Loading...
HomeMy WebLinkAboutWQ0029411_Regional Office Historical File Pre 2018fT` , r0- o,�� wAr�9Q6 ed r 0 -S Michael F.' Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W.'Klimek, P.E. Director Division of Water Quality `October 14, 2005 -Mr. ML.;Brannon, Controller/Assistant:Secretary Vulcan :Construction 'Materials, :L.P. ;PO:Box42313' Winston-Salem, :North 'Carolina 27115 Subject: Permit°No..WQ0029411 Pineville•Quarry:Employee'Building :Sewer Vulcan:Construction Materials, :L.P. •C-MU TRACKING#600-05-564 Mecklenburg County, :North Carolina Dear Mr. Brannon: _ -In:accordancelwith yauraapplication:received ;on 'September.28, 2005, :we'areforwarding :herewith:Permit'No.WQ0029411, dated October 14, 2005, toVulcan'Construction'Materials,L.P. for .the constructionand'operation of thesubject wastewater coliection:system extension. This ,permit shall ibe efectivefrom•the date.of:issuance until rescinded, ,and shall'be-subject:tothe conditions and • {limitations -as specified therein. This-cover:letter shall .be considered .,a part.ofthisperniit and .is therefore- incorporated therein by ;reference. • Please ;pay; particular'.attention to :Permit tCondition .3 'which _requires .that the wastewater collection facilities be:properly ;operated :and maintained 'in ccordance with 15A:NCAC 2H-.0227•or:an_y !individual- system -wide, collection'system :permitissued to theTermittee. Permitting of this ,project does not -constitute ,an acceptance of any part dfthe project that does not :meet 1) 1 5A NCAC 2H .:0200; 2) the Division of .Water Quality's -(Division) -Gravity :Sewer .Minimum Design_ Criteria'` adopted ;February `12, 1996, as applicable; ,-3)-,:and lhe. Division's Minimum ,Design =-Criteria for;Ahe _FastTrack Permitting ,of Pump Stations and Force Mains ,adopted'.June 1„ 2000, ,as :applicable; {unless specifically mentioned 'herein. Division :approval is based ,on acceptance of the ;certification provided :by -a 1North ;Carolina=licensed :Professional Engineer•:in the application. 'It .shall be the Permittee's 7responsibility to •ensure that the as -constructed project ,meets .the -appropriate design .criteria and rules.- :Failure to comply may 'result in ;penalties in accordance with .North Carolina' General :Statute ,:§143215:6A. through §143 215:6C, -construction of additional ,or replacement wastewater collection facilities, and/or referral of the North ,Carolina -licensed Professional. Engineer to the licensing board_ -Mooresville Regional Office 610 East Center Ave., Suite 30I Mooresville, NC 28115 Phone: (704) 663-1699 Fax: (704) 663-6040 Internet h2o.enr.state.nc.us Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper No ` Carom; ,Natura4 Mr. Brannon Page 2 October 14, 2005 In accordance with -the provisions of Article 21 of Chapter 143, General'Statutes of North Carolina as amended,-andother: applicable Laws, 'Rules, and Regulations, permission is hereby granted to Vulcan Construction .Materials, L.P.:for the construction and operation of approximately 532 linear feet of 8-inch gravity sewer as part of the Pineville Quarry Employee Building Sewer project, and the•discharge-of 840 gallons per day of collected domestic .wastewater •into -the Charlotte -Mecklenburg Utilities existing sewerage system, .pursuant to the,application received -September 28, 2005, and in :conformity =with 15A NCAC2H .0200;the-Division's Gravity Sewer -Minimum- Design 'Criteria .adopted February12, 1996, as applicable; .theDivision's"Minimum:Design Criteria for the -Fast -Track Permitting of Pump°Stations-andForce"Mains adopted -June 1, 2000,.as.applicable; :and other supporting data subsequentlyfiled and:approved..by:thewDepartment of:Environment and.Natural.Resources and -considered apart _ofthispermit. The:sewage-and: wastewater collected_by this system'shall`be.treated in .the Charlotte - Mecklenburg Utilities-WWTP.(MCAlpine;Creek'NPDES'No.'NC0024970);prior to''being discharged into the receiving stream. If.any°parts,-requirements, or limitations contained in-this_permit are unacceptable, you have the right to request an adjudicatory hearing upon written .request within 30 days foliowing:receipt ofthis ,permit. This request must'be:in the form of -a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. 'Unlesssuch demands are made, this permit shall be final and 'binding. If you -need additional -information-conceming this matter, please contact Dee Browder at (704) -663-1699. cc: Sincerely, for Alan .W..Klimek, :P:E. 'Mecklenburg County Health Department Mooresville Regional Office,:Surface:Water:Protection:(WVVTP.Permit:No. NC0024970) 'Wesley' Webb,:Alley,'Williams, Carmen &:King, Inc. 'Surface'WaterProtection:Central Files tMarie Doklovic, :P..ERCS 1 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This .permit shall become voidable unless the ;wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A 'NCAC .2H ..0200; the Division ofWater Quality's (Division) Gravity "Sewer Minimum -Design Criteria adopted "February 12, 1996, .as .applicable; :the Division's .Minimum Design :Criteria for the Fast -Track .Permitting of Pump Stations and Force "Mains adopted June 1, 2000, -as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective .only with respect to the nature and volume of wastes described in .the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an .individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is•not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times -to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively:maintained. c. An operation and maintenance. plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to .a telemetry system shall be inspected at least.once per week. -e. 'High -priority sewer.lines shall -be inspected at least once.per every six-month period;of time. f. .A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and -maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC .2B .0506(a), and public notice shall be provided as required by .North Carolina r General Statute §143-215.1 C. 1 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the -Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of .this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2H .0220, upon -completion of .construction and prior to .operation of these -permitted facilities, the ,completed •Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the -form. A complete certification is one Where the formisfully,executed and the supporting documents are provided as applicable. 7. .A .copyof the* construction record drawings shall be -maintained on file by thePermittee for the life of the iwastewater collection facilities. ' 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H :0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, '2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance .conditions, the .Permittee shall take immediate corrective action, including those as may be required by this Division, such as .the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt .the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A'NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A'NCAC 2B .0200 and 15A NCAC 2H .0500. 11. 'Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional -Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence -of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. 2 Fast Track Engineering Certification Permit No. WQ0029411 October 14, 2005 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) orstorage greater than longest past three year outage reliability option selected) for any pump stations'permitted as part of this project • (Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. - This project shall -not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that.this+ certification 'be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑'Partial ❑ Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ['weekly, ❑ full time) the construction of the Pineville Quarry Employee Building Sewer, Mecklenburg County project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer"Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable;. and other supporting materials. North Carolina. Professional Engineer's seal, signature, and date: SEND THIS 'FORM & :SUP.PORTING'DOCUMENTATION WITH REQUIRED :ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. T-TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! USE Humber: f Z� 1 (to be completed by DWQ) 1.0 (�D ATION INFORMATION 1. Owner. la. Vulcan Construction Materials, L.P. Full Legal Name (company, municipality, HOA, utility, etc.) 1 b. M. L. Brannon, Jr. - Controller/Assistant Secretary Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) 1 c. The legal entity who will own this system is: { ❑ Individual ❑ Federal ❑ Municipality ❑ State/County ❑ Private Partnership ❑ Corporation CI Other (specify): L.P. 1 d. P.O. Box 4239 _ 1 e. Winston-Salem Mailing Address City 1 f. NC lg. 27115-4239 State Zip Code 1 h. (336) 767-4600 _1 i. (336) 744-2019 1 j. knopft@vmcmail.com Telephone Facsimile E-mail .V g Project (Facility) Information: EL 2a. Pineville Quarry Employee Building Sewer 12b. Mecklenburg Q„ Brief Project Name (permit will refer to this name) I County Where Project is Located "a 3. Contact Person: 4t 3a. Tim Knopf - Environmental Engineer Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. (336) 767-4600 3c. knopft@vmcmail.com Phone Number E-mail EFORMATION. 1. Project is Et New ❑ Modification (of an existing permit) If Modification, Permit No.: For modifications, attach a separate sheet clearly explaining the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is IN Public (skip to Item B(3)) ® Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one) E Retaining Ownership (i.e. store, church, single office, etc.) or • Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) ■ Public Utility (Instruction III) ❑ Homeowner Assoc./Developer (instruction IV) 3. Charlotte -Mecklenburg Utilities Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a. McAlpine Creek 4b. NC0024970 Name of WWfF WWTF Permit No. Z 5a. Vulcan Construction Materials. L.P. 5b. 8" ® Gravity 5c. WQ0028739 I, Owner of Downstream Sewer Receiving Sewer Size ❑ Force Main Permit Number of Downstream Sewer (if known) 5 6. The origin of this wastewater is (check all that apply): W• EL m ❑ IN ❑ Residential Subdivision Apartments/Condominiums Mobile Home Park School ICI Car Wash El Institution • Hospital ❑ Church 100 % Domestic/Commercial % Industrial • Restaurant ❑ Nursing Home % Other s eci (p)' ® Office 0 Other (specify): 7. Volume of wastewater to be allocated for this particular project: 840 gallons per day *Do not include previously permitted allocations 8. If the permitted flow is zero, indicate why: ❑ Interceptor Line - Flow will be permitted in subsequent permits that connect to this line ■ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected FTA 02/03 - Rev. 3 04/05 FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PA B. PERMIT INFORMATION (CONTINUED) 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(1)(1-2) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(1)(3). Per Flow Acceptance Letter and Attachment: (25 gpd/person/shift x 12 persons x 2 shifts) + (10 gpd/person/shift x 12 persons x 2 shifts)= 840 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) Gravity or Force Main (use the pull down menu) 8 532 Gravity ENTER TOTAL LINE LENGTH IN MILES 0.10 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID (self chosen - as shown on plans for cross-reference) Design Flow (MGD) Operational Point GPM t TDH Power Reliability Option (1- dual line feed; 2- permanent generator w/ATS; 3- portable generatorw/telemetry; 4-wet well storage) 12. Does the sewer system comply Mains (latest version), the with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? reference the pertinent minimum design criteria or regulation and indicate why a is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS TO THE VARIANCE WITH YOUR APPLICATION E Yes 0 No If no, please variance PERTINENT 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? Sedimentation and Erosion Control Plan? Stormwater? ❑ Yes ❑ No ® N/A ❑ Yes ■ No E N/A E N/A • Yes ■ No 14. Does this project involve aerial lines or siphons? ❑ 'These lines will be considered high priority and must be checked once every six months FTA 02/03 - Rev. 3 04/05 0 TRACE: APPLICATION for GRAVITY SEWERS, PUMP STATIONS, ANI) FORCE- MA.i.NS PAGE Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 0210 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: 3 A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody, AND,. CEI A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on map for cross-reference) Waterbody Strea Waterbody County River Basin Index Name of bruit the 8.6" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is provided/ Applicant's Certification. Waterbody Classification !, M. L. Brannon, Jr., attest that this application for Pineville Quarry Employee Building Sewer has been reviewed by me and is accurate and complete to the best of my knowledge. ! understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certifca'tion in any application shall be guilty of a Class 2 misdemeanor winch may include a fine not to exceed $10,000 as civil pe :alties up to $25, 000 per violation. Signing • icial Signal Professional Engineer's Certification. Date l attest that this application for Pineville Quarry Employee Building Sewer has been reviewed by me and is accurate, complete and consistent with the information !n the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations Gravity Sewer Minimum Design Criteria? for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that l have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215, 68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $70,000 as well as civil penalties up to $25,000 per violation. 2a, Wesley Webb, P.E. Professional Engineer Name 2b. Alley, Williams, Carmen & Kin�M, Inc. Engineering Firm 2c. 120 South Main Street Mailing Address 2d. Kannap©Iis City 2g. (704) 938-1 Telephone 2e. NC 2f.28081 State Zip 5 2h, 704 938-8f310 2i, wwebb awck.co Facsimile E-mail SEAL 16' i9nature t Date FTA 02,/0 - Rey, 3 04,/05 •(CIX CHARLOTTE. CHARLOTTE-MECKLENBURG UTILITIES September 26, 2005 Mr. Randy Casper Ailey, Williams. Carmen & King P.O. Box 1248 Kannapolis, NC 28082-1248 SUBJECT: WATER AND SANITARY SEWER FLOW ACCEPTANCE VULCAN CONSTRUCTION MATERIALS, L.P. — EMPLOYEE BUILDING TAX PARCEL# 205-131-02 C-MU# 600.05.564 Dear Mr. Casper: In response to your request, a flow acceptance study of the subject site has been completed and it has been determined that the discharge from this project does not transmit through areas of SSO concem by the NCDENR, Division of Water Quality. Please see attached map. Upon completion and acceptance of all necessary sewer lines, Charlotte -Mecklenburg Utilities (C-MU) agrees to accept the gravity sewage flow of 840 gallons per day (see attached flow calculations) from this project for transmission to the McAlpine Creek Wastewater Treatment Plant NPDES permit number NC0024970, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works; which is contingent upon final acceptance and issuance of a discharge permit from the appropriate local, State, or Federal Agency, whichever might have control. Upon completion and acceptance of all necessary water mains, C-MU agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, dated January 2000, (WSMP # 00- 00251 & PWS ID # 0160010), on fIe with the Public Water Supply Section of NCDENR. However, C-MU cannot guarantee a constant pressure or quality of flow. This agreement is also contingent upon approval by the Division of Environment, Health, and Natural Resources. C-MU does not expect any of the above conditions to preclude water or sewer service to the subject site. However, the applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the C-MU system is accepted on a first come, first served basis. If you have any questions, please contact me at (704) 391-5129. Sincerely, CHARLOTTE-MECKLENBURG UTILITIES Barbara Gross Engineering Assistant CHARLOTTE•MECKLENBURG Ui1U 11ES Customer Service Division • New Services Section www.cmutilities.com 5100 Brookshire Boulevard Charlotte, NC 28216 n►.. 