Loading...
HomeMy WebLinkAbout20071009 Ver 1_Approval Letter_20070716t ~~' r-4, „f ~~ ~' Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality July 16, 2007 DWQ No. 07-1009 Guilford County Dr. Gregory J. Thorpe, PhD., Manager Planning and Environmental Branch North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina, 27699-1548 Re: Replacement of Bridge No. 73 over Bull Run Creek on SR 1549 in Guilford County Federal Aid Project No. BRZ-1549(4), State Project No. 8.2497601, TIP B-4128. Bull Run Creek [03-06-08; WS-IV] APPROVAL of RANDLEMAN RIVER BUFFER RULES "GENERAL" MAJOR VARIANCE AUTHORIZATION CERTIFICATE with ADDITIONAL CONDITIONS Dear Dr. Thorpe, You have our approval under the "General" Major Variance to the Randleman River Buffer Rules, in accordance with the conditions listed below, for the following impacts for the purpose of the replacement of Bridge No. 73 on SR 1549 in Guilford County: Ranrllaman River Rlnarian Buffer ImnaCtS Site Zone 1 ~ (s . ft.) v Zone 2 (s . ft.) Mitigation Required Zone 1 (s . ft.) Mitigation Required Zone 2 s . ft.) Bridge 3238 0 9714 0 A roach Fill 1408 2684 - 4224 4026 Standard Base Ditch 1307 781 3921 1172 Utilit Crossin 568 144 1704 216 Totals: 6521 3609 19563 5414 The project shall be constructed according to your application dated June 6, 2007 and any conditions listed below. This approval shall act as your Authorization Certificate as required within the Randleman River Riparian Buffer Rules (i5A NCAC 2B .0250). In addition, you should get any other required federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control. This approval is only valid for the purpose and design that you described in your application dated June 6, 2007. If you change your project, you must notify us and you maybe required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization and approval letter and is thereby responsible for complying with all conditions. For this approval to be valid, you must follow the conditions listed below. No thCarolina Transportation Permitting Unit ~atuCa~~y 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-6893 /Internet: htt~;//h2o.enr_state.nc_us/ncwetlands An Equal OpportunitylAffirmativeRction Employer - 50% Recycledl10% Post Consumer Paper Michael F. Easley, Governor ~1; ~,`;' /~, f.~~ William G. Ross Jr., Secretary ~_ G~ ` ,,,3~ North Carolina Department of Environment and Natural Resources - ~ ~>-~~; Coleen Sullins, Director cr j ~_ ~ ~ Division of Water Quality ~_ ~ ~~ -°1 ~ .~ 1. Upon removal of the temporary detour bridge the area impacted shall be restored to pre-construction conditions immediately after removal of the temporary approach and temporary bridge. Per your application submittal, the area will be restored to natural contours and native woody vegetation shall be conducted as soon as possible and not later than sixteen (16) months after construction and shall include planting of trees so that at the end of five years shall consist (at a minimum) of two different hardwood species at a density of 320 trees per acre. 2. Compensatory mitigation for the impacts to 10,130 square feet of protected riparian buffers shall be required. We understand that you have chosen to perform compensatory mitigation for impacts to protected buffers through use of the North Carolina Ecosystem Enhancement Program (EEP). Mitigation for unavoidable impacts to Randleman Riparian Buffers shall be provided in Randleman Watershed of the Cape Fear River Basin and done in accordance with the Randleman General Major Variance. EEP has indicated in a letter dated May 14, 2007 that they will assume responsibility for satisfying the compensatory mitigation requirements for the above-referenced project, in accordance with the Tri-Party MOA signed on July 22, 2003 and the Dual-Party MOA signed on April 12, 2004. If you do not accept any of the conditions of this authorization, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This authorization and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality and ee cont ct Sue Homewood at1336' 7e1e4964ation required in 15A NCAC 2B .0250(2). If you have any questions, p -- mce ly, r' ~- C~iQ~ Coleen Sullins ------ Director cc: Erica McLamb, NCDOT PDEA Andy Williams, US Army Corps of Engineers, Raleigh Field Office Ecosystem Enhancement Program DWQ Winston-Salem Regional Office DWQ Transportation Permitting Unit NorthCazolina naturally Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http://h2o.enr.state.nc.uslncwetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper