council of Government's GIS system provided the zoning data, and includes the right-of-way areas. 1.4 TMDL IDENTIFICATION Town Branch has a TMDL for fecal coli form. The TMDL lists the following non -point sources in the watershed: urban runoff (stormwater), sewer line systems (leaky sewer lines and sewer system overflows), wildlife, failing septic systems, and probably illicit Page 6 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM connections in unknown locations. The TMDL does not include an implementation plan. The City of Graham has begun addressing sanitary sewer overflows through sewer system infrastructure upgrading. Page 7 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 2 RECEIVING STREAMS Table 1. Cape Fear River Basin Receiving Stream Name Stream Segment Water Quality Classification Use Support Rating Water Quality Issues Haw River 16-(10.5) WS-V; NSW 1, 2, 3 Benthos Town Branch 16-17 WS-V; NSW Fecal Coliform County Home Branch (Still House Branch) 16-17-1 WS-V; NSW NR N/A Big Alamance Creek 16-19-(4.5) WS-V; NSW NR N/A Back Creek (Little Creek) 16-19-5 WS-V; NSW NR N/A Little Alamance Creek 16-19-11 WS-V; NSW 1,2 Urban Stormwater Bowden Branch (Boyd Creek) 16-19-11-2 WS-V; NSW NR N/A Aquatic life and secondary recreation 2 Fish consumption 3 On 303(d) list Page 8 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 3 EXISTING WATER QUALITY PROGRAMS 3.1 LOCAL PROGRAMS: Additionally the City operates a Stage 1 Adaptive Management Program for Existing Development in the Jordan Lake Basin. The Stage 1 Adaptive Management Program is very similar to the NPDES Phase II Program and is part of a Jordan Lake Watershed Nutrient Sensitive Waters Strategy. 3.2 STATE PROGRAMS: NCDEQ implements the NC Erosion and Sediment Control Program within the City of Graham. Page 9 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT 4 PERMITTING INFORMATION. Table 2. Responsible Contacts CITY OF GRAHAM Position Name Phone No. Fax No. Email City Manager / Vacant Fran Lie n4a., e s s 2 70-6799 f.. aR GSS@G'tyefg ra ha Interim / Asst. City Manager Aaron Holland 336/570/6700 336/570-6703 aholland@cityofgraham.com City Clerk Darcy Sperry 336/570-6500 336/570-6703 dsperry@cityofgraham.com Stormwater Engineer Alley, Williams, Carmen, & King, Inc. Josh Johnson 336/226-5534 336/226-3034 josh@awck.com City Public Works Director Burke Robertson 336/570-6709 336/570-6703 brobertson@cityofgraham.com City Attorneys Robert (Bob) Ward J. Bryan Coleman 336/228-1433 336/570-6703 City Planning Director Justin Snyder 336/570-6700 336/570-6703 jsnyder@cityofgraham.com Utilities Director Tonya Mann 336/578-3264 336/570-6703 tmann@cityofgraham.com Page 10 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM City Of Graham Organizational Chart City Council City Attorney City Manager Fire Chief Public Works Director Police Chief City Clerk Signing Official: City Manager — Frankie Maness - Duly Authorized Representative: NA City Engineer Tax Collector Finance Director Water Billing & Collection Administrator Planning Director Interim City Manager - Aaron Holland Page 11 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT 5 CO -PERMITTING INFORMATION Not applicable Page 12 CITY OF GRAHAM COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 6 RELIANCE ON OTHER GOVERNMENT ENTITY TO SATISFY ONE OR MORE PERMIT OBLIGATIONS The City of Graham will rely on the State Erosion and Sediment Control Program and the Department of Water Quality's general stormwater permit program for construction activities to meet the construction site stormwater runoff control requirement. There are no legal agreements in place to establish responsibilities. The City also contracts with the Piedmont Triad Regional Council's Stormwater Smart program. The program handles most of the City's educational responsibilities. Contact Information: NC Sedimentation and Erosion Control Program Winston-Salem Regional Office Tamera Eplin, P.E. 450 West Hanes Mill Road, Suite 300, Winston Salem, NC 27105-7407 336/776-9800 Piedmont Triad Regional Council Stormwater Smart Dancia Heflin 1398 Carrollton Crossing Drive, Kernersville, NC 27284 (336) 904-0300 ext. 3008 Page 13 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7 STORMWATER MANAGEMENT PROGRAM 7.1 PUBLIC EDUCATION AND OUTREACH ON STORM WATER IMPACTS 7.1.1 BMP Summary Table BMP Measurable Goals YIR Y2R Y3R Y4R Y5R Responsible Position/Party Maintain an education plan Maintain education plan. Include in Plan the BMPs, schedule, X X X X X City Planner targeted audiences, and measurable goals. Summarize plan Stormwater Engineer and implementation progress in each annual report. School Programs Maintain school children education program. Focus on basic X X X X X City Planner messages regarding clean water and the things they can do at Stormwater Engineer home to help. Track the number of children reached and the subject covered and report annually. Mailers, brochures, posters Distribute bilingual mailer for insert in utility bills. Distribute X X X X City Planner bilingual brochures and posters for distribution at City Hall. Stormwater Engineer Target