74 AI JY)')l ov Per North Carolina Administrative Code 15A NCAC 2H .0219(1): Total Flow = Office Use Flow + Bath Flow Total Flow = (25 gpd/person/shift) x (12 persons) x (2 shifts) + (10 gpd/person/shift) x (12 persons) x (2 shifts) Total Flow = 840 gpd Z1M©untain istand Basin DLong Creek Basin ©©Id Dowd Road/Paw Creek Basin RIMS Road Area =ILansbury Court Area SITE CMIJ# 600-05-564 Pineville Quarry Employee Building Sewer Vulcan Construction Materials, L.P. Mecklenburg County Fort Mill Quadrangle North Carolina 7.5 Minute Series (Topographic) Permit Number WQ0029411 Central Files: APS SWP 10/14/05 Permit Tracking Slip Program Category Status Project Type Non -discharge In review New'Project _ Permit Type Version Permit'Classification Gravity Sewer Extension, Pump Stations, &Pressure Sewer A Individual Extensions Primary Reviewer Permit Contact Affiliation dee.browder Permitted Flow 840 Facility . :Facility Name Pineville Quarry Employee Building Sewer Location Address Owner 'Major/Minor .Region Minor 'Mooresville County 'Mecklenburg Facility Contact Affiliation Owner Name. Owner Type Vulcan Construction Materials: LP Non -Government Owner Affiliation ID Kimel .P0 Box 4239 'Winston Salem Dates/Events `NC 27115 orig Issue App Received 09/28/05 Draft Initiated Scheduled Issuance Public Notice Issue. 'Effective Expiration Regulated Activities Requested/Received Events Commercial or industrial, other Additional information requested Wastewater collection Additional information received Dutfail NLJLL Waterbody Name Stream Index Number Current Class Subbasin 111 September 30, 2005 NC Division of Environmental Management Department of Environment and Natural Resources — Division of Water Quality 610E. Center Avenue, Suite 301 Mooresville, North Carolina 28115 Re: Pineville Quarry Employee Building Sewer Vulcan Construction Materials. L.P. - MecklenburgMecklenhurg County Dear Sir or Madam: 05505 Please find attached for your review and approval the original and one copy of the permit application., two copies of the flow acceptance letter, a copy of the USGS quadrangle map showing the location of the sewer improvement, and a check in the amount of $4110.00 for the processing fee. This project will be installed in accordance with the applicable regulations "Gravity Sewer Minimum Design Criteria." This project consists of the construction of approximately 532 linear feet of privately owned 8" DIP gravity flow sanitary sewer. The average daily :flow for this line is 840 gpd. Please call m- at 704-938-1515 if you have any questions. Sincerely, ALLEY, WILLIAMS, CARMEN & JUNG, INC. Wesley 'Webb, P.E. 05505 ,j4i Sewer Permit Letler.doe WA AND "7 7:URCt:i.„, CFRer SEP 2 e 120 South Maln Streel 6 PO. Box. 1248 Kannaporis, North Cararla '28082 938-1515 * Fax - (C,7 93'8-6810 aw (1<. corn SECT Si•:n nrjuiii".Pr44 Page 1 of 1 Elaine F Marsha Secretary Corporations 'Corporations Home 'Important Notice 'Corporate Forms/Fees 'Corporations FAQ 'Tobacco Manufacturers 'Dissolution Reports 'Non -Profit Reports 'Verify Certification *Online Annual Reports Links 'Secretary Of State Home "Register for E-Procurement 'Dept. of Revenue Legislation '1999 Senate Bills '2001 Bill Summaries 'Annual Reports 1997 'Corporations 1997 'Other Legislation Search 'By Corporate Name 'For New Corporation 'By Registered Agent Online Orders 'Start An Order 'New Payment Procedures Contact Us 'Corporations Division Secretary of State"s web site Print ''Printable Page North Carolina DEPARTMENT OF THE ECRETARY OF STATE Po Box 29622 Raleigh, NC 27626-0622 (919) -2000 Date: 10/14/2005 Click here to: View Document Filings I Corporation Names Name Name Type NC Vulcan Construction Materials, Limited Legal Partnership III Vulcan Construction Materials, LP mited Partnerships Information Home State SOSID: FID: County: Status: Date Formed: Citizenship: State of Inc.: Duration: Registered Agent 0991154 Unknown Current -Active 10/30/1998 Foreign DE perpetual Agent. Name: Registered Office Address: Registered Mailing Address: Principal Office Address: Principal Mailing Address: Corporation Service Company 327 Hillsborough Street Raleigh NC 27603 327 Hillsborough Street Raleigh NC 27603 1209 Orange Street Wilmington DE 19801 No Address For questions or comments about the North Carolina Secretary of State's web site, please send e- mail to Webmastor. http://www,secreta.ry.statemc.us/Corpora ns/Corp.aspx?Pitcmid-2103829 10%t4/2005