Loading...
HomeMy WebLinkAboutWQ0034386_Staff Report_20211026State of North Carolina Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ❑ NPDES Unit ® Non -Discharge Unit Attn: Poorva Mokashi From: Will Hart Washington Regional Office Application No.: WQ0034386 Facility name: LaGrange WWTP Note: This form has been adapted from the non -discharge facility staff report to document the review of both non - discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: Sep 13.2021 b. Site visit conducted by: Paul Mays and Will Hart c. Inspection report attached? ❑ Yes or ® No d. Person contacted: J Wesley Sutton and their contact information: ( ) - ext. e. Driving directions: Turn east onto King St from NC Hwy 903 in LaGrange; facility is located at end of road. II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A ORC: J Wesley Sutton Certificate #: Backup ORC: Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or n No If no, please explain: Description of existing facilities: Proposed flow: Current permitted flow: Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ® Yes or n No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No If yes, please explain: 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or n No If no, please explain: FORM: WQROSSR 04-14 Page 1 of 3 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? n Yes or ® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or n No If no, please explain: 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A 12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No Please summarize any findings resulting from this review: Irrigation at this facility occurs only in response to crop needs; groundwater monitoring is not required. Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No If yes, please explain: 14. Check all that apply: ® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ® N/A If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? nYes ®NonN/A If yes, please explain: III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? n Yes or ® No If yes, please explain: 2. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ® Hold, pending review of draft permit by regional office n Issue upon receipt of needed additional information Issue Deny (Please state reasons: ) 3. Signature of report preparer: W u H"''x Signature of regional supervisor: RoLvix T.cy.zc( 10/26/2021 Date: FORM: WQROSSR 04-14 Page 2 of 3 IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS Irrigation has not taken place at the facility since September 2020. FORM: WQROSSR 04-14 Page 3 of 3