homeowners and businesses with messages about how they can reduce pollution picked up by stormwater. Track number of homes and businesses reached by mailer and report annually. City's web page Link to other stormwater websites. Give tips on reducing X X X X X City Planner pollution. Report annually. Stormwater Engineer Festivals, parades, local Participate in local festivals annually by providing a stormwater X X X X X City Planner fairs information booth starting. Provide bilingual messages on the Stormwater Engineer importance of clean water and on specific activities that can be carried out to help keep stormwater clean. Business and Industry Maintain program for educating business and industry using X X City Planner education and outreach brochures or pamphlets and report annually on number of Stormwater Engineer businesses reached and number of employees educated. Focus on workplace issues to reduce pollutant loading. Target hot spot businesses. Helpline / Hotline All stormwater related calls will be forwarded to the Public Works X X X X X Public Works Director Dir. who will then distribute the information to other employees. Page 14 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.1.2 Target Audience Graham residents, school children, local businesses (including gas station owners and landscaping companies) and industry, will be targeted because these groups have the most impact on stormwater pollution prevention. 7.1.3 Target Pollutant Sources The education program will target total suspended solids and nutrient loading because turbidity, sedimentation, and nutrients are the pollutants of concern in downstream waters. In addition, floatables, trash, and debris will also be targeted. The education program will also address the proper use and disposal of typical household chemicals, garden chemicals, and used motor oil. 7.1.4 Outreach Program School programs, printed materials to be distributed via mail and public events, and participation in state cleanup programs will be used to reach the target audience. By using these methods, the education program will be expected to reach all residents of Graham, as well as those that do business here, over the course of the five year permit period. As a result of this outreach program, the target audience will be informed of the importance of reducing storm water pollution and ways they can incorporate pollution reduction in their daily lives. Direct Education was chosen over mass media due to availability of the cooperative stormwater education program, Stormwater SMART, and due to studies showing the effectiveness of direct education over mass media. 7.1.5 Decision Process The formation of the storm water public education and outreach program was based on the mechanisms currently in place, and their means and effectiveness of communicating and educating the public about the issues of stormwater pollution prevention. Each of the BMP's selected was judged to be an effective and economical tool for educating the general public and/or specific groups within the community, with a specific measurable goal with which to gauge its effectiveness. 7.1.6 Evaluation The education and outreach program will be evaluated based on how each individual BMP is meeting its measurable goal at the end of each reporting period. Changes will be considered for any BMPs that are not meeting the measurable goals. Page 15 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.2 PUBLIC INVOLVEMENT AND PARTICIPATION 7.2.1 BMP Summary Table BMP Measurable Goals YIR Y2R Y3R Y4R Y5R Responsible Position/Panty Public Meeting A public meeting will be held annually to discuss the X X X X X City Planner implementation of the permit. This meeting will provide City Clerk the public with the opportunity to be involved with the stormwater program and will serve as a better conduit Stormwater Engineer for public input than the stormwater committee used previously. More meetings may be held if public Asst City Manager involvement is substantial. Volunteer Stormwater Program The City will promote various volunteer stormwater X X X X X City Planner programs annually. These will include Big Sweep, Stormwater Engineer Adopt -A -Stream programs, and Storm Drain Stenciling. The number of participants will be reported annually. Helpline / Hotline All stormwater related calls will be forwarded to the X X X X X Public Works Director Public Works Director who will then distribute the information to other employees. Page 16 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.2.2 Target Audience The City's stormwater committee will be discarded in favor of an annual public meeting. The public meetings will allow the public an opportunity to review the stormwater management program and will target all interested and affected members of the Graham community. Additional meetings may be held if public involvement is substantial. The City's committee was ineffective in soliciting widespread public input. 7.2.3 Participation Program The public was originally involved in the development of the stormwater permit and management program through a public hearing in 2005. Public participation opportunities will be implemented throughout the life of the permit through the Volunteer Stormwater Programs and the Annual Public Meeting. 7.2.4 Decision Process A public meeting is necessary for public participation and input. The other BMPs were selected to give the public a choice of both active and passive participation roles. 7.2.5 Evaluation The Public Involvement and Participation program will be evaluated based on how each individual BMP is meeting its measurable goal at the end of each reporting period. Changes will be considered for any BMPs that are not meeting the measurable goals. Page 17 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.3 ILLICIT DISCHARGE DETECTION AND ELIMINATION 7.3.1 BMP Summary Table BMP Measurable Goals YIR Y2R Y3R Y4R Y5R Responsible Position/Party Review Illicit Discharge Ordinance Review Illicit Discharge Ordinance and make any X X X X X City Attorney necessary revisions. Stormwater Engineer City Planner Review Illicit Discharge Program Review Illicit Discharge Program and make any X X X X X Public Works Director necessary revisions. Stormwater Engineer City Planner Maintain storm sewer system map Maintain system map in support of inspection program. X X X X X Stormwater Engineer showing outfalls and the receiving The map will note outfalls and receiving body of water City Planner body of water. for each outfall. Report annually on progress. Public Works Director Maintain an inspection and Investigate and track any sources of Illicit discharges. X X X X X Public Works Director elimination program within the document date, discharge observed, results and the Stormwater Engineer community. date problem was corrected. Coordinate with local health Provide a fact sheet on septic system management, X X Public Works Director department on failing septic systems, Record date of distribution and number of copies Stormwater Engineer locating problem areas in the system placed. map. Provide public information on City Planner septic system management. Train employees on how to inspect Provide materials through HR to all public employees X X X X X Public Works Director for illicit connections and establish a in illicit connections and how to recognize one. Stormwater Engineer tracking system for managing Summarize in annual report. reported problem areas. City Planner Dry Weather Flow Detection Dry Weather testing will be done at least bi-annually in X X X X X Stormwater Engineer accordance with the IDDE program, dependent upon Public Works Director other IDDE investigations. Page 18 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.3.2 Storm Sewer System Map Storm sewer system has been mapped and will be inspected during the course of normal maintenance operations by the public service department. The route of the system, locations of pipes, drainage ditches, and outfalls will be maintained on a paper map and/or electronic map. The map will be updated as needed during subsequent maintenance operations. 7.3.3 Regulatory Mechanism The City has an Illicit Discharge Ordinance which allows for inspection, maintenance, and prohibits illicit discharges. 7.3.4 Enforcement: There are provisions in the amended ordinance for enforcement actions and penalties for dumping, spills, and willful illicit connection. 7.3.5 Detection and Elimination After the field screening is complete, the City will take measures to identify and remove illegal discharges. Identifying illegal discharges may require a combination of office and field work. After the field screening, staff will consult the jurisdiction - wide information they have compiled to obtain information about the land uses, infrastructure, industries, potential sources and types of pollution that may exist in the drainage area of the outfall. After priority areas have been identified in the office, a systematic field investigation will be planned that minimizes the amount of resources required to identify the source. The following field methods may be used to identify and trace the source of illegal discharges: • Site Investigation • Dry weather flow observations • Smoke Testing/Dye Testing • Television Inspection The right of entry established in the ordinance will provide access for inspection if the origin of the discharge is in doubt. Once an illegal discharge is located and confirmed through field screening, staff will notify the responsible party verbally if possible and follow-up with written notification. If the responsible party does not comply with the removal schedule provided by the City, or receive approval for a revised schedule, the City will take enforcement action and the connection will be removed at the responsible party's expense. Page 19 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.3.6 Non Stormwater Discharges Currently there are no known non-stormwater discharges that are a significant contributor to the MS4. If any are identified in the future, they will be addressed at that time. 7.3.7 Outreach City employees will be informed of the hazards associated with illegal discharges and improper disposal of waste as part of their general training requirements. These will be addressed in the Pollution Prevention/Good Housekeeping section of this plan, and will include training in hazardous material handling and disposal, as well as notices and signs posted in the appropriate areas. The general public will be educated through the BMP's listed in the Public Education section of this plan. These educational BMP's will include brochures, public service announcements, and business education and outreach programs. 7.3.8 Decision Process The formation of the storm water Illicit Discharge Detection and Elimination program was based primarily on regulatory mechanisms. The regulatory, educational, procedural BMP's selected were judged to be an effective means of detecting and eliminating illicit discharges. 7.3.9 Evaluation The effectiveness of the program will be gauged by the total number of illicit connections detected and removed each year and with public complaints. If the total number remains constant, or increases, changes will be made to the public education program and/or the City ordinance to allow for greater enforcement and penalties. 7.4 CONSTRUCTION SITE STORMWATER RUNOFF CONTROL The City of Graham will rely on the North Carolina State Erosion and Sediment Control Program and the Department of Water Quality's general stormwater permit program for construction activities to meet the construction site stormwater runoff control requirement. Page 20 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.5 POST -CONSTRUCTION STORM WATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT 7.5.1 BMP Summary Table BMP Measurable Goals YIR Y2R Y3R Y4R Y5R Responsible Position/Party Review the Post Construction Ordinance Review the Post Construction Ordinance for X City Planner compliance with NC DWQ guidance and local City Attorney effectiveness. Phase II Post -Construction Ordinance will incorporate Jordan Lake Nutrient Stormwater Engineer Strategy Regulations in conjunction with NC Session Law and DWQ regulations. Review standards and policies that ensure Review local standards to remain in compliance X X X X X Stormwater Engineer structural BMPs will be in conformance with with the NC DEQ BMP Manual. Additional City Planner the state's Stormwater Management measures and techniques may be added to the Design Manual local ordinance as they are investigated. Review maintenance standards and Review the maintenance standards and X X Stormwater Engineer inspection program to ensure that on -site inspection program for local on -site controls. City Planner controls continue to function as designed. Maintain the education program created for Maintain the education program created for land X X Stormwater Engineer land developers and the public. developers and the public detailed in other City Public Works Director BMP's. Report annually on progress made. City Planner Coordinate with the county health Coordinate with county health department. Report X X X X Stormwater Engineer department on developing and Annually on progress made. City Planner implementing an oversight program to minimize the potential for fecal coliform City Public Works Director contamination by ensuring proper operation and maintenance of on -site wastewater treatment systems. Green Infrastructure Practices and Green Infrastructure Practices and Strategies will X Stormwater Engineer Strategies will be encouraged. be encouraged and existing standards may be City Planner eased to encourage green projects. Inspections and long-term maintenance of Maintain an inspection and maintenance plan for X X X X X City Engineer Stormwater Control Measures (SCMs) SCM's. Annual SCM Inspections performed by a City Planner qualified professional. SCM maintenance and inspections will be reviewed by the town during the permit cycle. Page 21 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.5.2 Stormwater Management Options The existing land usage ordinance has a post -construction stormwater runoff management program for new development and redevelopment projects that disturb greater than, or equal to, one acre. This ordinance may be revised prior to the end of year 3 of the permit to incorporate Low Impact Development (LID) provisions and Nutrient Reduction limits as defined in the Jordan Lake Nutrient Reduction Strategy will be adopted within the timeline established by NC Session Laws and NC DWQ Regulations. 7.5.3 Non -Structural BMP's The receiving streams in the City's watershed are classified as Nutrient Sensitive Waters; therefore the post construction ordinance ensures that best management practices for reducing nutrient loading are implemented. In addition, a nutrient application (both inorganic fertilizer and organic nutrients) management program has been developed and is included in the stormwater management program. 7.5.4 Structural BMPs The City has certified its BMP manual as equal to the NC DWQ BMP Manual. The City reviews structural BMP's based on the NC DWQ BMP Manual and will continue to do so in the future. The City may investigate additional qualified BMP's in the future. These additional techniques are to be evaluated based upon field testing and evaluation by the City's Engineer. 7.5.5 Regulatory Mechanism The City's Post -Construction Ordinance establishes the City's ability to regulate new development for water quality compliance. 7.5.6 Operation and Maintenance The City's Post -Construction Ordinance establishes the City's ability to regulate new development for water quality compliance. The ordinance includes guidelines for delegating routine and non -routine maintenance responsibilities to ensure access for inspections, and providing a mechanism for enforcement. The City will require annual submissions of BMP inspection reports and the City will inspect each BMP during each permit cycle. 7.5.7 Education An education process for developers and citizens about new development with respect to stormwater and water quality has been established and is ongoing. Page 22 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.5.8 Decision Process The post -construction stormwater management program ensures that controls are in place that will prevent or minimize water quality impacts from new development and redevelopment projects. These controls include post -construction ordinance to address post -construction runoff control from new development and redevelopment projects and ensure adequate long-term operation and maintenance of BMPs. Future revisions to this ordinance will be intended to enhance water quality. 7.5.9 Evaluation The post -construction site management for new and re -development activities program will be evaluated based on how each individual BMP is meeting its measurable goal at the end of each reporting period. Changes will be considered for any BMPs that are not meeting the measurable goals. Page 23 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.6 POLLUTION PREVENTION/GOOD HOUSEKEEPING FOR MUNICIPAL OPERATIONS 7.6.1 BMP Summary Table BMP Measurable Goals YIR Y2R Y3R Y4R Y5R Responsible Position/Party Maintain Inventory and O&M Manual Maintain, update, inspect annually all Municipal X X X X X Public Works Director of Municipal Facilities and Operations Facilities and update as needed Operation and Stormwater Engineer Maintenance Manual for every facility and operation. Spill Response Procedures Maintain or create Spill Response Procedures X X X X X Public Works Director Streets, Roads, and Public Parking Maintain Implementation of BMP's. Evaluate Annually X X X X X Stormwater Engineer Lots Maintenance Program for cost and effectiveness. Public Works Director O&M for municipally owned or Continue implementation of O&M Program for the X X X X X Stormwater Engineer maintained catch basins and MS4, including catch basins and conveyance systems. Public Works Director conveyance systems Reassess program annually. O&M for municipally -owned or Continue to implement/and maintain the O&M Program X X X X X Stormwater Engineer maintained structural stormwater for municipally -owned or maintained structural Public Works Director controls stormwater controls. Document inspections and maintenance Pesticide, Herbicide and Fertilizer Ensure municipal employees and contractors are X X X X X Public Works Director Application Management properly trained and all permits, certifications, and other measures for applicators are followed. Staff Training Maintain an employee training program for employees X X X X X Stormwater Engineer involved in pollution prevention and good Public Works Director housekeeping practices. Vehicle Washing Maintain measures to minimize or prevent X X X X X Stormwater Engineer contamination of stormwater runoff from all areas used Public Works Director for vehicle and equipment cleaning. Page 24 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.6.2 Affected Operations The City of Graham operates a municipal building that serves as a City hall and fire station, a police station, a Public Works vehicle and equipment storage yard, and a maintenance facility for the Parks & Recreation Department. All vehicles, equipment, and materials at the storage yard and Park maintenance facility are stored in covered buildings. There are no floor drains in any of the buildings at these two facilities. 7.6.3 Training Training materials have been developed on pollution prevention for public facilities, using similar materials as will be used in the public outreach program. All employees will be educated on the need for controls to protect stormwater from exposure to potential pollutants. This training will also serve as the training requirement for public employees as specified in the outreach component of the Illicit Discharge section of this program. All public employees involved in vehicle, open space, or building maintenance operations will be provided training in BMPs, the processes and materials they are working with, safety hazards, practices for preventing discharges, and procedures for responding quickly and properly to toxic and hazardous material incidents. All public employees involved in stormwater drainage system maintenance will be specifically trained in the disposal of floatables, grit, sediment, and other pollutants removed from the system. Additional training, or certification, will be provided to employees that manage and apply chemicals for control of dust, pests, vermin, and weeds and/or to enhance the growth or condition of public urban landscape and recreation facilities. Training will target the safe and effective application, storage and disposal of chemicals used. 7.6.4 Maintenance and Inspections A preventive maintenance program has been developed that includes routine inspections of catch basins and other stormwater systems for the municipal building and vehicle storage yard. The objective of the inspections is to reduce pollutant loading from municipal sites. Inspections include noting any problems or issues that may have an impact on stormwater quality, and any corrective actions needed. Schedules, procedures, and a record -keeping system are used to schedule and document inspections. Page 25 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.6.5 Vehicular Operations All vehicles, equipment, and associated material at both the Public Works and Parks & Rec. facilities are stored inside buildings. The Public Works vehicles (pickup and dump trucks) are currently washed outside, with the untreated wash water discharging into a nearby drainage ditch. Washing of these vehicles at another location has been investigated but is non -cost effective and pollution runoff is minimized by runoff not going across impervious areas and not going directly into surface waters. Minor vehicle and equipment maintenance take place at these facilities. 7.6.6 Waste Disposal Garbage, recyclables, and heavy trash collection are contracted out to private companies. 7.6.7 Flood Management Projects Future flood management projects will be reviewed from a water quality standpoint. 7.6.8 Decision Process The most effective and practical BMPs for minimizing stormwater pollution were selected for this program. 7.6.9 Evaluation The pollution prevention/good housekeeping for municipal operations program will be evaluated based on how each individual BMP is meeting its measurable goal at the end of each reporting period. Changes will be considered for any BMPs that are not meeting the measurable goals. Page 26 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.7 TOTAL MAXIMUM DAILY LOADS (TMDL) .1 BMP Summary Table BMP Measurable Goals YIR Y2R Y3R Y4R Y5R Responsible Position/Party Establish if a TMDL exists on a Verify TMDL's annually. X X X X X Stormwater Engineer receiving water of the MS4 Identify, Describe, and Map Identify watershed WLA for stormwater, describe X Stormwater Engineer watershed, outfalls, and streams. watershed, map watershed, identify location of major outfalls in watershed, identify impaired streams in watershed, and identify schedule to discover and locate other possible contributing sources. Existing Measures Create Water Quality Recovery Program. X Stormwater Engineer Monitoring Plan Create and submit to NC DWQ a monitoring program X Stormwater Engineer for each pollutant of concern in the TMDL. Additional Measures Additional measures that improve water quality may be X X X Stormwater Engineer started as needed. Implementation Plan Determine final implementation schedule, including X Stormwater Engineer when in the permit additional items will be implemented. Incremental Success Determine if and/or how incremental success will be X Stormwater Engineer measured. Annual Assessment Submit Annual Report on program to DWQ X X X X X Stormwater Engineer Page 27 COMPREHENSIVE STORMWATER MANAGEMENT PROGRAM REPORT CITY OF GRAHAM 7.7.2 Determination of TMDL's A TMDL on a receiving water with a stormwater Waste Load Allocation (WLA) will trigger the need for compliance with this section of the CSWMP. A TMDL with no WLA will not require a Water Quality Recovery Plan, but rather the need to evaluate existing strategies and if any can be tailored or expanded to improve the water quality in the TMDL watershed. 7.7.3 Establishing a Water Quality Recovery Plan Based on the above schedule the City of Graham would begin creating a Water Quality Recovery Plan (WARP) within 12 months of establishment of the TMDL, would have evaluated existing measures within 24 months, developed a monitoring plan within 36 months, and would be implementing or have planned for implementation within 48 months. The WQRP would be submitted and approved by NC DWQ and EPA. 7.7.4 Decision Process TMDL planning and implementation will be done in an effort to improve water quality and with the approval of NC DWQ staff. 7.7.5 Evaluation Progress toward restoring water quality standards will be difficult to determine and most evaluation tools will be based upon programs rather than through water quality monitoring or water quality improvements. While the goal of a WQRP is to improve water quality standards, the NPDES MS4 permit obligation is to reduce non -point source pollutant loading to the maximum extent practicable (MEP). The MS4 is not required to meet water quality standards. Evaluation of successful techniques will be evaluated over time, probably multiple permit cycles. Page 28